메뉴 건너뛰기




Volumn 46, Issue 2, 2001, Pages 139-147

Scheduling approach for concurrent product development processes

Author keywords

Concurrent engineering; Genetic algorithm; Heuristic algorithm; Optimization scheduling; Product development process

Indexed keywords

HEURISTIC ALGORITHM; PRODUCT DEVELOPMENT PROCESS;

EID: 1542598600     PISSN: 01663615     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0166-3615(01)00120-8     Document Type: Article
Times cited : (13)

References (15)
  • 1
    • 0019342681 scopus 로고
    • Scheduling subject to resource constraints: Classification and complexity
    • J. Blazewicz, J.K. Lenstra, A.H.G.R. Kan, Scheduling subject to resource constraints: classification and complexity, Discrete Applied Mathematics 5 (1983) 11-24.
    • (1983) Discrete Applied Mathematics , vol.5 , pp. 11-24
    • Blazewicz, J.1    Lenstra, J.K.2    Kan, A.H.G.R.3
  • 4
    • 0033738588 scopus 로고    scopus 로고
    • Concurrent engineering and virtual reality for human resource planning
    • V.G. Duffy, G. Salvendy, Concurrent engineering and virtual reality for human resource planning, Computers in Industry 42 (2000) 109-125.
    • (2000) Computers in Industry , vol.42 , pp. 109-125
    • Duffy, V.G.1    Salvendy, G.2
  • 5
    • 0033115501 scopus 로고    scopus 로고
    • An object-oriented constraints-based system for concurrent product development
    • A. Gayretli, H.S. Abdalla, An object-oriented constraints-based system for concurrent product development, Robotics and Computer-Integrated Manufacturing 15 (1999) 133-144.
    • (1999) Robotics and Computer-Integrated Manufacturing , vol.15 , pp. 133-144
    • Gayretli, A.1    Abdalla, H.S.2
  • 6
    • 0033079793 scopus 로고    scopus 로고
    • A concurrent optimization methodology for concurrent engineering
    • M. Hatch, R.D. Badienelli, A concurrent optimization methodology for concurrent engineering, IEEE Trans, on Engineering Management 46 (1999) 72-86.
    • (1999) IEEE Trans, on Engineering Management , vol.46 , pp. 72-86
    • Hatch, M.1    Badienelli, R.D.2
  • 7
    • 0032292134 scopus 로고    scopus 로고
    • Modeling ordered decision making in product development
    • V. Krishnan, Modeling ordered decision making in product development, European Journal of Operational Research 111 (1998) 351-368.
    • (1998) European Journal of Operational Research , vol.111 , pp. 351-368
    • Krishnan, V.1
  • 9
    • 0002614325 scopus 로고    scopus 로고
    • A genetic algorithm approach to a general category project scheduling problem
    • L. Ozdamar, A genetic algorithm approach to a general category project scheduling problem, IEEE Trans, on Systems, Men and Cybernetics: Part C 29 (1999) 44-59.
    • (1999) IEEE Trans, on Systems, Men and Cybernetics: Part C , vol.29 , pp. 44-59
    • Ozdamar, L.1
  • 10
    • 0031084622 scopus 로고    scopus 로고
    • Identifying controlling features of engineering design iteration
    • R.P. Smith, S.D. Eppinger, Identifying controlling features of engineering design iteration, Management Science 43 (1997) 276-293.
    • (1997) Management Science , vol.43 , pp. 276-293
    • Smith, R.P.1    Eppinger, S.D.2
  • 11
    • 0031199079 scopus 로고    scopus 로고
    • A predictive model of sequential iteration in engineering design
    • R.P. Smith, S.D. Eppinger, A predictive model of sequential iteration in engineering design, Management Science 43 (1997) 1104-1120.
    • (1997) Management Science , vol.43 , pp. 1104-1120
    • Smith, R.P.1    Eppinger, S.D.2
  • 12
  • 13
    • 0002128393 scopus 로고    scopus 로고
    • Information technologies and developments of enterprises
    • C. Wu, Information technologies and developments of enterprises, Computer Integrated Manufacturing Systems 3 (1997) 3-7.
    • (1997) Computer Integrated Manufacturing Systems , vol.3 , pp. 3-7
    • Wu, C.1
  • 15
    • 0030157201 scopus 로고    scopus 로고
    • The research on collective techniques and executive methods for concurrent engineering
    • G.L. Xiong, Y.Y. Zhang, B.H. Li, The research on collective techniques and executive methods for concurrent engineering, Computer Integrated Manufacturing Systems 3 (1996) 3-8.
    • (1996) Computer Integrated Manufacturing Systems , vol.3 , pp. 3-8
    • Xiong, G.L.1    Zhang, Y.Y.2    Li, B.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.