-
1
-
-
0001558332
-
Scheduling to minimize the number of late jobs when set-up and processing times are uncertain
-
S.J. Balut Scheduling to minimize the number of late jobs when set-up and processing times are uncertain Management Science 19 1973 1283 1288
-
(1973)
Management Science
, vol.19
, pp. 1283-1288
-
-
Balut, S.J.1
-
2
-
-
0022761988
-
Minimizing the expected weighted number of tardy jobs in stochastic flow shops
-
O.J. Boxma, and F.G. Forst Minimizing the expected weighted number of tardy jobs in stochastic flow shops Operations Research Letters 5 1986 119 126
-
(1986)
Operations Research Letters
, vol.5
, pp. 119-126
-
-
Boxma, O.J.1
Forst, F.G.2
-
3
-
-
0031234090
-
Scheduling stochastic jobs with asymmetric earliness and tardiness penalties
-
X. Cai, and S. Zhou Scheduling stochastic jobs with asymmetric earliness and tardiness penalties Naval Research Logistics 44 1997 531 557
-
(1997)
Naval Research Logistics
, vol.44
, pp. 531-557
-
-
Cai, X.1
Zhou, S.2
-
4
-
-
0000797681
-
Rearrangement, majorization and stochastic scheduling
-
C. Chang, and D.D. Yao Rearrangement, majorization and stochastic scheduling Mathematics of Operations Research 18 1993 658 684
-
(1993)
Mathematics of Operations Research
, vol.18
, pp. 658-684
-
-
Chang, C.1
Yao, D.D.2
-
5
-
-
0025898245
-
On the minimization of the weighted number of tardy jobs with random processing times and deadline
-
P. De, J.B. Ghosh, and C.E. Wells On the minimization of the weighted number of tardy jobs with random processing times and deadline Computers and Operations Research 18 1991 457 463
-
(1991)
Computers and Operations Research
, vol.18
, pp. 457-463
-
-
De, P.1
Ghosh, J.B.2
Wells, C.E.3
-
6
-
-
0036567985
-
Dynamic scheduling of stochastic jobs on a single machine
-
Jang, W. (2002). Dynamic scheduling of stochastic jobs on a single machine. European Journal of Operational Research, 138, 518-530.
-
(2002)
European Journal of Operational Research
, vol.138
, pp. 518-530
-
-
Jang, W.1
-
7
-
-
0001258516
-
On Balut's algorithm and NP-completeness for a chance-constrained scheduling problem
-
H. Kise, and T. Ibaraki On Balut's algorithm and NP-completeness for a chance-constrained scheduling problem Management Science 29 1983 384 388
-
(1983)
Management Science
, vol.29
, pp. 384-388
-
-
Kise, H.1
Ibaraki, T.2
-
8
-
-
0029290455
-
Single-machine stochastic scheduling with dual criteria
-
C. Lin, and C. Lee Single-machine stochastic scheduling with dual criteria IIE Transactions 27 1995 244 249
-
(1995)
IIE Transactions
, vol.27
, pp. 244-249
-
-
Lin, C.1
Lee, C.2
-
10
-
-
0020748381
-
Stochastic scheduling with release dates and due dates
-
M. Pinedo Stochastic scheduling with release dates and due dates Operations Research 31 1983 559 572
-
(1983)
Operations Research
, vol.31
, pp. 559-572
-
-
Pinedo, M.1
-
13
-
-
0026123423
-
Sequencing jobs on a single machine with a common due dates and stochastic processing times
-
S.C. Sarin, E. Erel, and G. Steiner Sequencing jobs on a single machine with a common due dates and stochastic processing times European Journal of Operational Research 51 1991 188 198
-
(1991)
European Journal of Operational Research
, vol.51
, pp. 188-198
-
-
Sarin, S.C.1
Erel, E.2
Steiner, G.3
-
14
-
-
0028768513
-
The stochastic single machine scheduling problem with earliness and tardiness costs
-
H.M. Soroush, and L.D. Fredendall The stochastic single machine scheduling problem with earliness and tardiness costs European Journal of Operational Research 54 1994 287 302
-
(1994)
European Journal of Operational Research
, vol.54
, pp. 287-302
-
-
Soroush, H.M.1
Fredendall, L.D.2
|