-
1
-
-
0025489275
-
Minimizing the Weighted Sum of Late and Early Completion Penalties in a Single Machine
-
Ahmed, M., and Sundararghavan, P., "Minimizing the Weighted Sum of Late and Early Completion Penalties in a Single Machine," IIE Transactions, 22, 288-290 (1990).
-
(1990)
IIE Transactions
, vol.22
, pp. 288-290
-
-
Ahmed, M.1
Sundararghavan, P.2
-
2
-
-
0028494795
-
Minimization of Total Absolute Flow Time Deviation in Single and Multiple Machine Scheduling
-
Alidaee, B., Kochenberger, G.A., and Ahmadian, A., "Minimization of Total Absolute Flow Time Deviation in Single and Multiple Machine Scheduling," Journal of the Operational Research Society, 45, 1077-1087 (1994).
-
(1994)
Journal of the Operational Research Society
, vol.45
, pp. 1077-1087
-
-
Alidaee, B.1
Kochenberger, G.A.2
Ahmadian, A.3
-
3
-
-
0023440150
-
Minimizing Absolute and Squared Deviations of Completion Times with Different Earliness and Tardiness Penalties and a Common Due Date
-
Bagchi, U., Chang, Y.L., and Sullivan, R.S., "Minimizing Absolute and Squared Deviations of Completion Times with Different Earliness and Tardiness Penalties and a Common Due Date," Naval Research Logistics, 34, 739-751 (1987).
-
(1987)
Naval Research Logistics
, vol.34
, pp. 739-751
-
-
Bagchi, U.1
Chang, Y.L.2
Sullivan, R.S.3
-
4
-
-
0025211593
-
Sequencing with Earliness and Tardiness Penalties: A Review
-
Baker, K.R., and Scudder, G.D., "Sequencing with Earliness and Tardiness Penalties: A Review," Operations Research. 38, 22-36 (1990).
-
(1990)
Operations Research
, vol.38
, pp. 22-36
-
-
Baker, K.R.1
Scudder, G.D.2
-
5
-
-
0001558332
-
Scheduling to Minimize the Number of Late Jobs when Set-Up and Processing Times are Uncertain
-
Balut, S.J., "Scheduling to Minimize the Number of Late Jobs when Set-Up and Processing Times are Uncertain," Management Science, 19, 1283-1288 (1973).
-
(1973)
Management Science
, vol.19
, pp. 1283-1288
-
-
Balut, S.J.1
-
6
-
-
0015665552
-
N-Job, One Machine Sequencing Problems under Uncertainty
-
Blau, R.A., "N-Job, One Machine Sequencing Problems under Uncertainty," Management Science, 20, 101-109 (1973).
-
(1973)
Management Science
, vol.20
, pp. 101-109
-
-
Blau, R.A.1
-
7
-
-
0022761988
-
Minimizing the Expected Weighted Number of Tardy Jobs in Stochastic Flow Shops
-
Boxma, O.J., and Forst, F.G., "Minimizing the Expected Weighted Number of Tardy Jobs in Stochastic Flow Shops," Operations Research Letters, 5, 119-126 (1986).
-
(1986)
Operations Research Letters
, vol.5
, pp. 119-126
-
-
Boxma, O.J.1
Forst, F.G.2
-
8
-
-
85033180413
-
Sequencing Jobs with Random Processing Times to Minimize Weighted Completion Time Variance
-
(Special Volume on Scheduling Theory and Applications) (to be published)
-
Cai, X., and Zhou, S., "Sequencing Jobs with Random Processing Times to Minimize Weighted Completion Time Variance," Annals of Operations Research (Special Volume on Scheduling Theory and Applications) (to be published).
-
Annals of Operations Research
-
-
Cai, X.1
Zhou, S.2
-
9
-
-
0022769182
-
Optimal Due-Date Assignment for a Single Machine Sequencing Problem with Random Processing Times
-
Cheng, T.C.E., "Optimal Due-Date Assignment for a Single Machine Sequencing Problem with Random Processing Times," International Journal of Systems Science, 17, 1139-1144 (1986).
-
(1986)
International Journal of Systems Science
, vol.17
, pp. 1139-1144
-
-
Cheng, T.C.E.1
-
10
-
-
38149143553
-
Optimal Due-Date Determination and Sequencing with Random Processing Times
-
Cheng, T.C.E., "Optimal Due-Date Determination and Sequencing with Random Processing Times," Mathematical Modelling, 9, 573-576 (1987).
-
(1987)
Mathematical Modelling
, vol.9
, pp. 573-576
-
-
Cheng, T.C.E.1
-
11
-
-
0022768284
-
A Single Machine Scheduling Problem with Random Processing Times
-
Chakravarthy, S., "A Single Machine Scheduling Problem with Random Processing Times," Naval Research Logistics, 33, 391-397 (1986).
-
(1986)
Naval Research Logistics
, vol.33
, pp. 391-397
-
-
Chakravarthy, S.1
-
12
-
-
0342927155
-
Single Machine Sequencing with Random Processing Times and Random Due Dates
-
Crabill, T.B., and Maxwell, W.L., "Single Machine Sequencing with Random Processing Times and Random Due Dates," Naval Research Logistics Quarterly, 19, 549-554 (1969).
-
(1969)
Naval Research Logistics Quarterly
, vol.19
, pp. 549-554
-
-
Crabill, T.B.1
Maxwell, W.L.2
-
13
-
-
0025898245
-
On the Minimization of the Weighted Number of Tardy Jobs with Random Processing Times and Deadline
-
De, P., Ghosh, J.B., and Wells, C.E., "On the Minimization of the Weighted Number of Tardy Jobs with Random Processing Times and Deadline," Computers and Operations Research, 18, 457-463 (1991).
-
(1991)
Computers and Operations Research
, vol.18
, pp. 457-463
-
-
De, P.1
Ghosh, J.B.2
Wells, C.E.3
-
14
-
-
0017460225
-
Minimizing Waiting Time Variance in the Single Machine Problem
-
Eilon, S., and Chowdhury, I.G., "Minimizing Waiting Time Variance in the Single Machine Problem," Management Science, 23, 567-575 (1977).
-
(1977)
Management Science
, vol.23
, pp. 567-575
-
-
Eilon, S.1
Chowdhury, I.G.2
-
15
-
-
0023531467
-
Scheduling to a Common Due Date on Parallel Common Processors
-
Emmons, H., "Scheduling to a Common Due Date on Parallel Common Processors," Naval Research Ligistics, 34, 803-810 (1987).
-
(1987)
Naval Research Ligistics
, vol.34
, pp. 803-810
-
-
Emmons, H.1
-
16
-
-
0006373314
-
Scheduling Independent Jobs with Stochastic Processing Times and a Common Due Date on Parallel and Identical Machines
-
Erel, E., and Sarin, S.C., "Scheduling Independent Jobs with Stochastic Processing Times and a Common Due Date on Parallel and Identical Machines," Annals of Operations Research, 17, 181-198 (1989).
-
(1989)
Annals of Operations Research
, vol.17
, pp. 181-198
-
-
Erel, E.1
Sarin, S.C.2
-
17
-
-
0027886805
-
Simultaneous Optimization of Efficiency and Performance Balance Measures in Single-Machine Scheduling Problems
-
Federgruen, A., and Mosheiov, G., "Simultaneous Optimization of Efficiency and Performance Balance Measures in Single-Machine Scheduling Problems," Naval Research Logistics, 40, 951-970 (1993).
-
(1993)
Naval Research Logistics
, vol.40
, pp. 951-970
-
-
Federgruen, A.1
Mosheiov, G.2
-
18
-
-
0023542419
-
Minimizing Weighted Absolute Deviation in Single Machine Scheduling
-
Fry, T.D., Armstrong, R.D., and Blackstone, J.H., "Minimizing Weighted Absolute Deviation in Single Machine Scheduling," IIE Transactions, 19, 445-450 (1987).
-
(1987)
IIE Transactions
, vol.19
, pp. 445-450
-
-
Fry, T.D.1
Armstrong, R.D.2
Blackstone, J.H.3
-
19
-
-
0026223840
-
Earliness-Tardiness Scheduling Problems. I: Weighted Deviation of Completion Times about a Common Due Date
-
Hall, N., and Posner, M.E., "Earliness-Tardiness Scheduling Problems. I: Weighted Deviation of Completion Times about a Common Due Date," Operations Research, 39, 836-846 (1991).
-
(1991)
Operations Research
, vol.39
, pp. 836-846
-
-
Hall, N.1
Posner, M.E.2
-
20
-
-
0026223827
-
Earliness-Tardiness Scheduling Problems. II: Deviation of Completion Times about a Restrictive Common Due Date
-
Hall, N., Kubiak, W., and Sethi, S.P., "Earliness-Tardiness Scheduling Problems. II: Deviation of Completion Times about a Restrictive Common Due Date," Operations Research, 39, 847-856 (1991).
-
(1991)
Operations Research
, vol.39
, pp. 847-856
-
-
Hall, N.1
Kubiak, W.2
Sethi, S.P.3
-
21
-
-
0019704009
-
Minimizing Variation of Flow Time in Single Machine Systems
-
Kanet, J.J., "Minimizing Variation of Flow Time in Single Machine Systems," Management Science, 27, 1453-1459 (1981).
-
(1981)
Management Science
, vol.27
, pp. 1453-1459
-
-
Kanet, J.J.1
-
22
-
-
0001258516
-
On Balut's Algorithm and NP-Completeness for a Chance-Constrained Scheduling Problem
-
Kise, H., and Ibaraki, T., "On Balut's Algorithm and NP-Completeness for a Chance-Constrained Scheduling Problem," Management Science, 29, 384-388 (1983).
-
(1983)
Management Science
, vol.29
, pp. 384-388
-
-
Kise, H.1
Ibaraki, T.2
-
23
-
-
0025897854
-
Minimizing Weighted Number of Tardy Jobs and Weighted Earliness-Tardiness Penalties about a Common Due Date
-
Lee, C.-Y., Danusaputro, S.L., and Lin, C.-S., "Minimizing Weighted Number of Tardy Jobs and Weighted Earliness-Tardiness Penalties about a Common Due Date," Computers and Operations Research, 18, 379-389 (1991).
-
(1991)
Computers and Operations Research
, vol.18
, pp. 379-389
-
-
Lee, C.-Y.1
Danusaputro, S.L.2
Lin, C.-S.3
-
25
-
-
0016929337
-
An Investigation of a Two-Stage Production Line with Normally Distributed Interarrival and Service Time Distributions
-
McGee, G.R., and Webster, D.B., "An Investigation of a Two-Stage Production Line with Normally Distributed Interarrival and Service Time Distributions," International Journal of Production Research, 14, 251-261 (1976).
-
(1976)
International Journal of Production Research
, vol.14
, pp. 251-261
-
-
McGee, G.R.1
Webster, D.B.2
-
26
-
-
0001002199
-
Stochastic Single Machine Scheduling with Quadratic Early-Tardy Penalties
-
Mittenthal, J., and Raghavachari, M., "Stochastic Single Machine Scheduling with Quadratic Early-Tardy Penalties," Operations Research. 41, 786-796 (1993).
-
(1993)
Operations Research
, vol.41
, pp. 786-796
-
-
Mittenthal, J.1
Raghavachari, M.2
-
27
-
-
0020103079
-
Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem
-
Panwalkar, S., Smith, M., and Seidmann, A., "Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem," Operations Research, 30, 391-399 (1982).
-
(1982)
Operations Research
, vol.30
, pp. 391-399
-
-
Panwalkar, S.1
Smith, M.2
Seidmann, A.3
-
28
-
-
0020748381
-
Stochastic Scheduling with Release Dates and Due Dates
-
Pinedo, M., "Stochastic Scheduling with Release Dates and Due Dates," Operations Research, 31, 559-572 (1983).
-
(1983)
Operations Research
, vol.31
, pp. 559-572
-
-
Pinedo, M.1
-
29
-
-
0026123423
-
Sequencing Jobs on a Single Machine with a Common Due Date and Stochastic Processing Times
-
Sarin, S.C., Erel, E., and Steiner, "Sequencing Jobs on a Single Machine with a Common Due Date and Stochastic Processing Times," European Journal of Operational Research, 51, 287-302 (1991).
-
(1991)
European Journal of Operational Research
, vol.51
, pp. 287-302
-
-
Sarin, S.C.1
Erel, E.2
Steiner3
-
30
-
-
0021439811
-
Minimizing the Sum of Absolute Lateness in Single Machine and Multimachine Scheduling
-
Sundararghavan, P., and Ahmed, M., "Minimizing the Sum of Absolute Lateness in Single Machine and Multimachine Scheduling," Naval Research Logistics, 31, 325-333 (1984).
-
(1984)
Naval Research Logistics
, vol.31
, pp. 325-333
-
-
Sundararghavan, P.1
Ahmed, M.2
-
31
-
-
0028768513
-
The Stochastic Single Machine Scheduling Problem with Earliness and Tardiness Costs
-
Soroush, H.M., and Fredendall, L.D., "The Stochastic Single Machine Scheduling Problem with Earliness and Tardiness Costs," European Journal of Operational Research, 77, 287-302 (1994).
-
(1994)
European Journal of Operational Research
, vol.77
, pp. 287-302
-
-
Soroush, H.M.1
Fredendall, L.D.2
-
32
-
-
0024755179
-
Single Machine Scheduling to Minimize Absolute Deviation of Completion Time from a Common Due Date
-
Szwarc, W., "Single Machine Scheduling to Minimize Absolute Deviation of Completion Time from a Common Due Date," Naval Research Logistics, 36, 663-673 (1989).
-
(1989)
Naval Research Logistics
, vol.36
, pp. 663-673
-
-
Szwarc, W.1
-
33
-
-
0023170104
-
Deterministic and Random Single Machine Sequencing with Variance Minimization
-
Vani, V., and Raghavachari, M., "Deterministic and Random Single Machine Sequencing with Variance Minimization," Operations Research, 35, 111-120 (1987).
-
(1987)
Operations Research
, vol.35
, pp. 111-120
-
-
Vani, V.1
Raghavachari, M.2
-
34
-
-
0023108688
-
On the Normality of Operation Times in Small-Lot Assembly Systems: A Technical Note
-
Wilhelm, W.E., "On the Normality of Operation Times in Small-Lot Assembly Systems: A Technical Note," International Journal of Production Research, 25, 145-149 (1987).
-
(1987)
International Journal of Production Research
, vol.25
, pp. 145-149
-
-
Wilhelm, W.E.1
-
35
-
-
0020178127
-
A Methodology to Describe Operating Characteristics of Assembly Systems
-
Wilhelm, W.E., and Ahmadi-Marandi, S., "A Methodology to Describe Operating Characteristics of Assembly Systems," IIE Transactions, 14, 204-213 (1982).
-
(1982)
IIE Transactions
, vol.14
, pp. 204-213
-
-
Wilhelm, W.E.1
Ahmadi-Marandi, S.2
-
36
-
-
0026158109
-
Algorithms for a Class of Single-Machine Tardiness and Earliness Problems
-
Yano, C. A., and Kim, Y.-D., "Algorithms for a Class of Single-Machine Tardiness and Earliness Problems," European Journal of Operational Research, 52, 167-178 (1991).
-
(1991)
European Journal of Operational Research
, vol.52
, pp. 167-178
-
-
Yano, C.A.1
Kim, Y.-D.2
|