메뉴 건너뛰기




Volumn 30, Issue 1, 1996, Pages 23-30

UET flow shop scheduling with delays

Author keywords

[No Author keywords available]

Indexed keywords


EID: 0030555633     PISSN: 09883754     EISSN: 28047346     Source Type: Journal    
DOI: 10.1051/ita/1996300100231     Document Type: Article
Times cited : (6)

References (5)
  • 1
    • 0016952078 scopus 로고
    • The complexity of flow shop and job shop scheduling
    • M. R. GAREY, D. S. JOHNSON and R. SETHI, The complexity of flow shop and job shop scheduling, Math. Oper. Res., 1976, 1, pp. 117-129.
    • (1976) Math. Oper. Res. , vol.1 , pp. 117-129
    • Garey, M.R.1    Johnson, D.S.2    Sethi, R.3
  • 2
    • 0003075019 scopus 로고
    • Optimal two and three stage production schedules with set-up times included
    • S. JOHNSON, Optimal two and three stage production schedules with set-up times included, Nav. Res. Log. Quart., 1954, 1, pp. 61-68.
    • (1954) Nav. Res. Log. Quart. , vol.1 , pp. 61-68
    • Johnson, S.1
  • 3
    • 85033855958 scopus 로고
    • Private communication
    • J. K. LENSTRA, Private communication, 1992.
    • (1992)
    • Lenstra, J.K.1
  • 4
    • 0041763613 scopus 로고
    • On 2 × n sequencing problem with transportation times of jobs
    • P. L. MAGGU and G. DAS, On 2 × n sequencing problem with transportation times of jobs, Pure and Applied Math. Sci., 1980, 12, No. 1-2, pp. 1-6.
    • (1980) Pure and Applied Math. Sci. , vol.12 , Issue.1-2 , pp. 1-6
    • Maggu, P.L.1    Das, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.