메뉴 건너뛰기




Volumn 20, Issue 1, 2005, Pages 102-109

Next day load curve forecasting using hybrid correction method

Author keywords

Fuzzy logic approach; Hybrid correction method; Neural network; Short term load forecasting

Indexed keywords

COMPUTER SIMULATION; FUZZY SETS; MATHEMATICAL MODELS; NEURAL NETWORKS; REGRESSION ANALYSIS;

EID: 13844320123     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2004.831256     Document Type: Article
Times cited : (116)

References (27)
  • 1
    • 0034186817 scopus 로고    scopus 로고
    • "Short-term load forecasting for special days in anomalous load conditions using neural networks and fuzzy inference method"
    • K. Kim, H. S. Youn, and Y. C. Kang, "Short-term load forecasting for special days in anomalous load conditions using neural networks and fuzzy inference method," IEEE Trans. Power Syst., vol. 15, no. 2, pp. 559-565, 2000.
    • (2000) IEEE Trans. Power Syst. , vol.15 , Issue.2 , pp. 559-565
    • Kim, K.1    Youn, H.S.2    Kang, Y.C.3
  • 2
    • 0025519319 scopus 로고
    • "A regression-based approach to short-term load forecasting"
    • A. D. Papalexopoulos and T. C. Hesterberg, "A regression-based approach to short-term load forecasting," IEEE Trans. Power Syst., vol. 5, no. 4, pp. 1535-1550, 1990.
    • (1990) IEEE Trans. Power Syst. , vol.5 , Issue.4 , pp. 1535-1550
    • Papalexopoulos, A.D.1    Hesterberg, T.C.2
  • 3
    • 0028546825 scopus 로고
    • "Regression based peak load forecasting using a transformation technique"
    • T. Haida and S. Muto, "Regression based peak load forecasting using a transformation technique," IEEE Trans. Power Syst., vol. 9, no. 4, pp. 1788-1794, 1994.
    • (1994) IEEE Trans. Power Syst. , vol.9 , Issue.4 , pp. 1788-1794
    • Haida, T.1    Muto, S.2
  • 4
    • 0027590291 scopus 로고
    • "A generalized knowledge-based short term load-forecasting technique"
    • S. Rahman and O. Hazim, "A generalized knowledge-based short term load-forecasting technique," IEEE Trans. Power Syst., vol. 8, no. 2, pp. 508-514, 1993.
    • (1993) IEEE Trans. Power Syst. , vol.8 , Issue.2 , pp. 508-514
    • Rahman, S.1    Hazim, O.2
  • 5
    • 0037505508 scopus 로고    scopus 로고
    • "Short-term load forecasting via ARMA model identification including nongaussian process considerations"
    • S. J. Huang and K. R. Shih, "Short-term load forecasting via ARMA model identification including nongaussian process considerations," IEEE Trans. Power Syst., vol. 18, no. 2, pp. 673-679, 2003.
    • (2003) IEEE Trans. Power Syst. , vol.18 , Issue.2 , pp. 673-679
    • Huang, S.J.1    Shih, K.R.2
  • 6
    • 0036577946 scopus 로고    scopus 로고
    • "A data mining approach for spatial modeling in small area load forecast"
    • H. Wu and C. Lu, "A data mining approach for spatial modeling in small area load forecast," IEEE Trans. Power Syst., vol. 17, no. 2, pp. 516-521, 2003.
    • (2003) IEEE Trans. Power Syst. , vol.17 , Issue.2 , pp. 516-521
    • Wu, H.1    Lu, C.2
  • 7
    • 0035248045 scopus 로고    scopus 로고
    • "Neural networks for short-term load forecasting: A review and evaluation"
    • H. S. Hippert, C. E. Pedreira, and R. C. Souza, "Neural networks for short-term load forecasting: A review and evaluation," IEEE Trans. Power Syst., vol. 16, no. 1, pp. 44-55, 2001.
    • (2001) IEEE Trans. Power Syst. , vol.16 , Issue.1 , pp. 44-55
    • Hippert, H.S.1    Pedreira, C.E.2    Souza, R.C.3
  • 8
    • 0026257538 scopus 로고
    • "A priory vector based technique for load forecasting"
    • S. Rahman and G. Shrestha, "A priory vector based technique for load forecasting," IEEE Trans. Power Syst., vol. 6, no. 4, pp. 1459-1464, 1993.
    • (1993) IEEE Trans. Power Syst. , vol.6 , Issue.4 , pp. 1459-1464
    • Rahman, S.1    Shrestha, G.2
  • 9
    • 0024001840 scopus 로고
    • "An expert system based algorithm for short term load forecast"
    • S. Rahman and R. Bhatnagar, "An expert system based algorithm for short term load forecast," IEEE Trans. Power Syst., vol. 3, no. 2, pp. 392-399, 1988.
    • (1988) IEEE Trans. Power Syst. , vol.3 , Issue.2 , pp. 392-399
    • Rahman, S.1    Bhatnagar, R.2
  • 10
    • 0027543854 scopus 로고
    • "Neural network based short term load forecasting"
    • C. N. Lu and S. Vemuri, "Neural network based short term load forecasting," IEEE Trans. Power Syst., vol. 8, no. 1, pp. 336-342, 1993.
    • (1993) IEEE Trans. Power Syst. , vol.8 , Issue.1 , pp. 336-342
    • Lu, C.N.1    Vemuri, S.2
  • 11
    • 0030235269 scopus 로고    scopus 로고
    • "Nonlinear autoregressive integrated neural network model for short-term load forecasting"
    • T. W. S. Chow and C. T. Leung, "Nonlinear autoregressive integrated neural network model for short-term load forecasting," Proc. Inst. Elect. Eng. Gener. Transm. Distrib., vol. 143, no. 5, pp. 500-506, 1996.
    • (1996) Proc. Inst. Elect. Eng. Gener. Transm. Distrib. , vol.143 , Issue.5 , pp. 500-506
    • Chow, T.W.S.1    Leung, C.T.2
  • 12
    • 0032592947 scopus 로고    scopus 로고
    • "Parallel neural network-fuzzy expert system strategy for short-term load forecasting: System implementation and performance evaluation"
    • D. Srinivasan, S. S. Tan, C. S. Chang, and E. K. Chan, "Parallel neural network-fuzzy expert system strategy for short-term load forecasting: System implementation and performance evaluation," IEEE Trans. Power Syst., vol. 14, no. 3, pp. 1100-1105, 1999.
    • (1999) IEEE Trans. Power Syst. , vol.14 , Issue.3 , pp. 1100-1105
    • Srinivasan, D.1    Tan, S.S.2    Chang, C.S.3    Chan, E.K.4
  • 14
    • 0033320001 scopus 로고    scopus 로고
    • "Accumulative effect of discomfort index for fuzzy short-term load forecasting"
    • H. Mori, Y. Sone, D. Moridera, and T. Kondo, "Accumulative effect of discomfort index for fuzzy short-term load forecasting," Int. J. Eng. Intell. Syst., vol. 7, no. 4, pp. 233-238, 1999.
    • (1999) Int. J. Eng. Intell. Syst. , vol.7 , Issue.4 , pp. 233-238
    • Mori, H.1    Sone, Y.2    Moridera, D.3    Kondo, T.4
  • 15
    • 0033080240 scopus 로고    scopus 로고
    • "Fuzzy modeling for short term load forecasting using the orthogonal least squares method"
    • P. A. Mastorocostas, J. B. Theocharis, and A. G. Bakirtzis, "Fuzzy modeling for short term load forecasting using the orthogonal least squares method," IEEE Trans. Power Syst., vol. 14, no. 1, pp. 29-36, 1999.
    • (1999) IEEE Trans. Power Syst. , vol.14 , Issue.1 , pp. 29-36
    • Mastorocostas, P.A.1    Theocharis, J.B.2    Bakirtzis, A.G.3
  • 16
    • 0031996523 scopus 로고    scopus 로고
    • "A new short-term load forecasting approach using self-organizing fuzzy ARMAX models"
    • H. Yang and C. Huang, "A new short-term load forecasting approach using self-organizing fuzzy ARMAX models," IEEE Trans. Power Syst., vol. 13, no. 1, pp. 217-225, 1998.
    • (1998) IEEE Trans. Power Syst. , vol.13 , Issue.1 , pp. 217-225
    • Yang, H.1    Huang, C.2
  • 17
    • 0031198425 scopus 로고    scopus 로고
    • "Application of fuzzy logic technology for spatial load forecasting"
    • M. Chow and H Tram, "Application of fuzzy logic technology for spatial load forecasting," IEEE Trans. Power Syst., vol. 12, no. 3, pp. 1360-1366, 1997.
    • (1997) IEEE Trans. Power Syst. , vol.12 , Issue.3 , pp. 1360-1366
    • Chow, M.1    Tram, H.2
  • 18
    • 0030087190 scopus 로고    scopus 로고
    • "Heterogeneous artificial neural network for short term electrical load forecasting"
    • A. Piras, A. Germond, B. Buchenel, K. Imhof, and Y. Jaccard, "Heterogeneous artificial neural network for short term electrical load forecasting," IEEE Trans. Power Syst., vol. 11, no. 1, pp. 397-402, 1996.
    • (1996) IEEE Trans. Power Syst. , vol.11 , Issue.1 , pp. 397-402
    • Piras, A.1    Germond, A.2    Buchenel, B.3    Imhof, K.4    Jaccard, Y.5
  • 19
    • 0030084673 scopus 로고    scopus 로고
    • "Optimal fuzzy inference for short-term load forecasting"
    • H. Mori and H. kobayashi, "Optimal fuzzy inference for short-term load forecasting," IEEE Trans. Power Syst., vol. 11, no. 1, pp. 390-396, 1996.
    • (1996) IEEE Trans. Power Syst. , vol.11 , Issue.1 , pp. 390-396
    • Mori, H.1    Kobayashi, H.2
  • 20
    • 0032206570 scopus 로고    scopus 로고
    • "Neural network with fuzzy set-based classification for short-term load forecasting"
    • M. Daneshdoost, M. Lotfalian, G. Bumroonggit, and J. P. Ngoy, "Neural network with fuzzy set-based classification for short-term load forecasting," IEEE Trans. Power Syst., vol. 13, no. 4, pp. 1386-1391, 1998.
    • (1998) IEEE Trans. Power Syst. , vol.13 , Issue.4 , pp. 1386-1391
    • Daneshdoost, M.1    Lotfalian, M.2    Bumroonggit, G.3    Ngoy, J.P.4
  • 21
    • 0032074824 scopus 로고    scopus 로고
    • "A novel approach to short-term load forecasting using fuzzy neural networks"
    • S. E. Papadakis, J. B. Theocharis, S. J. Kiartzis, and A. G. Bakirtzis, "A novel approach to short-term load forecasting using fuzzy neural networks," IEEE Trans. Power Syst., vol. 13, no. 2, pp. 480-489, 1998.
    • (1998) IEEE Trans. Power Syst. , vol.13 , Issue.2 , pp. 480-489
    • Papadakis, S.E.1    Theocharis, J.B.2    Kiartzis, S.J.3    Bakirtzis, A.G.4
  • 22
    • 0029410319 scopus 로고
    • "Demand forecasting using fuzzy neural computation, with special emphasis on weekend and public holiday forecasting"
    • D. Srinivasan, C. S. Chang, and A. C. Liew, "Demand forecasting using fuzzy neural computation, with special emphasis on weekend and public holiday forecasting," IEEE Trans. Power Syst., vol. 10, no. 2, pp. 1897-1903, 1995.
    • (1995) IEEE Trans. Power Syst. , vol.10 , Issue.2 , pp. 1897-1903
    • Srinivasan, D.1    Chang, C.S.2    Liew, A.C.3
  • 23
    • 0030289955 scopus 로고    scopus 로고
    • "A neural network based technique for short-term forecasting of anomalous load periods"
    • R. Lamedica, A. Prudenzi, M. Sforna, M. Caciotta, and V. O. Cencellli, "A neural network based technique for short-term forecasting of anomalous load periods," IEEE Trans. Power Syst., vol. 11, no. 4, pp. 1749-1750, 1996.
    • (1996) IEEE Trans. Power Syst. , vol.11 , Issue.4 , pp. 1749-1750
    • Lamedica, R.1    Prudenzi, A.2    Sforna, M.3    Caciotta, M.4    Cencellli, V.O.5
  • 24
    • 0031274057 scopus 로고    scopus 로고
    • "Cascaded artificial neural networks for short-term load forecasting"
    • A. S. AlFuhaid, M. A. El-Sayed, and M. S. Mahmoud, "Cascaded artificial neural networks for short-term load forecasting," IEEE Trans. Power Syst., vol. 12, no. 4, pp. 1524-1529, 1997.
    • (1997) IEEE Trans. Power Syst. , vol.12 , Issue.4 , pp. 1524-1529
    • Alfuhaid, A.S.1    El-Sayed, M.A.2    Mahmoud, M.S.3
  • 25
    • 0036474210 scopus 로고    scopus 로고
    • "One-hour-ahead load forecasting using neural network"
    • T. Senjyu, H. Takara, K. Uezato, and T. Funabashi, "One-hour-ahead load forecasting using neural network," IEEE Trans. Power Syst., vol. 17, no. 1, pp. 113-118, 2002.
    • (2002) IEEE Trans. Power Syst. , vol.17 , Issue.1 , pp. 113-118
    • Senjyu, T.1    Takara, H.2    Uezato, K.3    Funabashi, T.4
  • 26
    • 0036466581 scopus 로고    scopus 로고
    • "Short-term load forecasting by a neuro-fuzzy based approach"
    • R. Liang and C. Cheng, "Short-term load forecasting by a neuro-fuzzy based approach," Int. J. Elect. Power Energy Syst., vol. 24, no. 2, pp. 103-111, 2002.
    • (2002) Int. J. Elect. Power Energy Syst. , vol.24 , Issue.2 , pp. 103-111
    • Liang, R.1    Cheng, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.