-
1
-
-
13844319039
-
"Standard Market Design and Structure Notice of Proposed Rule-making"
-
United States of America Federal Energy Regulatory Commission, 18 CFR Part 35, Docket Number RM01-12-000
-
United States of America Federal Energy Regulatory Commission, "Standard Market Design and Structure Notice of Proposed Rule-making," 18 CFR Part 35, Docket Number RM01-12-000, Sep. 2002.
-
(2002)
-
-
-
2
-
-
8644221329
-
"Application of auction results to power system expansion"
-
London, U.K., Apr
-
S. Dekrajangpetch and G. B. Sheble, "Application of auction results to power system expansion," in Int. Conf. Electric Utility Deregulation and Restructuring and Power Technologies 2000, London, U.K., Apr. 2000, pp. 142-146.
-
(2000)
Int. Conf. Electric Utility Deregulation and Restructuring and Power Technologies 2000
, pp. 142-146
-
-
Dekrajangpetch, S.1
Sheble, G.B.2
-
3
-
-
13844321531
-
"Entrepreneurial Interconnectors: Safe Harbour Provisions"
-
Nov.National Electricity Code Administrator (Australia) Report of working group on inter-regional hedges and entrepreneurial interconnectors. [Online] Available www.neca.com.au
-
(1998, Nov.) National Electricity Code Administrator (Australia)"Entrepreneurial Interconnectors: Safe Harbour Provisions," Report of working group on inter-regional hedges and entrepreneurial interconnectors. [Online] Available www.neca.com.au
-
(1998)
-
-
-
4
-
-
0842330970
-
Merchant Transmission Investment
-
Dept. Economics, Mass. Inst. Technol., Cambridge, Feb
-
P. Joskow and J. Tirole, Merchant Transmission Investment, Dept. Economics, Mass. Inst. Technol., Cambridge, Feb. 2003.
-
(2003)
-
-
Joskow, P.1
Tirole, J.2
-
5
-
-
10244231526
-
Transmission Regulation, Merchant Investment, and the Experience of SNI and Murraylink in the Australian National Electricity Market
-
Harvard Electricity Policy Group, Harvard Univ., Cambridge, MA, June
-
S. Littlechild, Transmission Regulation, Merchant Investment, and the Experience of SNI and Murraylink in the Australian National Electricity Market, Harvard Electricity Policy Group, Harvard Univ., Cambridge, MA, June 2003.
-
(2003)
-
-
Littlechild, S.1
-
6
-
-
0003929364
-
"The Joint Energy and Transmission Rights Auction: A General Framework for RTO Market Designs"
-
FERC Discussion Paper
-
R. P. O'Neill, B. F. Hobbs, Jr., W. R. Stewart, and M. H. Rothkopf, "The Joint Energy and Transmission Rights Auction: A General Framework for RTO Market Designs," FERC Discussion Paper, 2001.
-
(2001)
-
-
O'Neill, R.P.1
Hobbs Jr., B.F.2
Stewart, W.R.3
Rothkopf, M.H.4
-
7
-
-
0036872112
-
"A joint energy and transmission rights auction: Proposal and properties"
-
R. P. O'Neill, U. Helman, B. F. Hobbs, Jr., W. R. Stewart, and M. H. Rothkopf, "A joint energy and transmission rights auction: Proposal and properties," IEEE Trans. Power Syst., vol. 17, no. 4, pp. 1058-1067, Nov. 2002.
-
(2002)
IEEE Trans. Power Syst.
, vol.17
, Issue.4
, pp. 1058-1067
-
-
O'Neill, R.P.1
Helman, U.2
Hobbs Jr., B.F.3
Stewart, W.R.4
Rothkopf, M.H.5
-
8
-
-
0345258420
-
"Contingent transmission rights in the standard market design"
-
R. O'Neill, U. Helman, R. Baldick, W. Stewart, and M. Rothkopf, "Contingent transmission rights in the standard market design," IEEE Trans. Power Syst., vol. 18, no. 4, pp. 1331-1337, Nov. 2003.
-
(2003)
IEEE Trans. Power Syst.
, vol.18
, Issue.4
, pp. 1331-1337
-
-
O'Neill, R.1
Helman, U.2
Baldick, R.3
Stewart, W.4
Rothkopf, M.5
-
9
-
-
13844321530
-
"Pricing the Emergency Capacity in a Transmission Line"
-
Mar
-
H. Salas and R. Baldick, "Pricing the Emergency Capacity in a Transmission Line", Mar. 2004.
-
(2004)
-
-
Salas, H.1
Baldick, R.2
-
10
-
-
0031141352
-
"Contract paths, phase-shifters, and efficient electricity trade"
-
R. Baldick and E. Kahn, "Contract paths, phase-shifters, and efficient electricity trade," IEEE Trans. Power Syst., vol. 12, no. 2, pp. 749-755, May 1997.
-
(1997)
IEEE Trans. Power Syst.
, vol.12
, Issue.2
, pp. 749-755
-
-
Baldick, R.1
Kahn, E.2
-
11
-
-
0003671031
-
"Transmission Capacity Reservations and Transmission Congestions Contracts"
-
Manuscript, John F. Kennedy School of Government, Harvard Univ., Cambridge, MA, Mar
-
S. Harvey, W. Hogan, and S. Pope, "Transmission Capacity Reservations and Transmission Congestions Contracts", Manuscript, John F. Kennedy School of Govemment, Harvard Univ., Cambridge, MA, Mar. 1997.
-
(1997)
-
-
Harvey, S.1
Hogan, W.2
Pope, S.3
-
12
-
-
21344465796
-
"A market mechanism for electric power transmission"
-
H.-P. Chao and S. Peck, "A market mechanism for electric power transmission," J. Regulatory Econ., vol. 10, no. 1, pp. 25-59, July 1996.
-
(1996)
J. Regulatory Econ.
, vol.10
, Issue.1
, pp. 25-59
-
-
Chao, H.-P.1
Peck, S.2
-
13
-
-
0034288029
-
"Flow-based transmission rights and congestion management"
-
H.-P. Chao, S. Peck, S. Oren, and R. Wilson, "Flow-based transmission rights and congestion management," Electricity J., vol. 13, no. 8, pp. 38-58, 2000.
-
(2000)
Electricity J.
, vol.13
, Issue.8
, pp. 38-58
-
-
Chao, H.-P.1
Peck, S.2
Oren, S.3
Wilson, R.4
-
14
-
-
0141491804
-
"Regional Transmission Organizations: Millenium Order on Designing Market Institutions for Electric Network Systems"
-
Tech. Rep., Center for Business and Government, John F. Kennedy School of Government, Harvard Univ., Cambridge, MA, May
-
W. W. Hogan, "Regional Transmission Organizations: Millenium Order on Designing Market Institutions for Electric Network Systems," Tech. Rep., Center for Business and Government, John F. Kennedy School of Government, Harvard Univ., Cambridge, MA, May 2000.
-
(2000)
-
-
Hogan, W.W.1
-
15
-
-
0012303897
-
"Financial Transmission Right Formulations"
-
John F. Kennedy School of Government, Harvard Univ., Cambridge, MA, Mar
-
W. Hogan, "Financial Transmission Right Formulations", John F. Kennedy School of Government, Harvard Univ., Cambridge, MA, Mar. 2002.
-
(2002)
-
-
Hogan, W.1
-
16
-
-
0003078138
-
"Flowgates, contingency-constrained dispatch, and transmission rights"
-
Jan./Feb
-
L. E. Ruff, "Flowgates, contingency-constrained dispatch, and transmission rights," Electricity J., vol. 14, no. l, pp. 34-55, Jan./Feb. 2001.
-
(2001)
Electricity J.
, vol.14
, Issue.1
, pp. 34-55
-
-
Ruff, L.E.1
-
17
-
-
13844316248
-
"Efficient market-clearing prices in markets with nonconvexities"
-
[Online] Available ksgwww.harvard.edu/hepg., to be published
-
R. P. O'Neill, P. M. Sotkiewicz, B. F. Hobbs, M. H. Rothkopf, and W. R. Stewart, Jr., "Efficient market-clearing prices in markets with nonconvexities," Eur. J. Oper. Res., [Online] Available ksgwww.harvard.edu/hepg., Dec. 2002, to be published.
-
(2002)
Eur. J. Oper. Res.
-
-
O'Neill, R.P.1
Sotkiewicz, P.M.2
Hobbs, B.F.3
Rothkopf, M.H.4
Stewart Jr., W.R.5
-
18
-
-
0003556954
-
-
Norwell, MA: Kluwer, International Series in Operations Research & Management Science
-
B. F. Hobbs, M. H. Rothkopf, R. P. O'Neill, and H. P. Chao, Eds., The Next Generation of Unit Commitment Models. Norwell, MA: Kluwer, International Series in Operations Research & Management Science, 2001.
-
(2001)
The Next Generation of Unit Commitment Models
-
-
Hobbs, B.F.1
Rothkopf, M.H.2
O'Neill, R.P.3
Chao, H.P.4
-
19
-
-
0037553737
-
"Market-Based Transmission Investments and Competitive Electricity Markets"
-
Tech. Rep
-
W. W. Hogan, "Market-Based Transmission Investments and Competitive Electricity Markets,", Tech. Rep. 1999.
-
(1999)
-
-
Hogan, W.W.1
|