메뉴 건너뛰기




Volumn 42, Issue 20, 2004, Pages 4401-4419

Comparison of push and pull control strategies for supply network management in a make-to-stock environment

Author keywords

[No Author keywords available]

Indexed keywords

COST BENEFIT ANALYSIS; CUSTOMER SATISFACTION; FORECASTING; INDUSTRIAL ECONOMICS; INVENTORY CONTROL; PROCESS CONTROL; STRATEGIC PLANNING; THROUGHPUT; TRANSPORTATION;

EID: 13644284219     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540410001716543     Document Type: Article
Times cited : (15)

References (27)
  • 3
    • 0029389855 scopus 로고
    • Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty
    • KADIPASAOGLU, S. N. and SRIDHARAN, V., 1995, Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty. Journal of Operations Management, 13, 193-211.
    • (1995) Journal of Operations Management , vol.13 , pp. 193-211
    • Kadipasaoglu, S.N.1    Sridharan, V.2
  • 4
    • 0037053058 scopus 로고    scopus 로고
    • A comparative study of the performance of push and pull systems in the presence of emergency orders
    • KIM, K., CHHAJED, D. and PALEKAR, U. S., 2002, A comparative study of the performance of push and pull systems in the presence of emergency orders. International Journal of Production Research, 40, 1627-1646.
    • (2002) International Journal of Production Research , vol.40 , pp. 1627-1646
    • Kim, K.1    Chhajed, D.2    Palekar, U.S.3
  • 8
    • 0002823699 scopus 로고
    • Managing supply chain inventory: Pitfalls and opportunities
    • LEE, H. L. and BILLINGTON, C., 1992, Managing supply chain inventory: pitfalls and opportunities. Sloan Management Review, 33, 65-73.
    • (1992) Sloan Management Review , vol.33 , pp. 65-73
    • Lee, H.L.1    Billington, C.2
  • 9
    • 0027658539 scopus 로고
    • Material management in decentralized supply chain
    • LEE, H. L. and BILLINGTON, C., 1993, Material management in decentralized supply chain. Operations Research, 41, 835-847.
    • (1993) Operations Research , vol.41 , pp. 835-847
    • Lee, H.L.1    Billington, C.2
  • 11
    • 0032108281 scopus 로고    scopus 로고
    • Reengineering the order fulfilment process in supply chain networks
    • LIN, F. R. and SHAW, M. J., 1998, Reengineering the order fulfilment process in supply chain networks. Journal of Flexible Manufacturing Systems, 10, 197-230.
    • (1998) Journal of Flexible Manufacturing Systems , vol.10 , pp. 197-230
    • Lin, F.R.1    Shaw, M.J.2
  • 12
    • 0001443464 scopus 로고    scopus 로고
    • Special research focus on supply chain linkages: Challenges for design and management in the 21st century
    • MABERT, V. A. and VENKATARAMANAN, M. A., 1998, Special research focus on supply chain linkages: challenges for design and management in the 21st century. Decision Sciences, 29, 537-552.
    • (1998) Decision Sciences , vol.29 , pp. 537-552
    • Mabert, V.A.1    Venkataramanan, M.A.2
  • 13
    • 0034659586 scopus 로고    scopus 로고
    • Product flexibility in selecting manufacturing planning and control strategy
    • PERSENTILI, E. and ALPTEKIN, S. E., 2000, Product flexibility in selecting manufacturing planning and control strategy. International Journal of Production Research, 38, 2011-2021.
    • (2000) International Journal of Production Research , vol.38 , pp. 2011-2021
    • Persentili, E.1    Alptekin, S.E.2
  • 14
    • 0024715082 scopus 로고
    • A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operation
    • REES, L. P., HUANG, P. Y. and TAYLOR, B. W., 1989, A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operation. International Journal of Production Research, 27, 1427-1443.
    • (1989) International Journal of Production Research , vol.27 , pp. 1427-1443
    • Rees, L.P.1    Huang, P.Y.2    Taylor, B.W.3
  • 15
    • 0027568692 scopus 로고
    • The relative significance of forecast errors in multistage manufacturing
    • RITZMAN, L. P. and KING, B. E., 1993, The relative significance of forecast errors in multistage manufacturing. Journal of Operations Management, 11, 51-65.
    • (1993) Journal of Operations Management , vol.11 , pp. 51-65
    • Ritzman, L.P.1    King, B.E.2
  • 16
    • 0034316827 scopus 로고    scopus 로고
    • Fine planning for supply chain in semiconductor manufacture
    • RUPP, T. M. and RISTIC, M., 2000, Fine planning for supply chain in semiconductor manufacture. Journal of Materials Processing Technology, 107, 390-397.
    • (2000) Journal of Materials Processing Technology , vol.107 , pp. 390-397
    • Rupp, T.M.1    Ristic, M.2
  • 17
    • 0035323831 scopus 로고    scopus 로고
    • MASCOT: An agent-based architecture for dynamic supply chain creation and coordination in the internet economy
    • SADEH, N. M., HILDUM, D. W., KJENSTAD, D. and TSENG, A., 2001, MASCOT: an agent-based architecture for dynamic supply chain creation and coordination in the internet economy. Production Planning and Control, 12, 212-223.
    • (2001) Production Planning and Control , vol.12 , pp. 212-223
    • Sadeh, N.M.1    Hildum, D.W.2    Kjenstad, D.3    Tseng, A.4
  • 18
    • 0024865074 scopus 로고
    • Simulating a just-in-time production system
    • SARKER, B. R., 1989, Simulating a just-in-time production system. Computers and Industrial Engineering, 16, 127-137.
    • (1989) Computers and Industrial Engineering , vol.16 , pp. 127-137
    • Sarker, B.R.1
  • 19
    • 0024748621 scopus 로고
    • The performance of push and pull systems: A simulation and comparative study
    • SARKER, B. R. and FITZSIMMONS, J. A., 1989, The performance of push and pull systems: a simulation and comparative study. International Journal of Production Research, 27, 1715-1731.
    • (1989) International Journal of Production Research , vol.27 , pp. 1715-1731
    • Sarker, B.R.1    Fitzsimmons, J.A.2
  • 21
    • 3342913329 scopus 로고
    • Technical Report 88-24 (Evanston: Department of Industrial Engineering and Management Sciences, Northwestern University)
    • SPEARMAN, M. L. and ZAZANIS, M. A., 1988, Push and Pull Production Systems: Issues and Comparisons. Technical Report 88-24 (Evanston: Department of Industrial Engineering and Management Sciences, Northwestern University).
    • (1988) Push and Pull Production Systems: Issues and Comparisons
    • Spearman, M.L.1    Zazanis, M.A.2
  • 22
    • 0026859945 scopus 로고
    • Push and pull production systems: Issues and comparisons
    • SPEARMAN, M. L. and ZAZANIS, M. A., 1992, Push and pull production systems: issues and comparisons. Operations Research, 40, 521-532.
    • (1992) Operations Research , vol.40 , pp. 521-532
    • Spearman, M.L.1    Zazanis, M.A.2
  • 23
    • 0000470092 scopus 로고
    • The impact of safety stock on schedule instability, cost, and service
    • SRIDHARAN, V. and LAFORGE, R. L., 1989, The impact of safety stock on schedule instability, cost, and service. Journal of Operations Management, 8, 327-347.
    • (1989) Journal of Operations Management , vol.8 , pp. 327-347
    • Sridharan, V.1    Laforge, R.L.2
  • 24
    • 0442309376 scopus 로고    scopus 로고
    • A simulation study of work-in-process inventory drive systems and their effect on operational measurements
    • TAYLOR, L. J., 2000, A simulation study of work-in-process inventory drive systems and their effect on operational measurements. British Journal of Management, 11, 47-59.
    • (2000) British Journal of Management , vol.11 , pp. 47-59
    • Taylor, L.J.1
  • 25
    • 0030108746 scopus 로고    scopus 로고
    • A Petri net approach to investigating push and pull paradigms in flexible factory automated systems
    • VENKATESH, K., ZHOU, M. C., KAIGHOBADI, M. and CAUDILL, R., 1996, A Petri net approach to investigating push and pull paradigms in flexible factory automated systems. International Journal of Production Research, 34, 595-620.
    • (1996) International Journal of Production Research , vol.34 , pp. 595-620
    • Venkatesh, K.1    Zhou, M.C.2    Kaighobadi, M.3    Caudill, R.4
  • 27
    • 0027612429 scopus 로고
    • Freezing the master production schedule for material requirements planning systems under demand uncertainty
    • ZHAO, X. and LEE, T. S., 1993, Freezing the master production schedule for material requirements planning systems under demand uncertainty. Journal of Operations Management, 11, 185-205.
    • (1993) Journal of Operations Management , vol.11 , pp. 185-205
    • Zhao, X.1    Lee, T.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.