메뉴 건너뛰기




Volumn , Issue , 2004, Pages 209-218

Generating robust schedules through temporal flexibility

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; BENCHMARKING; COMPUTATION THEORY; CONSTRAINT THEORY; DECISION MAKING; ITERATIVE METHODS;

EID: 13444282645     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (76)

References (16)
  • 2
    • 34250094949 scopus 로고
    • Scheduling project networks with resource constraints and time windows
    • Bartusch, M.; Mohring, R. H.; and Radermacher, F. J. 1988. Scheduling project networks with resource constraints and time windows. Annals of Operations Research 16:201-240.
    • (1988) Annals of Operations Research , vol.16 , pp. 201-240
    • Bartusch, M.1    Mohring, R.H.2    Radermacher, F.J.3
  • 4
    • 0036182335 scopus 로고    scopus 로고
    • A constraint-based method for project scheduling with time windows
    • Cesta, A.; Oddi, A.; and Smith, S. F. 2002. A Constraint-based method for Project Scheduling with Time Windows. Journal of Heuristics 8(1):109-136.
    • (2002) Journal of Heuristics , vol.8 , Issue.1 , pp. 109-136
    • Cesta, A.1    Oddi, A.2    Smith, S.F.3
  • 8
    • 85046526242 scopus 로고    scopus 로고
    • Probe backtrack search for minimal perturbation in dynamic scheduling
    • El Sakkout, H., and Wallace, M. Probe Backtrack Search for Minimal Perturbation in Dynamic Scheduling. Constraints.
    • Constraints
    • El Sakkout, H.1    Wallace, M.2
  • 16
    • 0002753338 scopus 로고
    • OPIS: A methodology and architecture for reactive scheduling
    • Fox, M., and Zweben, M., eds., Morgan Kaufmann
    • Smith, S. F. 1994. OPIS: A Methodology and Architecture for Reactive Scheduling. In Fox, M., and Zweben, M., eds., Intelligent Scheduling. Morgan Kaufmann. 29-66.
    • (1994) Intelligent Scheduling , pp. 29-66
    • Smith, S.F.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.