메뉴 건너뛰기




Volumn 24, Issue 2-7, 2000, Pages 1633-1640

Intermediate storage tank operation strategies in the production scheduling of multi-product batch processes

Author keywords

Batch process; Intermediate storage tank; Makespan; Scheduling

Indexed keywords

CONSTRAINT THEORY; INTEGER PROGRAMMING; LINEAR PROGRAMMING; MATHEMATICAL MODELS; NUMERICAL METHODS; PROCESS ENGINEERING; PRODUCTIVITY; SCHEDULING; TANKS (CONTAINERS);

EID: 0034661328     PISSN: 00981354     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0098-1354(00)00438-5     Document Type: Conference Paper
Times cited : (22)

References (10)
  • 1
    • 38149146232 scopus 로고
    • Completion times and optimal scheduling for serial multi-product processes with transfer and set-up times in zero-wait policy
    • Jung, J. H., Lee, H. K., & Lee, I. B. (1994). Completion times and optimal scheduling for serial multi-product processes with transfer and set-up times in zero-wait policy. Computers & Chemical Engineering, 18, 537-544.
    • (1994) Computers & Chemical Engineering , vol.18 , pp. 537-544
    • Jung, J.H.1    Lee, H.K.2    Lee, I.B.3
  • 2
    • 0030291270 scopus 로고    scopus 로고
    • Optimal scheduling of multiproduct batch processes for various intermediate storage policies
    • Kim, M. S., Jung, J. H., & Lee, I. B. (1996). Optimal scheduling of multiproduct batch processes for various intermediate storage policies. Industrial Engineering & Chemical Research, 35, 4058-4066.
    • (1996) Industrial Engineering & Chemical Research , vol.35 , pp. 4058-4066
    • Kim, M.S.1    Jung, J.H.2    Lee, I.B.3
  • 3
    • 0024090948 scopus 로고
    • Scheduling in serial multiproduct batch processes with finite intermediate storage: A mixed integer linear programming formulation
    • Ku, H. M., & Karimi, I. (1988). Scheduling in serial multiproduct batch processes with finite intermediate storage: a mixed integer linear programming formulation. Industrial Engineering & Chemical Research, 27, 1840-1848.
    • (1988) Industrial Engineering & Chemical Research , vol.27 , pp. 1840-1848
    • Ku, H.M.1    Karimi, I.2
  • 4
    • 0024984801 scopus 로고
    • Completion time algorithms for serial multiproduct batch processes with shard storage
    • Ku, H. M., & Karimi, I. (1990). Completion time algorithms for serial multiproduct batch processes with shard storage. Computers & Chemical Engineering, 14, 49-69.
    • (1990) Computers & Chemical Engineering , vol.14 , pp. 49-69
    • Ku, H.M.1    Karimi, I.2
  • 6
    • 0024922597 scopus 로고
    • Intermediate storage and availability of process under equipment failure
    • Lee, E. S., & Reklaitis, G. V. (1989). Intermediate storage and availability of process under equipment failure. Computers & Chemical Engineering, 13, 1235-1243.
    • (1989) Computers & Chemical Engineering , vol.13 , pp. 1235-1243
    • Lee, E.S.1    Reklaitis, G.V.2
  • 7
    • 51249161252 scopus 로고
    • Dynamic operating policies for periodic processes subject to equipment failuers
    • Lee, E. S. (1995). Dynamic operating policies for periodic processes subject to equipment failuers. Korean Journal of Chemical Engineering, 12, 358-365.
    • (1995) Korean Journal of Chemical Engineering , vol.12 , pp. 358-365
    • Lee, E.S.1
  • 8
    • 38249026095 scopus 로고
    • Completion time in serial mixed storage multiproduct processes with transfer and set up times
    • Rajagopalan, D., & Karimi, I. A. (1989). Completion time in serial mixed storage multiproduct processes with transfer and set up times. Computers & Chemical Engineering, 13, 175-186.
    • (1989) Computers & Chemical Engineering , vol.13 , pp. 175-186
    • Rajagopalan, D.1    Karimi, I.A.2
  • 10
    • 0023470130 scopus 로고
    • Determination of completion times for serial multiproduct processes-3: Mixed intermediate storage systems
    • Wiede, W. J. R., Kuriyan, K., & Reklaitis, G. V. (1987). Determination of completion times for serial multiproduct processes-3: mixed intermediate storage systems. Computers & Chemical Engineering, 11, 357-368.
    • (1987) Computers & Chemical Engineering , vol.11 , pp. 357-368
    • Wiede, W.J.R.1    Kuriyan, K.2    Reklaitis, G.V.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.