메뉴 건너뛰기




Volumn 131, Issue 1, 2005, Pages 108-116

Performance evaluation for cost estimators by reliability interval method

Author keywords

Construction industry; Consultants; Consulting services; Cost control; Performance evaluation

Indexed keywords

COSTS; DECISION MAKING; EDUCATION; FUZZY CONTROL; PROBABILITY DISTRIBUTIONS; PROFESSIONAL ASPECTS; QUALITY ASSURANCE; RELIABILITY; SOCIETIES AND INSTITUTIONS; STATISTICAL METHODS;

EID: 12344325877     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2005)131:1(108)     Document Type: Article
Times cited : (11)

References (54)
  • 2
    • 0342520637 scopus 로고    scopus 로고
    • Local stability intervals in the analytic hierarchy process
    • Aguaron, L., and Moreno-Jimenez, J. M. (2000). "Local stability intervals in the analytic hierarchy process." Eur. J. Oper. Res., 125(1), 113-132.
    • (2000) Eur. J. Oper. Res. , vol.125 , Issue.1 , pp. 113-132
    • Aguaron, L.1    Moreno-Jimenez, J.M.2
  • 3
    • 0024901948 scopus 로고
    • Approximate articulation of preference and priority derivation
    • Arbel, A. (1987). "Approximate articulation of preference and priority derivation." Eur. J. Oper. Res., 43(3), 317-326.
    • (1987) Eur. J. Oper. Res. , vol.43 , Issue.3 , pp. 317-326
    • Arbel, A.1
  • 4
    • 0032595622 scopus 로고    scopus 로고
    • Project management: Cost, time and quality, two best guesses and a phenomenon, it's time to accept other success criteria
    • Atkinson, R. (1999). "Project management: Cost, time and quality, two best guesses and a phenomenon, it's time to accept other success criteria." Int. J. Proj. Manage., 17(6), 337-342.
    • (1999) Int. J. Proj. Manage. , vol.17 , Issue.6 , pp. 337-342
    • Atkinson, R.1
  • 5
    • 0002946051 scopus 로고
    • Measuring architectural design service quality
    • Baker, J. A., and Lamb, C. W. (1993). "Measuring architectural design service quality." J. Prof. Services Marketing, 24, 253-268.
    • (1993) J. Prof. Services Marketing , vol.24 , pp. 253-268
    • Baker, J.A.1    Lamb, C.W.2
  • 6
    • 12344332161 scopus 로고
    • A synthesis of client's criteria for the assessment of professional firms
    • M. P. Nicholson, ed., Univ. of Nottingham, Nottingham, U.K.
    • Banks, J., and Barrett, P. (1992). "A synthesis of client's criteria for the assessment of professional firms." Proc., Architectural Management International Symp., M. P. Nicholson, ed., Univ. of Nottingham, Nottingham, U.K.
    • (1992) Proc., Architectural Management International Symp.
    • Banks, J.1    Barrett, P.2
  • 7
    • 0030173778 scopus 로고    scopus 로고
    • A new framework for determining critical success/failure factors in projects
    • Belassi, W., and Tukel, O. I. (1996). "A new framework for determining critical success/failure factors in projects." Int. J. Proj. Manage., 14(3), 141-151.
    • (1996) Int. J. Proj. Manage. , vol.14 , Issue.3 , pp. 141-151
    • Belassi, W.1    Tukel, O.I.2
  • 8
    • 0022328021 scopus 로고
    • A comparison of the analytic hierarchy process as a simple multiattribute value function
    • Belton, V. (1986). "A comparison of the analytic hierarchy process as a simple multiattribute value function." Eur. J. Oper. Res., 26(1), 7-21.
    • (1986) Eur. J. Oper. Res. , vol.26 , Issue.1 , pp. 7-21
    • Belton, V.1
  • 9
    • 49049129048 scopus 로고
    • On a short-coming of Saaty's method of analytic hierarchies
    • Belton, V., and Gear, T. (1983). "On a short-coming of Saaty's method of analytic hierarchies," Omega, 11(3), 228-230.
    • (1983) Omega , vol.11 , Issue.3 , pp. 228-230
    • Belton, V.1    Gear, T.2
  • 10
    • 0001799255 scopus 로고
    • Quality measurement in professional services firms
    • Bojanic, D. C. (1991). "Quality measurement in professional services firms," J. Prof. Services Marketing, 7(2), 27-36.
    • (1991) J. Prof. Services Marketing , vol.7 , Issue.2 , pp. 27-36
    • Bojanic, D.C.1
  • 11
    • 46549093655 scopus 로고
    • Fuzzy hierarchical analysis
    • Buckley, J. J. (1985). "Fuzzy hierarchical analysis," Fuzzy Sets Syst., 17, 233-247.
    • (1985) Fuzzy Sets Syst. , vol.17 , pp. 233-247
    • Buckley, J.J.1
  • 12
    • 0242434228 scopus 로고    scopus 로고
    • Framework of success criteria for design/build projects
    • Chan, A. P. C., Scott, D., and Lam, E. W. M. (2002). "Framework of Success Criteria for Design/Build Projects," J. Manage. Eng., 18(3), 120-128.
    • (2002) J. Manage. Eng. , vol.18 , Issue.3 , pp. 120-128
    • Chan, A.P.C.1    Scott, D.2    Lam, E.W.M.3
  • 13
    • 0030837856 scopus 로고    scopus 로고
    • Evaluating naval tactical missile systems by fuzzy AHP based on the grade value of membership function
    • Cheng, C. H. (1996). "Evaluating naval tactical missile systems by fuzzy AHP based on the grade value of membership function," Eur. J. Oper. Res., 96(2), 343-350.
    • (1996) Eur. J. Oper. Res. , vol.96 , Issue.2 , pp. 343-350
    • Cheng, C.H.1
  • 16
    • 0017495672 scopus 로고    scopus 로고
    • How to use multiattribute utility measurement for social decision making
    • Edwards, W. (1997). "How to use multiattribute utility measurement for social decision making," IEEE Trans. Syst. Man Cybern. 7, 326-340.
    • (1997) IEEE Trans. Syst. Man Cybern. , vol.7 , pp. 326-340
    • Edwards, W.1
  • 17
    • 35548949549 scopus 로고
    • SMARTS and SMARTER: Improved simple methods for multiattribute utility measurement
    • Edwards, W., and Barron, F. H. (1994). "SMARTS and SMARTER: Improved simple methods for multiattribute utility measurement," Org. Behav. Human Decision Processes, 60, 306-325.
    • (1994) Org. Behav. Human Decision Processes , vol.60 , pp. 306-325
    • Edwards, W.1    Barron, F.H.2
  • 18
    • 10644249171 scopus 로고
    • A comparative study of differences in subjective likelihood estimates made by individuals, interacting groups, Delphi groups and nominal groups
    • Gustafson, D. H., Shukla, R. M., Delbecq, A. L., and Walster, G. W. (1973). "A comparative study of differences in subjective likelihood estimates made by individuals, interacting groups, Delphi groups and nominal groups," Org. Behav. Human Perf., 9, 280-291.
    • (1973) Org. Behav. Human Perf. , vol.9 , pp. 280-291
    • Gustafson, D.H.1    Shukla, R.M.2    Delbecq, A.L.3    Walster, G.W.4
  • 19
    • 0032188744 scopus 로고    scopus 로고
    • A statistical approach to the analytic hierarchy bprocess with interval judgments (I) Distributions on feasible regions
    • Haines, L. M. (1998). "A statistical approach to the analytic hierarchy bprocess with interval judgments (I) Distributions on feasible regions." Eur. J. Oper. Res., 110(1), 112-125.
    • (1998) Eur. J. Oper. Res. , vol.110 , Issue.1 , pp. 112-125
    • Haines, L.M.1
  • 20
    • 0000942012 scopus 로고    scopus 로고
    • Evaluating contractor prequalification data: Selection criteria and project success factors
    • Hatush, Z., and Skitmore, M. (1997). "Evaluating contractor prequalification data: selection criteria and project success factors." Constr. Manage. Econom., 15(1), 129-147.
    • (1997) Constr. Manage. Econom. , vol.15 , Issue.1 , pp. 129-147
    • Hatush, Z.1    Skitmore, M.2
  • 21
    • 0032098746 scopus 로고    scopus 로고
    • Which contractor selection methodology?
    • Holt, G. D. (1998). "Which contractor selection methodology?" Int. J. Proj. Manage., 16(3), 153-164.
    • (1998) Int. J. Proj. Manage. , vol.16 , Issue.3 , pp. 153-164
    • Holt, G.D.1
  • 22
    • 0038618183 scopus 로고
    • Factors influencing UK construction clients' choice of contractor
    • Holt, G. D., Olomolaiye, P. O., and Frank, C. H. (1994). "Factors influ- encing UK construction clients' choice of contractor." Build. Environ., 29(2), 241-248.
    • (1994) Build. Environ. , vol.29 , Issue.2 , pp. 241-248
    • Holt, G.D.1    Olomolaiye, P.O.2    Frank, C.H.3
  • 24
    • 0042151188 scopus 로고
    • Assessment of building surveying service quality: Process or outcome?
    • Royal Institution of Chartered Surveyors, London
    • Hoxley, M. (1994). "Assessment of building surveying service quality: Process or outcome?" RICS Research Rep., Royal Institution of Chartered Surveyors, London.
    • (1994) RICS Research Rep.
    • Hoxley, M.1
  • 25
    • 0004116469 scopus 로고    scopus 로고
    • Value for money? The impact of competitive fee tendering on construction professional service quality
    • Royal Institution of Chartered Surveyors, London
    • Hoxley, M. (1998). "Value for money? The impact of competitive fee tendering on construction professional service quality." RICS Research Rep., Royal Institution of Chartered Surveyors, London.
    • (1998) RICS Research Rep.
    • Hoxley, M.1
  • 27
    • 0032048056 scopus 로고    scopus 로고
    • Factors influencing the success of management consulting projects
    • Jang, Y., and Lee, J. (1998). "Factors influencing the success of management consulting projects." Int. J. Proj. Manage., 16(2), 67-72.
    • (1998) Int. J. Proj. Manage. , vol.16 , Issue.2 , pp. 67-72
    • Jang, Y.1    Lee, J.2
  • 29
    • 0036467908 scopus 로고    scopus 로고
    • A decision support system for selecting convenience store location through integration of fuzzy AHP and artificial neural network
    • Kuo, R. J., Chi, S. C., and Kao, S. S. (2002). "A decision support system for selecting convenience store location through integration of fuzzy AHP and artificial neural network." Comput Ind., 47(2), 199-214.
    • (2002) Comput Ind. , vol.47 , Issue.2 , pp. 199-214
    • Kuo, R.J.1    Chi, S.C.2    Kao, S.S.3
  • 30
    • 0020843523 scopus 로고
    • A fuzzy extension of Saaty's priority theory
    • Laarhoven, P. J. M., and Pedrycz, W. (1983). "A fuzzy extension of Saaty's priority theory." Fuzzy Sets Syst., 11, 229-241.
    • (1983) Fuzzy Sets Syst. , vol.11 , pp. 229-241
    • Laarhoven, P.J.M.1    Pedrycz, W.2
  • 31
    • 0036812939 scopus 로고    scopus 로고
    • Multicriteria evaluation model for selection of architectural consultants
    • Leung, J. F. K., Cheung, F. K. T., and Skitmore, M. (2002). "Multicriteria evaluation model for selection of architectural consultants." Constr. Manage. Econom., 20(7), 569-580.
    • (2002) Constr. Manage. Econom. , vol.20 , Issue.7 , pp. 569-580
    • Leung, J.F.K.1    Cheung, F.K.T.2    Skitmore, M.3
  • 32
    • 0033116630 scopus 로고    scopus 로고
    • Interval estimation of priorities in the AHP
    • Lipovetsssky, S., and Tishler, A. (1999). "Interval estimation of priorities in the AHP." Eur. J. Oper. Res., 114(1), 153-164.
    • (1999) Eur. J. Oper. Res. , vol.114 , Issue.1 , pp. 153-164
    • Lipovetsssky, S.1    Tishler, A.2
  • 33
    • 0032833306 scopus 로고    scopus 로고
    • A fire safety assessment system for existing buildings
    • Lo, S. M. (1999). "A fire safety assessment system for existing buildings." Fire Technol., 35(2), 131-152.
    • (1999) Fire Technol. , vol.35 , Issue.2 , pp. 131-152
    • Lo, S.M.1
  • 34
    • 12344258467 scopus 로고    scopus 로고
    • Incorporating reliability and variance into the weighting function of fire risk assessment for high rise buildings
    • Chinese
    • Lo, S. M., and Lu, J. A. (2001). "Incorporating reliability and variance into the weighting function of fire risk assessment for high rise buildings." China Safety Sci. J., 11(5), 11-13 (Chinese).
    • (2001) China Safety Sci. J. , vol.11 , Issue.5 , pp. 11-13
    • Lo, S.M.1    Lu, J.A.2
  • 38
    • 0037603787 scopus 로고    scopus 로고
    • A model for subcontractor selection in refurbishment projects
    • Orkoroh, M. I., and Torrance, V. B. (1999). "A model for subcontractor selection in refurbishment projects." Constr. Manage. Econom., 17(3), 315-327.
    • (1999) Constr. Manage. Econom. , vol.17 , Issue.3 , pp. 315-327
    • Orkoroh, M.I.1    Torrance, V.B.2
  • 39
    • 0037290393 scopus 로고    scopus 로고
    • Characterization of aggregate fuzzy membership functions using Saaty's eigenvalue approach
    • Pendharkar, P. C. (2003). "Characterization of aggregate fuzzy membership functions using Saaty's eigenvalue approach." Comput. Oper. Res., 30(2), 199-212.
    • (2003) Comput. Oper. Res. , vol.30 , Issue.2 , pp. 199-212
    • Pendharkar, P.C.1
  • 40
    • 0036466972 scopus 로고    scopus 로고
    • Performance measurement of R&D projects in a multi-project, concurrent engineering environment
    • Pillai, A. S., Joshi, A., and Rao, K. S. (2002). "Performance measurement of R&D projects in a multi-project, concurrent engineering environment." Int. J. Proj. Manage., 20(2), 165-177.
    • (2002) Int. J. Proj. Manage. , vol.20 , Issue.2 , pp. 165-177
    • Pillai, A.S.1    Joshi, A.2    Rao, K.S.3
  • 41
    • 0342538614 scopus 로고    scopus 로고
    • On the convergence of multiattribute weighting methods
    • Poyhonen, M., and Hamalainen, R. P. (2001). "On the convergence of multiattribute weighting methods." Eur. J. Oper. Res., 129(3), 569-585.
    • (2001) Eur. J. Oper. Res. , vol.129 , Issue.3 , pp. 569-585
    • Poyhonen, M.1    Hamalainen, R.P.2
  • 42
    • 12344338039 scopus 로고    scopus 로고
    • PQC: Prequalification criteria for consultant selection
    • Australia
    • Queensland Government (1997). "PQC: Prequalification criteria for consultant selection." Rep. Prepared for the Department of Public Works and Housing, Australia.
    • (1997) Rep. Prepared for the Department of Public Works and Housing
  • 43
    • 0025200163 scopus 로고
    • Model for owner prequalification of contractors
    • Russell, J. S. (1990). "Model for owner prequalification of contractors." J. Manage. Eng., 6(1), 59-75.
    • (1990) J. Manage. Eng. , vol.6 , Issue.1 , pp. 59-75
    • Russell, J.S.1
  • 44
    • 0038279070 scopus 로고
    • Contractor prequalification data for construction owners
    • Russell, J. S., Hancher, D. E., and Skibniewski, M. J. (1992). "Contractor prequalification data for construction owners." Constr. Manage. Econom., 10(2), 1170-1135.
    • (1992) Constr. Manage. Econom. , vol.10 , Issue.2 , pp. 1170-11135
    • Russell, J.S.1    Hancher, D.E.2    Skibniewski, M.J.3
  • 45
    • 0001582664 scopus 로고
    • Decision criteria in contractor prequalification
    • Russell, J S., and Skibniewski, M. J. (1988). "Decision criteria in contractor prequalification." J. Constr. Eng. Manage., 4(2), 148-164.
    • (1988) J. Constr. Eng. Manage. , vol.4 , Issue.2 , pp. 148-164
    • Russell, J.S.1    Skibniewski, M.J.2
  • 47
    • 0028765110 scopus 로고
    • Highlights and critical points in the theory and application of the analytic hierarchy process
    • Saaty, T. L. (1994). "Highlights and critical points in the theory and application of the analytic hierarchy process." Eur. J. Oper. Res., 74(3), 426-447.
    • (1994) Eur. J. Oper. Res. , vol.74 , Issue.3 , pp. 426-447
    • Saaty, T.L.1
  • 49
    • 0023432320 scopus 로고
    • Uncertainty and rank order in the analytic hierarchy process
    • Saaty, T. L., and Vargas, L. G. (1987). "Uncertainty and rank order in the analytic hierarchy process." Eur. J. Oper. Res., 32(1), 107-117.
    • (1987) Eur. J. Oper. Res. , vol.32 , Issue.1 , pp. 107-117
    • Saaty, T.L.1    Vargas, L.G.2
  • 50
    • 0020089312 scopus 로고
    • An experimental comparison of different approaches to determining weights in additive utility models
    • Schoemaker, P. J., and Waid, C. C. (1982). "An experimental comparison of different approaches to determining weights in additive utility models." Manage. Sci., 28(2), 182-196.
    • (1982) Manage. Sci. , vol.28 , Issue.2 , pp. 182-196
    • Schoemaker, P.J.1    Waid, C.C.2
  • 52
    • 0002782595 scopus 로고    scopus 로고
    • Fire risk assessment using multiattribute evaluation
    • Y. Hasemi, ed., The International Association for Fire Safety, the World Congress Centre, Melbourne, Australia
    • Watts, J. M. (1997). "Fire risk assessment using multiattribute evaluation," Fire Safety Science: Proc., 5th Int. Symp., Y. Hasemi, ed., The International Association for Fire Safety, the World Congress Centre, Melbourne, Australia, 679-690.
    • (1997) Fire Safety Science: Proc., 5th Int. Symp. , pp. 679-690
    • Watts, J.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.