메뉴 건너뛰기




Volumn 164, Issue 3 SPEC. ISS., 2005, Pages 609-626

A triple objective function with a Chebychev dynamic pick-and-place point specification approach to optimise the surface mount placement machine

Author keywords

Optimisation; Printed circuit board assembly; Scheduling; SMD placement machine

Indexed keywords

AUTOMATION; CHEBYSHEV APPROXIMATION; COSTS; OPERATIONS RESEARCH; OPTIMIZATION; PICKUPS; PRINTED CIRCUIT BOARDS; ROBOTIC ASSEMBLY; SCHEDULING; SPECIFICATIONS;

EID: 12244262284     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2003.09.034     Document Type: Conference Paper
Times cited : (24)

References (21)
  • 4
    • 0034449713 scopus 로고    scopus 로고
    • Optimization of revolver head SMT machines using adaptive simulated annealing (ASA)
    • Twenty-Sixth IEEE/CPMT International
    • T.M. Tirpak, P.C. Nelson, A.J. Aswani, Optimization of revolver head SMT machines using adaptive simulated annealing (ASA), Electronics Manufacturing Technology Symposium, 2000. Twenty-Sixth IEEE/CPMT International, 2000, pp. 214 -220
    • (2000) Electronics Manufacturing Technology Symposium, 2000 , pp. 214-220
    • Tirpak, T.M.1    Nelson, P.C.2    Aswani, A.J.3
  • 5
    • 0033640797 scopus 로고    scopus 로고
    • A comparison of search techniques for minimizing assembly time in the printed wiring assembly
    • Fu H.-P., Su C.-T. A comparison of search techniques for minimizing assembly time in the printed wiring assembly. International Journal of Production Economics. 63:2000;83-98
    • (2000) International Journal of Production Economics , vol.63 , pp. 83-98
    • Fu, H.-P.1    Su, C.-T.2
  • 7
    • 84897607942 scopus 로고    scopus 로고
    • A new dynamic point specification approach to optimise surface mount placement machine in printed circuit board assembly
    • Bangkok, 11-14 December
    • M. Ayob, G. Kendall, A new dynamic point specification approach to optimise surface mount placement machine in printed circuit board assembly, Proc.of the IEEE ICIT'02, Bangkok, 11-14 December 2002, pp. 486-491
    • (2002) Proc. of the IEEE ICIT'02 , pp. 486-491
    • Ayob, M.1    Kendall, G.2
  • 8
    • 0030104205 scopus 로고    scopus 로고
    • Robotic assembly of printed circuit boards with component feeder location consideration
    • Egbelu P.J., Wu C., Pilgaonkar R. Robotic assembly of printed circuit boards with component feeder location consideration. Production Planning and Control. 7:1996;162-175
    • (1996) Production Planning and Control , vol.7 , pp. 162-175
    • Egbelu, P.J.1    Wu, C.2    Pilgaonkar, R.3
  • 13
    • 0027874715 scopus 로고
    • Planning of component placement/insertion sequence and feeder setup in PCB assembly using genetic algorithm
    • Leu M.C., Wong H., Ji Z. Planning of component placement/insertion sequence and feeder setup in PCB assembly using genetic algorithm. Journal of Electronic Packaging, Transactions ASME. 115:1993;424-432
    • (1993) Journal of Electronic Packaging, Transactions ASME , vol.115 , pp. 424-432
    • Leu, M.C.1    Wong, H.2    Ji, Z.3
  • 14
    • 0035782065 scopus 로고    scopus 로고
    • Multiple criteria approach for solving feeder assignment and assembly sequence problem in PCB assembly
    • Hop N.V., Tabucanon M.T. Multiple criteria approach for solving feeder assignment and assembly sequence problem in PCB assembly. Production Planning and Control. 12(8):2001;736-744
    • (2001) Production Planning and Control , vol.12 , Issue.8 , pp. 736-744
    • Hop, N.V.1    Tabucanon, M.T.2
  • 15
    • 0032043028 scopus 로고    scopus 로고
    • Heuristics for assembly sequencing and relative magazine assignment for robotic assembly
    • Wang C., Ho L.-S., Cannon D.J. Heuristics for assembly sequencing and relative magazine assignment for robotic assembly. Computers and Industrial Engineering. 34:1998;423-431
    • (1998) Computers and Industrial Engineering , vol.34 , pp. 423-431
    • Wang, C.1    Ho, L.-S.2    Cannon, D.J.3
  • 16
    • 84949774999 scopus 로고    scopus 로고
    • Optimisation for surface mount placement machines
    • Bangkok, 11-14 December
    • M. Ayob, P. Cowling, G. Kendall, Optimisation for surface mount placement machines, Proc. of the IEEE ICIT'02, Bangkok, 11-14 December 2002, pp. 498-503
    • (2002) Proc. of the IEEE ICIT'02 , pp. 498-503
    • Ayob, M.1    Cowling, P.2    Kendall, G.3
  • 17
    • 0023983796 scopus 로고
    • Component allocation and partitioning for a dual delivery placement machine
    • Ahmadi J., Grotzinger S., Johnson D. Component allocation and partitioning for a dual delivery placement machine. Operations Research. 36:1988;176-191
    • (1988) Operations Research , vol.36 , pp. 176-191
    • Ahmadi, J.1    Grotzinger, S.2    Johnson, D.3
  • 18
    • 12244270545 scopus 로고    scopus 로고
    • SMD placement
    • November 28, 2000 (September 25)
    • B. Bentzen, SMD placement, SMT in FOCUS, November 28, 2000 (September 25, 2002) (Downloadable from website http://www.smtinfocus.com/PDF/SMD_placement.pdf)
    • (2002) SMT in FOCUS
    • Bentzen, B.1
  • 20
    • 0035918744 scopus 로고    scopus 로고
    • Extended dynamic point specification approach to sequencing robot moves for PCB assembly
    • Hop N.V., Tabucanon M.T. Extended dynamic point specification approach to sequencing robot moves for PCB assembly. International Journal of Production Research. 39(8):2001;1671-1687
    • (2001) International Journal of Production Research , vol.39 , Issue.8 , pp. 1671-1687
    • Hop, N.V.1    Tabucanon, M.T.2
  • 21
    • 0032303440 scopus 로고    scopus 로고
    • A simulated annealing heuristic for robotics assembly using the dynamic pick-and-place model
    • Su C., Fu H. A simulated annealing heuristic for robotics assembly using the dynamic pick-and-place model. Production Planning and Control. 9:1998;795-802
    • (1998) Production Planning and Control , vol.9 , pp. 795-802
    • Su, C.1    Fu, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.