-
1
-
-
0033640797
-
A comparison of search techniques for minimizing assembly time in printed wiring assembly
-
Fu, H.-P. and Sit, C.-T., A comparison of search techniques for minimizing assembly time in printed wiring assembly, Int. J. of Production Economics, 63, 2000, pp. 83-98, .
-
(2000)
Int. J. of Production Economics
, vol.63
, pp. 83-98
-
-
Fu, P.H.1
Sit-T, C.2
-
2
-
-
0033316498
-
Optimization of high-speed multistation SMT placement machines using evolutionary algorithms
-
April
-
Wang, W., Nelson, P.C. and Tirpak, T.M., Optimization of high-speed multistation SMT placement machines using evolutionary algorithms, IEEE Transactions on Electronics Packaging Manufacturing, Vol. 22(2), April 1999, pp. 137-146.
-
(1999)
IEEE Transactions on Electronics Packaging Manufacturing
, vol.22
, Issue.2
, pp. 137-146
-
-
Wang, W.1
Nelson, P.C.2
Tirpak, T.M.3
-
3
-
-
0029407137
-
Integer programming approach to printed circuit board assembly time optimization, IEEE transactions on components
-
Nov
-
Kumar, R. and Li, H Integer programming approach to printed circuit board assembly time optimization, IEEE Transactions on Components, Packaging and Manufacturing Technology, Nov 1995. Vol 18(4), pp. 720-727.
-
(1995)
Packaging and Manufacturing Technology
, vol.18
, Issue.4
, pp. 720-727
-
-
Kumar, R.1
Li, H.2
-
4
-
-
0000311185
-
A dynamic point specification approach to sequencing robot moves for PCB assembly
-
Su, Y.-G, Wang, C., Egbelu, P.J, and Cannon, D.J., A dynamic point specification approach to sequencing robot moves for PCB assembly, Int. J. Computer integrated Manufacturing, 8(6), 1995, pp. 448-456.
-
(1995)
Int. J. Computer Integrated Manufacturing
, vol.8
, Issue.6
, pp. 448-456
-
-
Su, Y.-G.1
Wang, C.2
Egbelu, P.J.3
Cannon, D.J.4
-
5
-
-
0032043028
-
Heuristics for assembly sequencing and relative magazine assignment for robotie assembly
-
Wang, C., Ho, L.-S. and Cannon, DJ., Heuristics for assembly sequencing and relative magazine assignment for robotie assembly, Computers and Industrial Engineering 34, 1998, pp. 423-431.
-
(1998)
Computers and Industrial Engineering
, vol.34
, pp. 423-431
-
-
Wang, C.1
Ho, L.-S.2
Cannon, D.J.3
-
6
-
-
0031096289
-
A magazine assignment heuristic for robotic assembly using the dinamic pick and place approach
-
Wang, C., Ho, US., Fu, H.P and Su, Y.C., A Magazine Assignment Heuristic for Robotic Assembly Using the Dinamic Pick and Place Approach, Int. J. of Industrial Engineering, 4(1), 1997, pp. 24-33.
-
(1997)
Int. J. of Industrial Engineering
, vol.4
, Issue.1
, pp. 24-33
-
-
Wang, C.1
Ho, U.S.2
Fu, H.P.3
Su, Y.C.4
-
7
-
-
0035782065
-
Multiple criteria approach for solving feeder assignment and assembly sequence problem in PCB assembly
-
Dec
-
Hop, N.V and Tabucanon, M. T Multiple criteria approach for solving feeder assignment and assembly sequence problem in PCB assembly, in the Production Planning and Control vol. 12 no, 8, Dec 2001, pp. 736-744 .
-
(2001)
The Production Planning and Control
, vol.12
, Issue.8
, pp. 736-744
-
-
Hop, N.V.A.1
Tabucanon, M.T.2
-
8
-
-
0035918744
-
Extended dynamic point specification approach to sequencing robot moves for PCB assembly
-
May
-
Hop, N.V and Tabucanon, M. T., Extended dynamic point specification approach to sequencing robot moves for PCB assembly, in the International Journal of Production Research Vol. 39(8), May 2001, pp. 1671-1687.
-
(2001)
The International Journal of Production Research
, vol.39
, Issue.8
, pp. 1671-1687
-
-
Hop, N.V.1
Tabucanon, M.T.2
-
9
-
-
0032657683
-
Routing heuristics for automated pick and place machines
-
Ahmadi, R.H. and Mamer, J.W., Routing heuristics for automated pick and place machines, European Journal of Operational Research 117, 1999, pp.533-552.
-
(1999)
European Journal of Operational Research
, vol.117
, pp. 533-552
-
-
Ahmadi, R.H.1
Mamer, J.W.2
-
10
-
-
0032303440
-
A simulated annealing heuristic for robotics assembly using the dynamic pick-and-place model
-
Su, C. and H. Fu, A simulated annealing heuristic for robotics assembly using the dynamic pick-and-place model, in the Production Planning and Control 9, 1998, pp. 795-802, .
-
(1998)
The Production Planning and Control
, vol.9
, pp. 795-802
-
-
Su, C.1
Fu, H.2
|