메뉴 건너뛰기




Volumn , Issue , 2003, Pages 207-212

Early Estimation of the Size of VHDL Projects

Author keywords

Cost estimation; Design metrics; Embedded systems; System level design; VHDL analysis

Indexed keywords

COST ESTIMATION; DESIGN METRICS; SYSTEM-LEVEL DESIGN; VHDL ANALYSIS;

EID: 1142287743     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1145/944696.944699     Document Type: Conference Paper
Times cited : (3)

References (10)
  • 3
    • 1142271350 scopus 로고    scopus 로고
    • Measuring IC and ASIC design productivity
    • Numetrics, May
    • Numetrics, Measuring IC and ASIC design productivity, white paper, www.numetrics.com, May 2002.
    • (2002) White Paper
  • 6
    • 1142295530 scopus 로고
    • Institute for Parallel and Distributed Systems, Stuttgart, Germany
    • P. S. Elliot and M. Gumm, MVP v1.1, Institute for Parallel and Distributed Systems, Stuttgart, Germany, 1994.
    • (1994) MVP V1.1
    • Elliot, P.S.1    Gumm, M.2
  • 7
    • 0034837596 scopus 로고    scopus 로고
    • Development cost and size estimation starting from high-level specifications
    • ACM Press
    • William Fornaciari et al., Development cost and size estimation starting from high-level specifications. In Proc. 9th Intl. Symposium on Hw/sw Codesign, pages 86-91, ACM Press, 2001.
    • (2001) Proc. 9th Intl. Symposium on Hw/sw Codesign , pp. 86-91
    • Fornaciari, W.1
  • 10
    • 1142295531 scopus 로고    scopus 로고
    • Development effort and size estimation for partially specified VHDL projects
    • D. P. Scarpazza, Development effort and size estimation for partially specified VHDL projects. CEFRIEL Internal report, 2002.
    • (2002) CEFRIEL Internal Report
    • Scarpazza, D.P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.