-
2
-
-
0029736011
-
Scheduling jobs with different, job-dependent carliness and tardiness penalties using the SLK method
-
Adamopoulos, G. I., & Pappis, C. P. (1996). Scheduling jobs with different, job-dependent carliness and tardiness penalties using the SLK method. European Journal of Operational Research, 88(2), 336-344.
-
(1996)
European Journal of Operational Research
, vol.88
, Issue.2
, pp. 336-344
-
-
Adamopoulos, G.I.1
Pappis, C.P.2
-
3
-
-
0025489275
-
Minimizing the weighted sum of late and early completion penalties in a single machine
-
Ahmed, M. U., & Sundararaghavan, P. S. (1990). Minimizing the weighted sum of late and early completion penalties in a single machine. IIE Transaction, 22(3), 288-290.
-
(1990)
IIE Transaction
, vol.22
, Issue.3
, pp. 288-290
-
-
Ahmed, M.U.1
Sundararaghavan, P.S.2
-
4
-
-
0033102073
-
Tabu search for total tardiness minimization in flowshop scheduling problems
-
Armentano, V. A., & Ronconi, D. P. (1999). Tabu search for total tardiness minimization in flowshop scheduling problems. Computers and Operations Research, 26(3), 219-235.
-
(1999)
Computers and Operations Research
, vol.26
, Issue.3
, pp. 219-235
-
-
Armentano, V.A.1
Ronconi, D.P.2
-
5
-
-
0001096735
-
Genetic algorithms and random keys for sequencing and optimization
-
Bean, J. (1994). Genetic algorithms and random keys for sequencing and optimization. ORSA Journal on Computing, 6(2), 154-160.
-
(1994)
ORSA Journal on Computing
, vol.6
, Issue.2
, pp. 154-160
-
-
Bean, J.1
-
6
-
-
0002611698
-
A Tabu search approach for the flow shop scheduling problem
-
Ben-Daya, M., & Al-Fawzan, M. (1998). A Tabu search approach for the flow shop scheduling problem. European Journal of Operational Research, 109(1), 88-95.
-
(1998)
European Journal of Operational Research
, vol.109
, Issue.1
, pp. 88-95
-
-
Ben-Daya, M.1
Al-Fawzan, M.2
-
7
-
-
0000901610
-
Planning as heuristic search: New results
-
S. Biundo, & M. Fox (Eds.), Durham, UK
-
Bonet, B., & Geffner, H. (1999). Planning as heuristic search: New results. In S. Biundo, & M. Fox (Eds.), Proceedings of the fifth European conference on planning, Durham, UK, 359-371.
-
(1999)
Proceedings of the Fifth European Conference on Planning
, pp. 359-371
-
-
Bonet, B.1
Geffner, H.2
-
8
-
-
0000955243
-
A heuristic bicriterion approach to integrated process plan selection and job shop scheduling
-
Brandimarte, P., & Calderini, M. (1995). A heuristic bicriterion approach to integrated process plan selection and job shop scheduling. International Journal of Production Research, 22(1), 161-181.
-
(1995)
International Journal of Production Research
, vol.22
, Issue.1
, pp. 161-181
-
-
Brandimarte, P.1
Calderini, M.2
-
9
-
-
84974859431
-
A heuristic for common due-date assignment and job scheduling on parallel machines
-
Cheng, T. C. E. (1989). A heuristic for common due-date assignment and job scheduling on parallel machines. Journal of the Operational Research Society, 40(12), 1129-1135.
-
(1989)
Journal of the Operational Research Society
, vol.40
, Issue.12
, pp. 1129-1135
-
-
Cheng, T.C.E.1
-
10
-
-
0028445470
-
Parallel-machine scheduling problem with earliness and tardiness penalties
-
Cheng, T. C. E., & Chen, Z. L. (1994). Parallel-machine scheduling problem with earliness and tardiness penalties. Journal of the Operational Research Society, 45(6), 685-695.
-
(1994)
Journal of the Operational Research Society
, vol.45
, Issue.6
, pp. 685-695
-
-
Cheng, T.C.E.1
Chen, Z.L.2
-
11
-
-
0029371267
-
Minmax earliness/tardiness scheduling in identical parallel machine system using genetic algorithms
-
Cheng, R., Gen, M., & Tozawa, T. (1995). Minmax earliness/tardiness scheduling in identical parallel machine system using genetic algorithms. Computers and Industrial Engineering, 29(1-4), 513-517.
-
(1995)
Computers and Industrial Engineering
, vol.29
, Issue.1-4
, pp. 513-517
-
-
Cheng, R.1
Gen, M.2
Tozawa, T.3
-
12
-
-
0025474221
-
A state-of-the-art review of parallel-machine scheduling research
-
Cheng, T. C. E., & Sin, C. C. S. (1990). A state-of-the-art review of parallel-machine scheduling research. European Journal of Operational Research, 47(3), 271-292.
-
(1990)
European Journal of Operational Research
, vol.47
, Issue.3
, pp. 271-292
-
-
Cheng, T.C.E.1
Sin, C.C.S.2
-
13
-
-
0025792925
-
Scheduling to minimize weighted earliness and tardiness about a common due date
-
De, P., Ghosh, J. B., & Wells, C. E. (1991). Scheduling to minimize weighted earliness and tardiness about a common due date. Computers and Operations Research, 18(5), 465-475.
-
(1991)
Computers and Operations Research
, vol.18
, Issue.5
, pp. 465-475
-
-
De, P.1
Ghosh, J.B.2
Wells, C.E.3
-
14
-
-
0032184192
-
A production scheduling system for parallel machine in an electrical appliance plant
-
Gao, L., Wang, C., Wang, D., Yin, Z., & Wang, S. (1998). A production scheduling system for parallel machine in an electrical appliance plant. Computers and Industrial Engineering, 35(1-2), 105-108.
-
(1998)
Computers and Industrial Engineering
, vol.35
, Issue.1-2
, pp. 105-108
-
-
Gao, L.1
Wang, C.2
Wang, D.3
Yin, Z.4
Wang, S.5
-
17
-
-
0019585243
-
A review of production scheduling
-
Graves, S. C. (1981). A review of production scheduling. Operations Research, 29(4), 646-675.
-
(1981)
Operations Research
, vol.29
, Issue.4
, pp. 646-675
-
-
Graves, S.C.1
-
18
-
-
0026223840
-
Earliness-tardiness scheduling problems I: Weighted deviation of completion times about a common due date
-
Hall, N. G., & Posner, M. E. (1991). Earliness-tardiness scheduling problems I: Weighted deviation of completion times about a common due date. Operations Research, 39(5), 836-846.
-
(1991)
Operations Research
, vol.39
, Issue.5
, pp. 836-846
-
-
Hall, N.G.1
Posner, M.E.2
-
19
-
-
0344898438
-
Scheduling decisions in FMS using a heuristic approach
-
Haq, A. N., Karthikeyan, T., & Dinesh, M. (2003). Scheduling decisions in FMS using a heuristic approach. International Journal of Advanced Manufacturing Technology, 22(5), 374-379.
-
(2003)
International Journal of Advanced Manufacturing Technology
, vol.22
, Issue.5
, pp. 374-379
-
-
Haq, A.N.1
Karthikeyan, T.2
Dinesh, M.3
-
22
-
-
0025897854
-
Minimizing weighted number of tardy jobs and weighted earliness-tardiness penalties about a common due date
-
Lee, C. Y., Danusaputro, S. L., & Lin, C. S. (1991). Minimizing weighted number of tardy jobs and weighted earliness-tardiness penalties about a common due date. Computers and Operations Research, 18(4), 379-389.
-
(1991)
Computers and Operations Research
, vol.18
, Issue.4
, pp. 379-389
-
-
Lee, C.Y.1
Danusaputro, S.L.2
Lin, C.S.3
-
23
-
-
0036642595
-
Advanced planning and scheduling with outsourcing in manufacturing supply chain
-
Lee, Y. H., Jeong, C. S., & Moon, C. (2002). Advanced planning and scheduling with outsourcing in manufacturing supply chain. Computers and Industrial Engineering, 43(2), 351-374.
-
(2002)
Computers and Industrial Engineering
, vol.43
, Issue.2
, pp. 351-374
-
-
Lee, Y.H.1
Jeong, C.S.2
Moon, C.3
-
24
-
-
0028377693
-
The parallel min-max weighted absolute lateness scheduling problem
-
Li, C., & Cheng, T. C. E. (1993). The parallel min-max weighted absolute lateness scheduling problem. Naval Research Logistics, 41, 33-46.
-
(1993)
Naval Research Logistics
, vol.41
, pp. 33-46
-
-
Li, C.1
Cheng, T.C.E.2
-
25
-
-
0032599594
-
A modified genetic algorithm for single machine scheduling
-
Liu, J., & Tang, L. (1999). A modified genetic algorithm for single machine scheduling. Computers and Industrial Engineering, 37(1), 43-46.
-
(1999)
Computers and Industrial Engineering
, vol.37
, Issue.1
, pp. 43-46
-
-
Liu, J.1
Tang, L.2
-
26
-
-
0000481860
-
A simulated annealing approach to integrated production scheduling
-
Palmer, G. J. (1996). A simulated annealing approach to integrated production scheduling. Journal of Intelligent Manufacturing, 7, 163-176.
-
(1996)
Journal of Intelligent Manufacturing
, vol.7
, pp. 163-176
-
-
Palmer, G.J.1
-
28
-
-
0142185333
-
A multiobjective genetic algorithm for scheduling a flexible manufacturing system
-
Sankar, A. S., Ponnanbalam, S. G., & Rajendran, C. (2003). A multiobjective genetic algorithm for scheduling a flexible manufacturing system. International Journal of Advanced Manufacturing Technology, 22(3), 229-236.
-
(2003)
International Journal of Advanced Manufacturing Technology
, vol.22
, Issue.3
, pp. 229-236
-
-
Sankar, A.S.1
Ponnanbalam, S.G.2
Rajendran, C.3
-
29
-
-
0030398995
-
Dynamic non-preemptive single machine scheduling
-
Sridharan, V., & Zhou, Z. (1996). Dynamic non-preemptive single machine scheduling. Computers and Operations Research, 23(12), 1183-1190.
-
(1996)
Computers and Operations Research
, vol.23
, Issue.12
, pp. 1183-1190
-
-
Sridharan, V.1
Zhou, Z.2
-
31
-
-
0032165143
-
A genetic algorithm for scheduling job families on a single machine with arbitrary earliness/tardiness penalties and an unrestricted common due date
-
Webster, S., Jog, P. D., & Gupta, A. (1998). A genetic algorithm for scheduling job families on a single machine with arbitrary earliness/tardiness penalties and an unrestricted common due date. International Journal of Production Research, 36(9), 2543-2551.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.9
, pp. 2543-2551
-
-
Webster, S.1
Jog, P.D.2
Gupta, A.3
-
32
-
-
0041732027
-
Various hybrid methods based on genetic algorithms with fuzzy logic controller
-
Yun, Y., Gen, M., & Seo, S. (2003). Various hybrid methods based on genetic algorithms with fuzzy logic controller. Journal of Intelligent Manufacturing, 14(4), 401-419.
-
(2003)
Journal of Intelligent Manufacturing
, vol.14
, Issue.4
, pp. 401-419
-
-
Yun, Y.1
Gen, M.2
Seo, S.3
|