메뉴 건너뛰기




Volumn 35, Issue 1-2, 1998, Pages 105-108

A production scheduling system for parallel machines in an electrical appliance plant

Author keywords

Batch job scheduling; Heuristics; Optimization; Parallel machine; Production scheduling

Indexed keywords

HEURISTIC METHODS; INJECTION MOLDING; MANUFACTURING DATA PROCESSING; OPTIMIZATION; SCHEDULING; USER INTERFACES;

EID: 0032184192     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0360-8352(98)00031-x     Document Type: Article
Times cited : (7)

References (5)
  • 1
    • 0030168503 scopus 로고
    • Solving the generalized machine assignment problem in group technology
    • Cheng, C.H., Goh, C. and Lee, A. (1995). Solving the generalized machine assignment problem in group technology, Journal of the research society, 47, 794-802.
    • (1995) Journal of the Research Society , vol.47 , pp. 794-802
    • Cheng, C.H.1    Goh, C.2    Lee, A.3
  • 2
    • 0028445470 scopus 로고
    • Parallel-machine scheduling problem with earliness and tardiness penalties
    • Cheng, T.C.E., Chen, Z.L. (1994). Parallel-machine scheduling problem with earliness and tardiness penalties, Journal of the Operational Research Society, 45, 685-695.
    • (1994) Journal of the Operational Research Society , vol.45 , pp. 685-695
    • Cheng, T.C.E.1    Chen, Z.L.2
  • 5
    • 0025699778 scopus 로고
    • Scheduling batch on parallel machines with major and minor set-ups
    • Tang, C.S. (1990). Scheduling batch on parallel machines with major and minor set-ups, European Journal of Operational Research, 46, 28-37.
    • (1990) European Journal of Operational Research , vol.46 , pp. 28-37
    • Tang, C.S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.