메뉴 건너뛰기




Volumn 39, Issue 3, 2005, Pages 309-332

A decision support system for operations in a container terminal

Author keywords

Approaches for handling uncertainty in decision making; Congestion; Container terminals; Crane deployment; Decision support systems; Models and algorithms; Port time (turnaround time) of vessels; Quay crane rate; Reshuffling; Routing; Storage space allocation

Indexed keywords

ALGORITHMS; CONTAINERS; CRANES; DECISION MAKING; MATHEMATICAL MODELS; TRANSFER CASES (VEHICLES);

EID: 10644255568     PISSN: 01679236     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.dss.2003.11.002     Document Type: Article
Times cited : (250)

References (28)
  • 4
    • 0036474954 scopus 로고    scopus 로고
    • Interblock crane deployment in container terminals
    • R.K. Cheung, C.-L. Li, W. Lin, Interblock crane deployment in container terminals, Transportation Science 36 (1) (2002) 79-83.
    • (2002) Transportation Science , vol.36 , Issue.1 , pp. 79-83
    • Cheung, R.K.1    Li, C.-L.2    Lin, W.3
  • 6
    • 0031096047 scopus 로고    scopus 로고
    • Efficient planning of berth allocation for container terminals in Asia
    • A. Imai, K. Nagaiwa, C.W. Tat, Efficient planning of berth allocation for container terminals in Asia, Journal of Advanced Transportation 31 (1) (1997) 75-94.
    • (1997) Journal of Advanced Transportation , vol.31 , Issue.1 , pp. 75-94
    • Imai, A.1    Nagaiwa, K.2    Tat, C.W.3
  • 8
    • 0032305735 scopus 로고    scopus 로고
    • Re-marshaling export containers in port container terminals
    • K.H. Kim, J.W. Bae, Re-marshaling export containers in port container terminals, Computers & Industrial Engineering 35 (3-4) (1998) 655-658.
    • (1998) Computers & Industrial Engineering , vol.35 , Issue.3-4 , pp. 655-658
    • Kim, K.H.1    Bae, J.W.2
  • 9
    • 0032306050 scopus 로고    scopus 로고
    • The optimal determination of the space requirement and the number of transfer cranes for import containers
    • K.H. Kim, H.B. Kim, The optimal determination of the space requirement and the number of transfer cranes for import containers, Computers & Industrial Engineering 35 (3-4) (1998) 427-430.
    • (1998) Computers & Industrial Engineering , vol.35 , Issue.3-4 , pp. 427-430
    • Kim, K.H.1    Kim, H.B.2
  • 10
    • 84885901838 scopus 로고    scopus 로고
    • Genetic algorithms to schedule container transfers at multimodal terminals
    • E. Kozan, P. Preston, Genetic algorithms to schedule container transfers at multimodal terminals, International Transactions in Operational Research 6 (1999) 311-329.
    • (1999) International Transactions in Operational Research , vol.6 , pp. 311-329
    • Kozan, E.1    Preston, P.2
  • 15
    • 10644291261 scopus 로고    scopus 로고
    • Storage yard planning in container shipping terminals
    • Dept. of IEEM, Hong Kong University of Science and Technology
    • K.G. Murty, Storage Yard Planning in Container Shipping Terminals, Technical Report, Dept. of IEEM, Hong Kong University of Science and Technology, 1997.
    • (1997) Technical Report
    • Murty, K.G.1
  • 16
    • 0032632191 scopus 로고    scopus 로고
    • The US Army National Guard's mobile simulators location and routing problem
    • K.G. Murty, P.A. Djang, The US Army National Guard's mobile simulators location and routing problem, Operations Research 47 (1999) 175-182.
    • (1999) Operations Research , vol.47 , pp. 175-182
    • Murty, K.G.1    Djang, P.A.2
  • 17
    • 10644267179 scopus 로고    scopus 로고
    • A newsboy type model for scheduling stevedoring tractors at container terminals in Hong Kong
    • Dept. of IEEM, Hong Kong University of Science and Technology
    • K.G. Murty, M.C.L. Tsang, Y.-W. Wan, A Newsboy Type Model for Scheduling Stevedoring Tractors At Container Terminals in Hong Kong, Technical Report, Dept. of IEEM, Hong Kong University of Science and Technology, 1996.
    • (1996) Technical Report
    • Murty, K.G.1    Tsang, M.C.L.2    Wan, Y.-W.3
  • 20
    • 0025436513 scopus 로고
    • A branch and bound solution method for the crane scheduling problem
    • R.I. Peterkofsky, C.F. Daganzo, A branch and bound solution method for the crane scheduling problem, Transportation Research-B 24 (3) (1990) 159-172.
    • (1990) Transportation Research-B , vol.24 , Issue.3 , pp. 159-172
    • Peterkofsky, R.I.1    Daganzo, C.F.2
  • 25
    • 0035370242 scopus 로고    scopus 로고
    • Container stowage preplanning: Using search to generate solution, a case study
    • I.D. Wilson, P.A. Roach, J.A. Ware, Container stowage preplanning: using search to generate solution, a case study, Knowledge-Based Systems 14 (2001) 137-145.
    • (2001) Knowledge-based Systems , vol.14 , pp. 137-145
    • Wilson, I.D.1    Roach, P.A.2    Ware, J.A.3
  • 26
    • 0008907877 scopus 로고    scopus 로고
    • PhD thesis, Dept. of IEEM, Hong Kong University of Science and Technology
    • C. Zhang, Resource Planning in Container Storage Yard, PhD thesis, Dept. of IEEM, Hong Kong University of Science and Technology, 2000.
    • (2000) Resource Planning in Container Storage Yard
    • Zhang, C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.