메뉴 건너뛰기




Volumn 54, Issue 12, 2003, Pages 1249-1253

Incorporating the potential for human error in maintenance models

Author keywords

Delay time modelling; Downtime; Inspection; Maintenance

Indexed keywords

DECISION MAKING; ERROR CORRECTION; INSPECTION; MAINTENANCE; MATHEMATICAL MODELS; MEASUREMENT ERRORS; PLANT MANAGEMENT; POISSON DISTRIBUTION; PROBABILITY DENSITY FUNCTION; PUBLIC POLICY;

EID: 0346907172     PISSN: 01605682     EISSN: None     Source Type: Journal    
DOI: 10.1057/palgrave.jors.2601634     Document Type: Review
Times cited : (21)

References (9)
  • 1
    • 0033366210 scopus 로고    scopus 로고
    • Developments in delay time modelling
    • Christer AH (1999). Developments in delay time modelling. J Opl Res Soc 50: 1120-1137.
    • (1999) J Opl Res Soc , vol.50 , pp. 1120-1137
    • Christer, A.H.1
  • 2
    • 0031162682 scopus 로고    scopus 로고
    • Subjective estimation of the delay-time distribution in maintenance modelling
    • Wang W (1997). Subjective estimation of the delay-time distribution in maintenance modelling. Eur J Opns Res 99: 515529.
    • (1997) Eur J Opns Res , vol.99 , pp. 515529
    • Wang, W.1
  • 3
    • 0023326879 scopus 로고
    • Delay-time models of reliability of equipment subject to inspection monitoring
    • Christer AH (1987). Delay-time models of reliability of equipment subject to inspection monitoring. J Opl Res Soc 38(4): 329334.
    • (1987) J Opl Res Soc , vol.38 , Issue.4 , pp. 329334
    • Christer, A.H.1
  • 4
    • 0021422101 scopus 로고
    • Delay-time models of industrial inspection maintenance problems
    • Christer AH and Waller M (1984). Delay-time models of industrial inspection maintenance problems. J Opl Res Soc 35(5): 401-406.
    • (1984) J Opl Res Soc , vol.35 , Issue.5 , pp. 401-406
    • Christer, A.H.1    Waller, M.2
  • 6
    • 0347615488 scopus 로고    scopus 로고
    • Case experience comparing the RCM approach to plant maintenance with a modelling approach
    • Murthy P and Blischke W (eds). John Wiley & Sons Inc.: New York
    • Jia X and Christer AH (2002). Case experience comparing the RCM approach to plant maintenance with a modelling approach. In: Murthy P and Blischke W (eds). Case studies in Reliability and Maintenance. John Wiley & Sons Inc.: New York, pp 477-494.
    • (2002) Case Studies in Reliability and Maintenance , pp. 477-494
    • Jia, X.1    Christer, A.H.2
  • 7
    • 0034248564 scopus 로고    scopus 로고
    • Refining the delay-time based PM inspection model with non-negligible system downtime estimates of the expected number of failures
    • Christer AH and Lee CS (2000). Refining the delay-time based PM inspection model with non-negligible system downtime estimates of the expected number of failures. Int J Prod Econ 67(1): 77-85.
    • (2000) Int J Prod Econ , vol.67 , Issue.1 , pp. 77-85
    • Christer, A.H.1    Lee, C.S.2
  • 8
    • 0035393433 scopus 로고    scopus 로고
    • The development of a hybrid intelligent maintenance optimisation system (HIMOS)
    • Kobbacy KAH and Jeon J (2001). The development of a hybrid intelligent maintenance optimisation system (HIMOS). J Opl Res Soc 52: 762-778.
    • (2001) J Opl Res Soc , vol.52 , pp. 762-778
    • Kobbacy, K.A.H.1    Jeon, J.2
  • 9
    • 0348245189 scopus 로고    scopus 로고
    • Generalised non-stationary preventive maintenance model for deteriorating repairable systems
    • to appear.
    • Kobbacy KAH and Jeon J (2003). Generalised non-stationary preventive maintenance model for deteriorating repairable systems. Qual Reliab Eng Int., to appear.
    • (2003) Qual Reliab Eng Int.
    • Kobbacy, K.A.H.1    Jeon, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.