메뉴 건너뛰기




Volumn 24, Issue 5, 1998, Pages 315-324

Power system reliability cost/benefit assessment and application in perspective

Author keywords

Customer survey; Outrage costs; Power system reliability; Reliability cost; Reliability worth; Supply reliability; Value based reliability; Worth of supply

Indexed keywords


EID: 0346855639     PISSN: 00457906     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0045-7906(98)00011-1     Document Type: Article
Times cited : (9)

References (28)
  • 2
    • 0028370657 scopus 로고
    • Bibliography on the application of probability methods in power system reliability evaluation: 1987-1991
    • Allan RN, Billinton R, Breipohl AM, Grigg CH. Bibliography on the application of probability methods in power system reliability evaluation: 1987-1991. IEEE Trans Power Syst 1994;9:41-9.
    • (1994) IEEE Trans Power Syst , vol.9 , pp. 41-49
    • Allan, R.N.1    Billinton, R.2    Breipohl, A.M.3    Grigg, C.H.4
  • 3
    • 0026258774 scopus 로고
    • Comprehensive bibliography on reliability worth and electrical service customer interruption costs: 1980 1990
    • Tollefson G, Billinton R, Wacker G. Comprehensive bibliography on reliability worth and electrical service customer interruption costs: 1980 1990. IEEE Trans Power Syst 1991;6(4):1508-14.
    • (1991) IEEE Trans Power Syst , vol.6 , Issue.4 , pp. 1508-1514
    • Tollefson, G.1    Billinton, R.2    Wacker, G.3
  • 4
    • 0026257501 scopus 로고
    • Power system reliability planning practices in North America
    • Sanghvi AP, Balu NJ, Lauby MG. Power system reliability planning practices in North America. IEEE Trans Power Syst 1991;6(4):1485-91.
    • (1991) IEEE Trans Power Syst , vol.6 , Issue.4 , pp. 1485-1491
    • Sanghvi, A.P.1    Balu, N.J.2    Lauby, M.G.3
  • 5
    • 0025521546 scopus 로고    scopus 로고
    • Measurement and application of customer interruption costs/value of service for cost-benefit reliability evaluation: Some commonly raised issues
    • Sanghvi AP. Measurement and application of customer interruption costs/value of service for cost-benefit reliability evaluation: some commonly raised issues. IEEE Trans Power Syst 5(4): 1333-1344.
    • IEEE Trans Power Syst , vol.5 , Issue.4 , pp. 1333-1344
    • Sanghvi, A.P.1
  • 7
    • 0030143160 scopus 로고    scopus 로고
    • Interruption costs, customer satisfaction and expectation of service reliability
    • Sullivan MJ, Suddeth BN, Vardel T, Vojdani A. Interruption costs, customer satisfaction and expectation of service reliability. IEEE Trans 1996;11(2):989-95.
    • (1996) IEEE Trans , vol.11 , Issue.2 , pp. 989-995
    • Sullivan, M.J.1    Suddeth, B.N.2    Vardel, T.3    Vojdani, A.4
  • 10
    • 0024681261 scopus 로고
    • Customer cost of electric service interruptions
    • Wacker G, Billinton R. Customer cost of electric service interruptions. Proc IEEE 1989;77(6):919-30.
    • (1989) Proc IEEE , vol.77 , Issue.6 , pp. 919-930
    • Wacker, G.1    Billinton, R.2
  • 14
    • 0024719222 scopus 로고
    • A reliability test system for educational purposes: Basic data
    • Billinton R, Kumar S, Goel L et al. A reliability test system for educational purposes: basic data. IEEE Trans Power Syst 1989;4(3): 1238-44.
    • (1989) IEEE Trans Power Syst , vol.4 , Issue.3 , pp. 1238-1244
    • Billinton, R.1    Kumar, S.2    Goel, L.3
  • 15
    • 0028545023 scopus 로고
    • Probability distribution approach to describe customer costs due to electric supply distributions
    • Billinton R, Chan E, Wacker G. Probability distribution approach to describe customer costs due to electric supply distributions. IEE Proc Gen Trans Dist 1994;141(6):594-8.
    • (1994) IEE Proc Gen Trans Dist , vol.141 , Issue.6 , pp. 594-598
    • Billinton, R.1    Chan, E.2    Wacker, G.3
  • 16
    • 85033904974 scopus 로고
    • Utilization of interrupted energy assessment rate in generation and transmission planning
    • paper 90 SM 290-7 PWRS. Minneapolis, Minnesota, USA, July
    • Oteng-Adjei J, Billinton R. Utilization of interrupted energy assessment rate in generation and transmission planning. IEEE PES Summer Power Meeting, paper 90 SM 290-7 PWRS. Minneapolis, Minnesota, USA, July 1990.
    • (1990) IEEE PES Summer Power Meeting
    • Oteng-Adjei, J.1    Billinton, R.2
  • 18
    • 0023399871 scopus 로고
    • Comparison of two alternate methods to establish an interrupted energy assessment rate
    • Billinton R, Oteng-Adjei J, Ghajar R. Comparison of two alternate methods to establish an interrupted energy assessment rate. IEEE Trans Power App Syst 1987;PWRS-2:751-7.
    • (1987) IEEE Trans Power App Syst , vol.PWRS-2 , pp. 751-757
    • Billinton, R.1    Oteng-Adjei, J.2    Ghajar, R.3
  • 19
    • 0025517053 scopus 로고
    • Evaluation of interrupted energy assessment rates in composite systems
    • Oteng-Adjei J, Billinton R. Evaluation of interrupted energy assessment rates in composite systems. IEEE Trans Power Syst 1990;5(4):1317-23.
    • (1990) IEEE Trans Power Syst , vol.5 , Issue.4 , pp. 1317-1323
    • Oteng-Adjei, J.1    Billinton, R.2
  • 20
    • 0028462520 scopus 로고
    • Determination of reliability worth for distribution system planning
    • Goel L, Billinton R. Determination of reliability worth for distribution system planning. IEEE Trans Power Delivery 1994;9(3):1577-83.
    • (1994) IEEE Trans Power Delivery , vol.9 , Issue.3 , pp. 1577-1583
    • Goel, L.1    Billinton, R.2
  • 21
    • 0028465997 scopus 로고
    • Prediction of customer load point service reliability worth estimates in an electric power system
    • Goel L, Billinton R. Prediction of customer load point service reliability worth estimates in an electric power system. IEE Proc Gen Trans Dist 1994;141(4):390-6.
    • (1994) IEE Proc Gen Trans Dist , vol.141 , Issue.4 , pp. 390-396
    • Goel, L.1    Billinton, R.2
  • 22
    • 0027643957 scopus 로고
    • Utilization of interrupted energy assessment rates to evaluate reliability worth in electric power systems
    • Goel L, Billinton R. Utilization of interrupted energy assessment rates to evaluate reliability worth in electric power systems. IEEE Trans Power Syst 1993;PWRS-8(3):929-36.
    • (1993) IEEE Trans Power Syst , vol.PWRS-8 , Issue.3 , pp. 929-936
    • Goel, L.1    Billinton, R.2
  • 23
    • 0025510185 scopus 로고
    • A procedure for estimating the worth of generating unit refurbishment
    • Billinton R, Goel L. A procedure for estimating the worth of generating unit refurbishment. Can J Electric Comput Eng 1990; 15(4).
    • (1990) Can J Electric Comput Eng , vol.15 , Issue.4
    • Billinton, R.1    Goel, L.2
  • 24
    • 0023979713 scopus 로고
    • Cost/benefit approach to establish optimum adequacy level for generation system planning
    • Billinton R, Oteng-Adjei J. Cost/benefit approach to establish optimum adequacy level for generation system planning. IEE Proc Gen Trans Dist 1988;135(2):81-7.
    • (1988) IEE Proc Gen Trans Dist , vol.135 , Issue.2 , pp. 81-87
    • Billinton, R.1    Oteng-Adjei, J.2
  • 26
    • 0028548371 scopus 로고
    • The use of probability techniques in value-based planning
    • Rau NS. The use of probability techniques in value-based planning. IEEE Trans Power Syst 1994;9(4):2001-13.
    • (1994) IEEE Trans Power Syst , vol.9 , Issue.4 , pp. 2001-2013
    • Rau, N.S.1
  • 28
    • 0030214346 scopus 로고    scopus 로고
    • Distributed nature of residential customer outage costs
    • Ghajar R, Billinton R, Chan E. Distributed nature of residential customer outage costs. IEEE Trans Power Syst 1996;11(3):1236-44.
    • (1996) IEEE Trans Power Syst , vol.11 , Issue.3 , pp. 1236-1244
    • Ghajar, R.1    Billinton, R.2    Chan, E.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.