Volumn 5, Issue 4, 1990, Pages 1333-1344

Measurement and application of customer interruption costs/value of service for cost-benefit reliability evaluation: Some commonly raised issues

Author keywords

[No Author keywords available]

Indexed keywords

ELECTRIC MEASUREMENTS; ELECTRIC POWER SYSTEMS--RELIABILITY; INDUSTRIAL ECONOMICS;

EID: 0025521546     PISSN: 08858950     EISSN: 15580679     Source Type: Journal    
DOI: 10.1109/59.99385     Document Type: Article
Times cited : (38)

References (36)
  • 2
    • 84944992520 scopus 로고
    • The Cost of Electrical Supply Interruptions
    • Boston Edison Company, April
    • Boston Edison Company, “The Cost of Electrical Supply Interruptions.” Final report prepared by Resource Consulting Group, April 1981.
    • (1981) Final report prepared by Resource Consulting Group
  • 3
    • 84944992521 scopus 로고
    • Are Utilities Gold Plated? A Perspective in Electric Utility Reliability
    • Congressional Research Service, report prepared for the, U.S. House of Representatives, April
    • Congressional Research Service, “Are Utilities Gold Plated? A Perspective in Electric Utility Reliability,” report prepared for the Subcommittee on Energy and Power, Committee on Interstate and foreign Commerce, U.S. House of Representatives, April 1979.
    • (1979) Subcommittee on Energy and Power, Committee on Interstate and foreign Commerce
  • 4
    • 84944992522 scopus 로고
    • The Cost of an Urban Blackout. The Consolidated Edison Blackout July 13-14,1977
    • U.S. Government Printing Office, Washington, D.C., USA
    • Congressional Research Service, “The Cost of an Urban Blackout. The Consolidated Edison Blackout July 13-14,1977,” U.S. Government Printing Office, Washington, D.C., USA, 1978.
    • (1978) Congressional Research Service
  • 5
    • 6144296015 scopus 로고
    • Impact Assessment of the 1977 New York City Blackout
    • Department of Energy (DOE), Arlington, VA, July
    • Department of Energy (DOE), “Impact Assessment of the 1977 New York City Blackout,” Final report HCP/T5103-01, Arlington, VA, July 1978.
    • (1978) Final report HCP/T5103-01
  • 6
    • 84944983481 scopus 로고
    • The National Electric Reliability Study
    • Department of Energy (DOE), April
    • Department of Energy (DOE), “The National Electric Reliability Study,” Final Report DOE/EP-0004, April 1981.
    • (1981) Final Report DOE/EP-0004
  • 7
    • 84939705426 scopus 로고
    • Environment and Socioeconomic Consequences of a Shortage in Installed Generating Capacity
    • Electric Power Research Institute (EPRI)
    • Electric Power Research Institute (EPRI), “Environment and Socioeconomic Consequences of a Shortage in Installed Generating Capacity,” EA-2462, 1982.
    • (1982) , vol.EA-2462
  • 8
    • 84944992523 scopus 로고
    • Optimal Selection of Reliability Standards in Practice of and Theory
    • Electric Power Research Institute (EPRI), draft final report, RP-1988, January
    • Electric Power Research Institute (EPRI), “Optimal Selection of Reliability Standards in Practice of and Theory,” draft final report, RP-1988, January 1987.
    • (1987)
  • 9
    • 84939731073 scopus 로고
    • Power Shortage Costs: Estimates and Applications
    • Electric Power Research Institute (EPRI), December
    • Electric Power Research Institute (EPRI), “Power Shortage Costs: Estimates and Applications,” EA-1215, December 1981.
    • (1981) , vol.EA-1215
  • 10
    • 84939744688 scopus 로고
    • The Value of Electricity Supply Reliability
    • Electric Power Research Institute (EPRI), RP-1104-3
    • Electric Power Research Institute (EPRI), “The Value of Electricity Supply Reliability,” RP-1104-3, 1982
    • (1982)
  • 11
    • 84944978816 scopus 로고
    • The Value of Reliability
    • Electric Power Research Institute (EPRI), March
    • Electric Power Research Institute (EPRI), “The Value of Reliability,” EPRI Journal. March 1986
    • (1986) EPRI Journal
  • 12
    • 84939704557 scopus 로고
    • Value of Service Reliability to Consumers
    • Electric Power Research Institute (EPRI), March
    • Electric Power Research Institute (EPRI), “Value of Service Reliability to Consumers,” EA-4494, March 1986.
    • (1986) , vol.EA-4494
  • 13
    • 3042887091 scopus 로고
    • Value-Based Utility Planning: Scoping Study
    • Electric Research Institute (EPRI), January
    • Electric Research Institute (EPRI), “Value-Based Utility Planning: Scoping Study,” EM-4389, January 1986.
    • (1986) , vol.EM-4389
  • 14
    • 84919038699 scopus 로고
    • How Much Is Enough? Reserves of 20-35% May be Cheaper for Customers
    • Electrical Week, 15 May
    • Electrical Week, “How Much Is Enough? Reserves of 20-35% May be Cheaper for Customers,” 15 May 1978, pp 3–4.
    • (1978) , pp. 3-4
  • 15
    • 84919038701 scopus 로고
    • The Growing Role of Reliability
    • Electrical World, October
    • Electrical World, “The Growing Role of Reliability,” October 1981, pp. 74–85.
    • (1981) , pp. 74-85
  • 16
    • 84944992526 scopus 로고
    • Customer Perception of Reliability
    • Empire State Electric Energy Research Corporation, report prepared bv Robinson Associates, May
    • Empire State Electric Energy Research Corporation, “Customer Perception of Reliability,” report prepared bv Robinson Associates, May 1982.
    • (1982)
  • 17
    • 84921089195 scopus 로고
    • The Adequacy of Future Electric Power Supply: Problems and Policies
    • Federal Power Commission (FPC)
    • Federal Power Commission (FPC), “The Adequacy of Future Electric Power Supply: Problems and Policies,” Report of the Technical Advisory Committee, 1974.
    • (1974) Report of the Technical Advisory Committee
  • 18
    • 84939740252 scopus 로고
    • Need Determination for Proposed Lake Tarpon-Kathleen 500 kV Line
    • Florida Public Service Commission, Florida Power Corporation, Docket No. 840044-EI, Order No. 13676, Issued September 13
    • Florida Public Service Commission, “Need Determination for Proposed Lake Tarpon-Kathleen 500 kV Line,” Florida Power Corporation, Docket No. 840044-EI, Order No. 13676, Issued September 13, 1984.
    • (1984)
  • 19
    • 84921089197 scopus 로고
    • Report on Reliability Survey of Industrial Plants, Part II: Cost of Power Outages, Plant Restart Time, Critical Service, Loss Duration Time, and Type of Loads Lost Versus Time of Power Outages
    • Institute of Electrical and Electronic Engineers (IEEE), March-April
    • Institute of Electrical and Electronic Engineers (IEEE), “Report on Reliability Survey of Industrial Plants, Part II: Cost of Power Outages, Plant Restart Time, Critical Service, Loss Duration Time, and Type of Loads Lost Versus Time of Power Outages,” IEEE Transactions on industry Applications, Vol. 1A-10, No. 2, March-April 1973.
    • (1973) IEEE Transactions on industry Applications , vol.1A-10 , Issue.2
  • 21
    • 0011880914 scopus 로고
    • Reliability of Electricity Supply, Outage Costs, and Value of Service: An Overview
    • to appear in, Fall
    • Munasinghe, M., Sanghvi, A.P., “Reliability of Electricity Supply, Outage Costs, and Value of Service: An Overview,” to appear in The Energy Journal, Fall 1988
    • (1988) The Energy Journal
    • Munasinghe, M.1    Sanghvi, A.P.2
  • 22
    • 84944992528 scopus 로고
    • Stipulation on ‘Inventory’ Ratemaking Methodology
    • Case No. 1804, December
    • New Mexico Public Service Commission, “Stipulation on ‘Inventory’ Ratemaking Methodology,” Case No. 1804, December 1984.
    • (1984) New Mexico Public Service Commission
  • 23
    • 84944982148 scopus 로고
    • Survey on Power System Reliability: Summary of Customer Viewpoints
    • Ontario Hydro, Report R&U 80-12
    • Ontario Hydro, “Survey on Power System Reliability: Summary of Customer Viewpoints,” Report R&U 80-12,1980.
    • (1980)
  • 24
    • 84939756206 scopus 로고
    • Residential Outage Cost Estimation
    • Pacific Gas & Electric Company (PG&E), Rate Department, December
    • Pacific Gas & Electric Company (PG&E), “Residential Outage Cost Estimation” Rate Department, December 1986.
    • (1986)
  • 25
    • 84939716172 scopus 로고
    • Value of Service Study
    • Pacific Gas & Electric Company (PG&E), Rate Department
    • Pacific Gas & Electric Company (PG&E), “Value of Service Study,” Rate Department, 1985.
    • (1985)
  • 27
    • 84939698978 scopus 로고
    • In the Matter of Florida Power and Light Company, Need Determination on Request for Levee - Midway 500 kV Electrical Transmission Line
    • before the Florida Public Service Commission, Docket No. 880293-EI Tallahassee, Florida, March 9
    • Sanghvi, A.P. “In the Matter of Florida Power and Light Company, Need Determination on Request for Levee - Midway 500 kV Electrical Transmission Line,” testimony on Value of Service, before the Florida Public Service Commission, Docket No. 880293-EI Tallahassee, Florida, March 9, 1988.
    • (1988) testimony on Value of Service
    • Sanghvi, A.P.1
  • 28
    • 0020642260 scopus 로고
    • Optimal Electricity Supply Reliability Using Customer Shortages Costs
    • April
    • Sanghvi, A.P., “Optimal Electricity Supply Reliability Using Customer Shortages Costs,” Energy Economics. April 1983, pp. 129–136.
    • (1983) Energy Economics , pp. 129-136
    • Sanghvi, A.P.1
  • 29
    • 84944992523 scopus 로고
    • Optimal Selection of Reliability Standards in Practice and Theory
    • draft final report submitted to EPRI, RP-1988, January
    • Sanghvi, A.P., “Optimal Selection of Reliability Standards in Practice and Theory,” draft final report submitted to EPRI, RP-1988, January 1987.
    • (1987)
    • Sanghvi, A.P.1
  • 30
    • 0020335999 scopus 로고
    • The Economic Costs of Electricity Supply Interruptions: U.S. and Foreign Experience
    • June
    • Sanghvi, A.P., “The Economic Costs of Electricity Supply Interruptions: U.S. and Foreign Experience,” Energy Economics, June 1982, pp. 180–198.
    • (1982) Energy Economics , pp. 180-198
    • Sanghvi, A.P.1
  • 32
    • 33750186243 scopus 로고
    • Impact Assessment of the 1977 New York City Blackout
    • Systems Control Inc. (SCI). Final report prepared for U.S. Department of Energy, HCP/T5103-01, Arlington, Virginia. July
    • Systems Control Inc. (SCI). “Impact Assessment of the 1977 New York City Blackout,” Final report prepared for U.S. Department of Energy, HCP/T5103-01, Arlington, Virginia. July 1978.
    • (1978)
  • 33
    • 0011484451 scopus 로고
    • The Economics of Alternative Levels of Reliability for Electric Power Generation Systems
    • Autumn
    • Telson, M.L., “The Economics of Alternative Levels of Reliability for Electric Power Generation Systems,” Bell Journal of Economics, Vol. 6, No. 2, Autumn 1975, pp. 679–694.
    • (1975) Bell Journal of Economics , vol.6 , Issue.2 , pp. 679-694
    • Telson, M.L.1
  • 34
    • 0019437206 scopus 로고
    • Generation System Planning under Load Forecast Uncertainty
    • Jan.
    • Stremmel, J.P., “Generation System Planning under Load Forecast Uncertainty”, IEEE Transactions on Power Apparatus and Systems, Vol. 100, No. 1, Jan. 1981, 384–393.
    • (1981) IEEE Transactions on Power Apparatus and Systems , vol.100 , Issue.1 , pp. 384-393
    • Stremmel, J.P.1
  • 35
    • 0020145528 scopus 로고
    • Strategic Planning for Power Systems Reliability and Vulnerability: An Optimization Model for Resource Planning Under Uncertainty
    • June
    • Sanghvi, A.P., “Strategic Planning for Power Systems Reliability and Vulnerability: An Optimization Model for Resource Planning Under Uncertainty”, IEEE Transactions on Power Apparatus and Systems, Vol. 101, No. 6, June 1982, 1420–1429.
    • (1982) IEEE Transactions on Power Apparatus and Systems , vol.101 , Issue.6 , pp. 1420-1429
    • Sanghvi, A.P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.