-
1
-
-
0020221335
-
Customer Damage Resulting from Electric Service Interruption
-
R&D Project 907U131, April
-
Billinton, R., Wacker, G., Wojcznski, E. “Customer Damage Resulting from Electric Service Interruption,” Report prepared for the Canadian Electric Association, R&D Project 907U131, April 1982.
-
(1982)
Report prepared for the Canadian Electric Association
-
-
Billinton, R.1
Wacker, G.2
Wojcznski, E.3
-
2
-
-
84944992520
-
The Cost of Electrical Supply Interruptions
-
Boston Edison Company, April
-
Boston Edison Company, “The Cost of Electrical Supply Interruptions.” Final report prepared by Resource Consulting Group, April 1981.
-
(1981)
Final report prepared by Resource Consulting Group
-
-
-
3
-
-
84944992521
-
Are Utilities Gold Plated? A Perspective in Electric Utility Reliability
-
Congressional Research Service, report prepared for the, U.S. House of Representatives, April
-
Congressional Research Service, “Are Utilities Gold Plated? A Perspective in Electric Utility Reliability,” report prepared for the Subcommittee on Energy and Power, Committee on Interstate and foreign Commerce, U.S. House of Representatives, April 1979.
-
(1979)
Subcommittee on Energy and Power, Committee on Interstate and foreign Commerce
-
-
-
4
-
-
84944992522
-
The Cost of an Urban Blackout. The Consolidated Edison Blackout July 13-14,1977
-
U.S. Government Printing Office, Washington, D.C., USA
-
Congressional Research Service, “The Cost of an Urban Blackout. The Consolidated Edison Blackout July 13-14,1977,” U.S. Government Printing Office, Washington, D.C., USA, 1978.
-
(1978)
Congressional Research Service
-
-
-
5
-
-
6144296015
-
Impact Assessment of the 1977 New York City Blackout
-
Department of Energy (DOE), Arlington, VA, July
-
Department of Energy (DOE), “Impact Assessment of the 1977 New York City Blackout,” Final report HCP/T5103-01, Arlington, VA, July 1978.
-
(1978)
Final report HCP/T5103-01
-
-
-
6
-
-
84944983481
-
The National Electric Reliability Study
-
Department of Energy (DOE), April
-
Department of Energy (DOE), “The National Electric Reliability Study,” Final Report DOE/EP-0004, April 1981.
-
(1981)
Final Report DOE/EP-0004
-
-
-
7
-
-
84939705426
-
Environment and Socioeconomic Consequences of a Shortage in Installed Generating Capacity
-
Electric Power Research Institute (EPRI)
-
Electric Power Research Institute (EPRI), “Environment and Socioeconomic Consequences of a Shortage in Installed Generating Capacity,” EA-2462, 1982.
-
(1982)
, vol.EA-2462
-
-
-
8
-
-
84944992523
-
Optimal Selection of Reliability Standards in Practice of and Theory
-
Electric Power Research Institute (EPRI), draft final report, RP-1988, January
-
Electric Power Research Institute (EPRI), “Optimal Selection of Reliability Standards in Practice of and Theory,” draft final report, RP-1988, January 1987.
-
(1987)
-
-
-
9
-
-
84939731073
-
Power Shortage Costs: Estimates and Applications
-
Electric Power Research Institute (EPRI), December
-
Electric Power Research Institute (EPRI), “Power Shortage Costs: Estimates and Applications,” EA-1215, December 1981.
-
(1981)
, vol.EA-1215
-
-
-
10
-
-
84939744688
-
The Value of Electricity Supply Reliability
-
Electric Power Research Institute (EPRI), RP-1104-3
-
Electric Power Research Institute (EPRI), “The Value of Electricity Supply Reliability,” RP-1104-3, 1982
-
(1982)
-
-
-
11
-
-
84944978816
-
The Value of Reliability
-
Electric Power Research Institute (EPRI), March
-
Electric Power Research Institute (EPRI), “The Value of Reliability,” EPRI Journal. March 1986
-
(1986)
EPRI Journal
-
-
-
12
-
-
84939704557
-
Value of Service Reliability to Consumers
-
Electric Power Research Institute (EPRI), March
-
Electric Power Research Institute (EPRI), “Value of Service Reliability to Consumers,” EA-4494, March 1986.
-
(1986)
, vol.EA-4494
-
-
-
13
-
-
3042887091
-
Value-Based Utility Planning: Scoping Study
-
Electric Research Institute (EPRI), January
-
Electric Research Institute (EPRI), “Value-Based Utility Planning: Scoping Study,” EM-4389, January 1986.
-
(1986)
, vol.EM-4389
-
-
-
14
-
-
84919038699
-
How Much Is Enough? Reserves of 20-35% May be Cheaper for Customers
-
Electrical Week, 15 May
-
Electrical Week, “How Much Is Enough? Reserves of 20-35% May be Cheaper for Customers,” 15 May 1978, pp 3–4.
-
(1978)
, pp. 3-4
-
-
-
15
-
-
84919038701
-
The Growing Role of Reliability
-
Electrical World, October
-
Electrical World, “The Growing Role of Reliability,” October 1981, pp. 74–85.
-
(1981)
, pp. 74-85
-
-
-
16
-
-
84944992526
-
Customer Perception of Reliability
-
Empire State Electric Energy Research Corporation, report prepared bv Robinson Associates, May
-
Empire State Electric Energy Research Corporation, “Customer Perception of Reliability,” report prepared bv Robinson Associates, May 1982.
-
(1982)
-
-
-
17
-
-
84921089195
-
The Adequacy of Future Electric Power Supply: Problems and Policies
-
Federal Power Commission (FPC)
-
Federal Power Commission (FPC), “The Adequacy of Future Electric Power Supply: Problems and Policies,” Report of the Technical Advisory Committee, 1974.
-
(1974)
Report of the Technical Advisory Committee
-
-
-
18
-
-
84939740252
-
Need Determination for Proposed Lake Tarpon-Kathleen 500 kV Line
-
Florida Public Service Commission, Florida Power Corporation, Docket No. 840044-EI, Order No. 13676, Issued September 13
-
Florida Public Service Commission, “Need Determination for Proposed Lake Tarpon-Kathleen 500 kV Line,” Florida Power Corporation, Docket No. 840044-EI, Order No. 13676, Issued September 13, 1984.
-
(1984)
-
-
-
19
-
-
84921089197
-
Report on Reliability Survey of Industrial Plants, Part II: Cost of Power Outages, Plant Restart Time, Critical Service, Loss Duration Time, and Type of Loads Lost Versus Time of Power Outages
-
Institute of Electrical and Electronic Engineers (IEEE), March-April
-
Institute of Electrical and Electronic Engineers (IEEE), “Report on Reliability Survey of Industrial Plants, Part II: Cost of Power Outages, Plant Restart Time, Critical Service, Loss Duration Time, and Type of Loads Lost Versus Time of Power Outages,” IEEE Transactions on industry Applications, Vol. 1A-10, No. 2, March-April 1973.
-
(1973)
IEEE Transactions on industry Applications
, vol.1A-10
, Issue.2
-
-
-
21
-
-
0011880914
-
Reliability of Electricity Supply, Outage Costs, and Value of Service: An Overview
-
to appear in, Fall
-
Munasinghe, M., Sanghvi, A.P., “Reliability of Electricity Supply, Outage Costs, and Value of Service: An Overview,” to appear in The Energy Journal, Fall 1988
-
(1988)
The Energy Journal
-
-
Munasinghe, M.1
Sanghvi, A.P.2
-
22
-
-
84944992528
-
Stipulation on ‘Inventory’ Ratemaking Methodology
-
Case No. 1804, December
-
New Mexico Public Service Commission, “Stipulation on ‘Inventory’ Ratemaking Methodology,” Case No. 1804, December 1984.
-
(1984)
New Mexico Public Service Commission
-
-
-
23
-
-
84944982148
-
Survey on Power System Reliability: Summary of Customer Viewpoints
-
Ontario Hydro, Report R&U 80-12
-
Ontario Hydro, “Survey on Power System Reliability: Summary of Customer Viewpoints,” Report R&U 80-12,1980.
-
(1980)
-
-
-
24
-
-
84939756206
-
Residential Outage Cost Estimation
-
Pacific Gas & Electric Company (PG&E), Rate Department, December
-
Pacific Gas & Electric Company (PG&E), “Residential Outage Cost Estimation” Rate Department, December 1986.
-
(1986)
-
-
-
25
-
-
84939716172
-
Value of Service Study
-
Pacific Gas & Electric Company (PG&E), Rate Department
-
Pacific Gas & Electric Company (PG&E), “Value of Service Study,” Rate Department, 1985.
-
(1985)
-
-
-
27
-
-
84939698978
-
In the Matter of Florida Power and Light Company, Need Determination on Request for Levee - Midway 500 kV Electrical Transmission Line
-
before the Florida Public Service Commission, Docket No. 880293-EI Tallahassee, Florida, March 9
-
Sanghvi, A.P. “In the Matter of Florida Power and Light Company, Need Determination on Request for Levee - Midway 500 kV Electrical Transmission Line,” testimony on Value of Service, before the Florida Public Service Commission, Docket No. 880293-EI Tallahassee, Florida, March 9, 1988.
-
(1988)
testimony on Value of Service
-
-
Sanghvi, A.P.1
-
28
-
-
0020642260
-
Optimal Electricity Supply Reliability Using Customer Shortages Costs
-
April
-
Sanghvi, A.P., “Optimal Electricity Supply Reliability Using Customer Shortages Costs,” Energy Economics. April 1983, pp. 129–136.
-
(1983)
Energy Economics
, pp. 129-136
-
-
Sanghvi, A.P.1
-
29
-
-
84944992523
-
Optimal Selection of Reliability Standards in Practice and Theory
-
draft final report submitted to EPRI, RP-1988, January
-
Sanghvi, A.P., “Optimal Selection of Reliability Standards in Practice and Theory,” draft final report submitted to EPRI, RP-1988, January 1987.
-
(1987)
-
-
Sanghvi, A.P.1
-
30
-
-
0020335999
-
The Economic Costs of Electricity Supply Interruptions: U.S. and Foreign Experience
-
June
-
Sanghvi, A.P., “The Economic Costs of Electricity Supply Interruptions: U.S. and Foreign Experience,” Energy Economics, June 1982, pp. 180–198.
-
(1982)
Energy Economics
, pp. 180-198
-
-
Sanghvi, A.P.1
-
32
-
-
33750186243
-
Impact Assessment of the 1977 New York City Blackout
-
Systems Control Inc. (SCI). Final report prepared for U.S. Department of Energy, HCP/T5103-01, Arlington, Virginia. July
-
Systems Control Inc. (SCI). “Impact Assessment of the 1977 New York City Blackout,” Final report prepared for U.S. Department of Energy, HCP/T5103-01, Arlington, Virginia. July 1978.
-
(1978)
-
-
-
33
-
-
0011484451
-
The Economics of Alternative Levels of Reliability for Electric Power Generation Systems
-
Autumn
-
Telson, M.L., “The Economics of Alternative Levels of Reliability for Electric Power Generation Systems,” Bell Journal of Economics, Vol. 6, No. 2, Autumn 1975, pp. 679–694.
-
(1975)
Bell Journal of Economics
, vol.6
, Issue.2
, pp. 679-694
-
-
Telson, M.L.1
-
34
-
-
0019437206
-
Generation System Planning under Load Forecast Uncertainty
-
Jan.
-
Stremmel, J.P., “Generation System Planning under Load Forecast Uncertainty”, IEEE Transactions on Power Apparatus and Systems, Vol. 100, No. 1, Jan. 1981, 384–393.
-
(1981)
IEEE Transactions on Power Apparatus and Systems
, vol.100
, Issue.1
, pp. 384-393
-
-
Stremmel, J.P.1
-
35
-
-
0020145528
-
Strategic Planning for Power Systems Reliability and Vulnerability: An Optimization Model for Resource Planning Under Uncertainty
-
June
-
Sanghvi, A.P., “Strategic Planning for Power Systems Reliability and Vulnerability: An Optimization Model for Resource Planning Under Uncertainty”, IEEE Transactions on Power Apparatus and Systems, Vol. 101, No. 6, June 1982, 1420–1429.
-
(1982)
IEEE Transactions on Power Apparatus and Systems
, vol.101
, Issue.6
, pp. 1420-1429
-
-
Sanghvi, A.P.1
-
36
-
-
0003490113
-
-
forthcoming, Resources for the Future, Washington, D.C.
-
Mitchell, R.C., Carson R.T., Using Surveys to Value Public Goods: The Contingent Valuation Method, forthcoming, Resources for the Future, Washington, D.C.
-
Using Surveys to Value Public Goods: The Contingent Valuation Method
-
-
Mitchell, R.C.1
Carson, R.T.2
|