-
2
-
-
0003718760
-
Contribution à une approach méthodologique de I'assemblage automatisé: elaboration automatique des séquences opératoires
-
Thése d'état, Université de Franche-Comté, Besancon
-
Bourjault, A., 1984, Contribution à une approach méthodologique de I'assemblage automatisé: elaboration automatique des séquences opératoires. Thése d'état, Université de Franche-Comté, Besancon.
-
(1984)
-
-
Bourjault, A.1
-
3
-
-
0242648760
-
Stable assembly sequence planning using a genetic algorithm
-
Chen, S. F. and Liao, X. Y., 1999, Stable assembly sequence planning using a genetic algorithm. In Proceedings of the 1999 ASME Design for Engineering Technical Conferences, Las Vegas, NA, pp. 563-569.
-
(1999)
Proceedings of the 1999 ASME Design for Engineering Technical Conferences, Las Vegas, NA
, pp. 563-569
-
-
Chen, S.F.1
Liao, X.Y.2
-
4
-
-
0023537240
-
Simplified generation of all mechanical assembly sequences
-
De Fazio, T. L. and Whitney, D. E., 1987, Simplified generation of all mechanical assembly sequences. IEEE Journal of Robotics and Automation, RA-3, 640-658.
-
(1987)
IEEE Journal of Robotics and Automation
, vol.RA-3
, pp. 640-658
-
-
De Fazio, T.L.1
Whitney, D.E.2
-
5
-
-
0032689335
-
Generation of optimized assembly sequences using genetic algorithms
-
Dini, G., Failli, F., Lazzerini, B. and Marcelloni, F., 1999, Generation of optimized assembly sequences using genetic algorithms. Annals CIRP, 48, 17-20.
-
(1999)
Annals CIRP
, vol.48
, pp. 17-20
-
-
Dini, G.1
Failli, F.2
Lazzerini, B.3
Marcelloni, F.4
-
6
-
-
0027052183
-
Automated sequencing and subassembly detection in assembly planning
-
Dini, G. and Santochi, M., 1992, Automated sequencing and subassembly detection in assembly planning. Annals CIRP, 41, 1-4.
-
(1992)
Annals CIRP
, vol.41
, pp. 1-4
-
-
Dini, G.1
Santochi, M.2
-
7
-
-
0029483649
-
An integrated approach to the generation of assembly sequences
-
Gottipolu, R. B. and Ghosh, K., 1995, An integrated approach to the generation of assembly sequences. International Journal of Computer Applications in Technology, 8, 125-138.
-
(1995)
International Journal of Computer Applications in Technology
, vol.8
, pp. 125-138
-
-
Gottipolu, R.B.1
Ghosh, K.2
-
8
-
-
0031373295
-
Representation and selection of assembly sequences in computer-aided assembly process planning
-
Gottipolu, R. B. and Ghosh, K., 1997, Representation and selection of assembly sequences in computer-aided assembly process planning. International Journal of Production Research, 35, 3447-3465.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 3447-3465
-
-
Gottipolu, R.B.1
Ghosh, K.2
-
9
-
-
0002117744
-
Equipment selection and task assignment for multiproduct assembly system design
-
Graves, S. C. and Redfield, C. H., 1988, Equipment selection and task assignment for multiproduct assembly system design. International Journal of Flexible Manufacturing Systems, 1, 31-50.
-
(1988)
International Journal of Flexible Manufacturing Systems
, vol.1
, pp. 31-50
-
-
Graves, S.C.1
Redfield, C.H.2
-
10
-
-
0035866455
-
Diassembly sequence plan generation using a branch-and-bound algorithm
-
Güngör, A. and Gupta, M., 2001, Diassembly sequence plan generation using a branch-and-bound algorithm. International Journal of Production Research, 39, 481-509.
-
(2001)
International Journal of Production Research
, vol.39
, pp. 481-509
-
-
Güngör, A.1
Gupta, M.2
-
11
-
-
0031258003
-
Design of assembly systems for modular products
-
He, D. W. and Kusiak, A., 1997, Design of assembly systems for modular products. IEEE Transactions on Robotics and Automation, 13, 646-655.
-
(1997)
IEEE Transactions on Robotics and Automation
, vol.13
, pp. 646-655
-
-
He, D.W.1
Kusiak, A.2
-
12
-
-
0025418409
-
AND/OR graph representation of assembly plans
-
Homen De Mello, L. S. and Sanderson, A. C., 1990, AND/OR graph representation of assembly plans. IEEE Transactions on Robotics and Automation, 6, 188-199.
-
(1990)
IEEE Transactions on Robotics and Automation
, vol.6
, pp. 188-199
-
-
Homen De Mello, L.S.1
Sanderson, A.C.2
-
13
-
-
0026142517
-
Representations of mechanical assembly sequences
-
Homen De Mello, L. S. and Sanderson, A. C., 1991, Representations of mechanical assembly sequences. IEEE Transactions on Robotics and Automation, 7, 211-227.
-
(1991)
IEEE Transactions on Robotics and Automation
, vol.7
, pp. 211-227
-
-
Homen De Mello, L.S.1
Sanderson, A.C.2
-
14
-
-
0027003836
-
Feedback evaluation of assembly plans
-
Hsu, W., Lee, C. S. G. and Su, S. F., 1992, Feedback evaluation of assembly plans. In Proceedings of the 1992 IEEE International Conference on Robotics and Automation, pp. 2419-2424.
-
(1992)
Proceedings of the 1992 IEEE International Conference on Robotics and Automation
, pp. 2419-2424
-
-
Hsu, W.1
Lee, C.S.G.2
Su, S.F.3
-
17
-
-
0029707115
-
ASPEN: Computer-aided assembly sequence planning and evaluation system based on predetermined time standard
-
Kanai, S., Takahashi, H. and Makino, H., 1996, ASPEN: computer-aided assembly sequence planning and evaluation system based on predetermined time standard. Annals of the CIRP, 45, 35-39.
-
(1996)
Annals of the CIRP
, vol.45
, pp. 35-39
-
-
Kanai, S.1
Takahashi, H.2
Makino, H.3
-
18
-
-
0028603951
-
Assembly sequences planning for simultaneous engineering applications
-
Laperriere, L. and ElMaraghy, H. A., 1994, Assembly sequences planning for simultaneous engineering applications. International Journal of Advanced Manufacturing Technology, 9, 231-244.
-
(1994)
International Journal of Advanced Manufacturing Technology
, vol.9
, pp. 231-244
-
-
Laperriere, L.1
ElMaraghy, H.A.2
-
21
-
-
34250078597
-
Assembly coplanner: Co-operative assembly planner based on subassembly extraction
-
Lee, S. and Shin, Y. G., 1993, Assembly coplanner: co-operative assembly planner based on subassembly extraction. Journal of Intelligent Manufacturing, 4, 183-198.
-
(1993)
Journal of Intelligent Manufacturing
, vol.4
, pp. 183-198
-
-
Lee, S.1
Shin, Y.G.2
-
22
-
-
0242648739
-
Automatic precedence relationship extraction for assembly sequence generation
-
Linn, R. J. and Tu, H. Y., 1993, Automatic precedence relationship extraction for assembly sequence generation. Journal of Design and Manufacturing, 3, 105-119.
-
(1993)
Journal of Design and Manufacturing
, vol.3
, pp. 105-119
-
-
Linn, R.J.1
Tu, H.Y.2
-
23
-
-
0242480469
-
Practical passive assembly: Gripper design and assembly sequence optimization
-
Marehalli, J. N. and Sturges, R. H., 1999, Practical passive assembly: gripper design and assembly sequence optimization. In Proceedings of the 1999 ASME Design for Engineering Technical Conferences, Las Vegas, NA, pp. 473-481.
-
(1999)
Proceedings of the 1999 ASME Design for Engineering Technical Conferences, Las Vegas, NA
, pp. 473-481
-
-
Marehalli, J.N.1
Sturges, R.H.2
-
24
-
-
0030129093
-
Minimal precedence constraints for integrated assembly and execution planning
-
Rajan, V. N. and Nof, S. Y., 1996, Minimal precedence constraints for integrated assembly and execution planning. IEEE Transactions on Robotics and Automation, 12, 175-186.
-
(1996)
IEEE Transactions on Robotics and Automation
, vol.12
, pp. 175-186
-
-
Rajan, V.N.1
Nof, S.Y.2
-
25
-
-
0025403568
-
Assembly sequence planning
-
Sanderson, A. C., Homen De Mello, L. S. and Zhang, H., 1990, Assembly sequence planning. AI Magazine, 11, 62-81.
-
(1990)
AI Magazine
, vol.11
, pp. 62-81
-
-
Sanderson, A.C.1
Homen De Mello, L.S.2
Zhang, H.3
-
28
-
-
0030130245
-
Boundary models for assembly knowledge representation
-
Thomas, J. P., Nissanke, N. and Baker, K. D., 1996, Boundary models for assembly knowledge representation. IEEE Transactions on Robotics and Automation, 12, 302-312.
-
(1996)
IEEE Transactions on Robotics and Automation
, vol.12
, pp. 302-312
-
-
Thomas, J.P.1
Nissanke, N.2
Baker, K.D.3
-
29
-
-
0026990146
-
A semi automatic assembly sequence planner
-
Warrts, J. J., Bobeschanscher, N. and Bronsvoort, W. F., 1992, A semi automatic assembly sequence planner. In Proceedings of the 1992 IEEE International Conference on Robotics and Automation, pp. 2431-2437.
-
(1992)
Proceedings of the 1992 IEEE International Conference on Robotics and Automation
, pp. 2431-2437
-
-
Warrts, J.J.1
Bobeschanscher, N.2
Bronsvoort, W.F.3
|