-
4
-
-
0003476405
-
-
PhD thesis, Swiss Federal Institute of Technology, Zurich, Switzerland
-
Balemi, S., 1992, Control of discrete event systems: theory and application. PhD thesis, Swiss Federal Institute of Technology, Zurich, Switzerland.
-
(1992)
Control of Discrete Event Systems: Theory and Application
-
-
Balemi, S.1
-
5
-
-
0029520732
-
Towards a design methodology for flexible manufacturing systems command combining SA-RT and object Petri nets
-
Paris, France
-
Ben Ahmed, S., Moalla, M. and Courvoisier, M., 1995, Towards a design methodology for flexible manufacturing systems command combining SA-RT and object Petri nets. Proceedings of the INRIA/ÆEE SETFA, Paris, France, pp. 83-94.
-
(1995)
Proceedings of the INRIA/ÆEE SETFA
, pp. 83-94
-
-
Ben Ahmed, S.1
Moalla, M.2
Courvoisier, M.3
-
6
-
-
0242358005
-
SIGMA: An intelligent and graphical system for the modelling of assembly systems
-
Ghent, Belgium
-
Breugnot, D., Gourgand, M. and Kellert, P., 1990, SIGMA: an intelligent and graphical system for the modelling of assembly systems. Proceedings of the 1990 ESS, Ghent, Belgium, pp. 225-230.
-
(1990)
Proceedings of the 1990 ESS
, pp. 225-230
-
-
Breugnot, D.1
Gourgand, M.2
Kellert, P.3
-
8
-
-
0029509722
-
Applying supervisory control theory to discrete event systems modeled by object oriented principles
-
Paris, France
-
Fabian, M. and Lennartson, B., 1995, Applying supervisory control theory to discrete event systems modeled by object oriented principles. Proceedings of the INRIA/IEEE SETFA, Paris, France, pp. 93-104.
-
(1995)
Proceedings of the INRIA/IEEE SETFA
, pp. 93-104
-
-
Fabian, M.1
Lennartson, B.2
-
10
-
-
0042996279
-
-
PhD thesis, Université Blaise Pascal, Clermont-Ferrand, France
-
Fleury, G., 1993, Méthodes stochastiques et déterministes pour les problèmes NP-Difficiles. PhD thesis, Université Blaise Pascal, Clermont-Ferrand, France.
-
(1993)
Méthodes Stochastiques Et déterministes Pour Les problèmes Np-Difficiles.
-
-
Fleury, G.1
-
11
-
-
0242295107
-
Multi-agent approach for manufacturing systems optimization
-
London, UK
-
Fleury, G., Goujon, J.-Y., Gourgand, M. and Lacomme, P., 1996, Multi-agent approach for manufacturing systems optimization. Proceedings of the PAAM Conference, London, UK, pp. 225-244.
-
(1996)
Proceedings of the PAAM Conference
, pp. 225-244
-
-
Fleury, G.1
Goujon, J.-Y.2
Gourgand, M.3
Lacomme, P.4
-
12
-
-
0035889165
-
Metaheuristics for the Stochastic Hoist Scheduling Problem (SHSP)
-
Fleury, G., Lacomme, P. and Gourgand, M., 2001, Metaheuristics for the Stochastic Hoist Scheduling Problem (SHSP). International Journal of Production Research, 39(15), 3419-3457.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.15
, pp. 3419-3457
-
-
Fleury, G.1
Lacomme, P.2
Gourgand, M.3
-
13
-
-
21844481321
-
Multicriteria approach for intelligent decision support in supervisory control
-
Gandibleux, X., Rosenthal-Sabroux, C. and Libert, G, 1994, Multicriteria approach for intelligent decision support in supervisory control. Annals of Operations Research, no. 51, 327-347.
-
(1994)
Annals of Operations Research
, vol.51
, pp. 327-347
-
-
Gandibleux, X.1
Rosenthal-Sabroux, C.2
Libert, G.3
-
15
-
-
0242263275
-
An object-oriented simulation model using a multi-agent approach for the hoist scheduling problem
-
Clermont-Ferrand, France, 15-17 July
-
Goujon J.-Y., Lacomme, P. and TraorE, M. K., 1996, An object-oriented simulation model using a multi-agent approach for the hoist scheduling problem. 22nd Conference of the ASU, Clermont-Ferrand, France, 15-17 July, pp. 115-125.
-
(1996)
22Nd Conference of the ASU
, pp. 115-125
-
-
Goujon, J.-Y.1
Lacomme, P.M.K.2
-
17
-
-
0004294299
-
An object oriented methodology for manufacturing systems modelling
-
Reno, Nevada, 27-30 July
-
Gourgand, M. and Kellert, P., 1992, An object oriented methodology for manufacturing systems modelling. The Proceedings of the 1992 Summer Computer Simulation Conference, Reno, Nevada, 27-30 July, pp. 1123-1128.
-
(1992)
The Proceedings of the 1992 Summer Computer Simulation Conference
, pp. 1123-1128
-
-
Gourgand, M.1
Kellert, P.2
-
19
-
-
0000737645
-
Object-oriented methodology for FMS modelling and simulation
-
Kellert, P., Tchernev, N. and Force, C., 1997, Object-oriented methodology for FMS modelling and simulation. International Journal of Computer Integrated Manufacturing, 10(6), 405-434.
-
(1997)
International Journal of Computer Integrated Manufacturing
, vol.10
, Issue.6
, pp. 405-434
-
-
Kellert, P.1
Tchernev, N.2
Force, C.3
-
20
-
-
85039616604
-
-
Montpellier, France
-
Lacomme, P. and TraorE, M. K., 1998, Modélisation et simulation du système d’information des ateliers de traitement de surfaces: modèle générique orienté objet et approche multi-agents, Inforsid (Montpellier, France), pp. 131-145.
-
(1998)
Modélisation Et Simulation Du système d’information Des Ateliers De Traitement De Surfaces: Modèle générique orienté Objet Et Approche Multi-Agents, Inforsid
, pp. 131-145
-
-
Lacomme, P.1
Traore, M.K.2
-
22
-
-
0000197379
-
A crane scheduling problem in a computer-integrated manufacturing environment
-
Matsuo, H., Shang, J. S. and Sullivan, R., 1991, A crane scheduling problem in a computer-integrated manufacturing environment. Management Science, 37 (5), 587-606.
-
(1991)
Management Science
, vol.37
, Issue.5
, pp. 587-606
-
-
Matsuo, H.1
Shang, J.S.2
Sullivan, R.3
-
23
-
-
0242326613
-
Une nouvelle approche de pilotage dynamique et en temps réel d’une cellule flexible d’usinage
-
Marseille, France
-
Najid, N. M., Castagna, P., Coeurdeuil, G. and Javel, G., 1993, Une nouvelle approche de pilotage dynamique et en temps réel d’une cellule flexible d’usinage. Fourth International Congress of Industrial Engineering, Marseille, France, pp. 127-133.
-
(1993)
Fourth International Congress of Industrial Engineering
, pp. 127-133
-
-
Najid, N.M.1
Castagna, P.2
Coeurdeuil, G.3
Javel, G.4
-
24
-
-
85023998040
-
-
1990, Systèmes temps réels: méthodes de spécification et de conception (Dunod)
-
Perez, J. P., 1990, Systèmes temps réels: méthodes de spécification et de conception (Dunod).
-
-
-
Perez, J.P.1
-
26
-
-
0016962332
-
Mathematical programming solution of a hoist scheduling program
-
Phillips, L. W. and Unger, P. S., 1976, Mathematical programming solution of a hoist scheduling program. AIIE Transactions, 219-225.
-
(1976)
AIIE Transactions
, pp. 219-225
-
-
Phillips, L.W.1
Unger, P.S.2
-
28
-
-
0040627070
-
A class of Petri net for manufacturing system integration
-
Proth, J. M., Wang, L. and Xie, X., 1993, A class of Petri net for manufacturing system integration. INRIA Research Report 2055.
-
(1993)
INRIA Research Report
, pp. 2055
-
-
Proth, J.M.1
Wang, L.2
Xie, X.3
-
31
-
-
70449891260
-
-
Lecture Notes in Computer Science, no. 674 (Springer)
-
Rozenberg, G., 1993, Advances in Petri nets. Lecture Notes in Computer Science, no. 674 (Springer).
-
(1993)
Advances in Petri Nets
-
-
Rozenberg, G.1
-
32
-
-
0003511049
-
-
Prentice Hall International Editions
-
Rumbaugh, J., Blaha, M., Premerlani, W., Eddy, F. and Lorensen, W., 1991, Object-oriented Modeling and Design (Prentice Hall International Editions).
-
(1991)
Object-Oriented Modeling and Design
-
-
Rumbaugh, J.1
Blaha, M.2
Premerlani, W.3
Eddy, F.4
Lorensen, W.5
-
38
-
-
0024861887
-
A top-down modular approach to synthesis of Petri net models for manufacturing systems
-
Scottsdale, AZ
-
Zhou, M., Dicesare, F. and Desrochers, A. A., 1989, A top-down modular approach to synthesis of Petri net models for manufacturing systems. Proceedings of IEEE Robotic and Automation Conference, Scottsdale, AZ, pp. 534-539.
-
(1989)
Proceedings of IEEE Robotic and Automation Conference
, pp. 534-539
-
-
Zhou, M.1
Dicesare, F.2
Desrochers, A.A.3
|