메뉴 건너뛰기




Volumn 41, Issue 8, 2003, Pages 1665-1687

Managing modular fixture elements with Tabu search in a Web-based environment

Author keywords

[No Author keywords available]

Indexed keywords

CLIENT SERVER COMPUTER SYSTEMS; COSTS; DATABASE SYSTEMS; JAVA PROGRAMMING LANGUAGE; MIDDLEWARE; PRODUCTION CONTROL; WORLD WIDE WEB;

EID: 0242333151     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/1352816031000075008     Document Type: Review
Times cited : (4)

References (14)
  • 1
    • 0033747895 scopus 로고    scopus 로고
    • Design of a tooling database implementation for an existing facility
    • ANUMOLU, B. and SHEWCHUK, J. P., 2000, Design of a tooling database implementation for an existing facility. Computers in Industry, 42, 221-229.
    • (2000) Computers in Industry , vol.42 , pp. 221-229
    • Anumolu, B.1    Shewchuk, J.P.2
  • 2
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: A review
    • BAKER, K. R. and SCUDDER, G. D., 1990, Sequencing with earliness and tardiness penalties: a review. Operations Research, 38, 22-36.
    • (1990) Operations Research , vol.38 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 3
    • 0032048384 scopus 로고    scopus 로고
    • Information models in an integrated fixture decision support tool
    • BUGTAI, N. and YOUNG, R. I. M., 1998, Information models in an integrated fixture decision support tool. Journal of Materials Processing Technology, 76, 29-35.
    • (1998) Journal of Materials Processing Technology , vol.76 , pp. 29-35
    • Bugtai, N.1    Young, R.I.M.2
  • 4
    • 0031234090 scopus 로고    scopus 로고
    • Scheduling stochastic jobs with asymmetric earliness and tardiness penalties
    • CAI, X. and ZHOU, S., 1997, Scheduling stochastic jobs with asymmetric earliness and tardiness penalties. Naval Research Logistics, 44, 531-557.
    • (1997) Naval Research Logistics , vol.44 , pp. 531-557
    • Cai, X.1    Zhou, S.2
  • 6
    • 0026835247 scopus 로고
    • Scheduling with earliness and tardiness penalties
    • FERRIS, M. C. and VLACH, M., 1992, Scheduling with earliness and tardiness penalties. Naval Research Logistics, 39, 229-245.
    • (1992) Naval Research Logistics , vol.39 , pp. 229-245
    • Ferris, M.C.1    Vlach, M.2
  • 7
    • 0022865373 scopus 로고
    • Future paths for integer programming and links to artificial intelligence
    • GLOVER, F., 1986, Future paths for integer programming and links to artificial intelligence. Computers and Operations Research, 13, 533-549.
    • (1986) Computers and Operations Research , vol.13 , pp. 533-549
    • Glover, F.1
  • 10
    • 0027591340 scopus 로고
    • A synthesis of decision models for tool management in automated manufacturing
    • GRAY, A. E., SEIDMANN, A. and STECKE, K. E., 1993, A synthesis of decision models for tool management in automated manufacturing. Management Science, 39, 549-567.
    • (1993) Management Science , vol.39 , pp. 549-567
    • Gray, A.E.1    Seidmann, A.2    Stecke, K.E.3
  • 11
    • 0242360203 scopus 로고    scopus 로고
    • A computer model for tool management information system
    • F. Plonka and G. Oiling (eds), London: Chapman & Hall
    • NARANG, R. V., 1997, A computer model for tool management information system. In F. Plonka and G. Oiling (eds), Computer Applications in Production and Engineering (London: Chapman & Hall), pp. 208-217.
    • (1997) Computer Applications in Production and Engineering , pp. 208-217
    • Narang, R.V.1
  • 12
    • 0242360200 scopus 로고
    • Model of clamping devices flow in small-scale shop-floor production
    • Vienna: IFAC
    • PERME, T. and NOE, D., 1994, Model of clamping devices flow in small-scale shop-floor production. In Intelligent Manufacturing Systems, IMS '94 (Vienna: IFAC), pp. 65-70.
    • (1994) Intelligent Manufacturing Systems, IMS '94 , pp. 65-70
    • Perme, T.1    Noe, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.