-
1
-
-
0033747895
-
Design of a tooling database implementation for an existing facility
-
ANUMOLU, B. and SHEWCHUK, J. P., 2000, Design of a tooling database implementation for an existing facility. Computers in Industry, 42, 221-229.
-
(2000)
Computers in Industry
, vol.42
, pp. 221-229
-
-
Anumolu, B.1
Shewchuk, J.P.2
-
2
-
-
0025211593
-
Sequencing with earliness and tardiness penalties: A review
-
BAKER, K. R. and SCUDDER, G. D., 1990, Sequencing with earliness and tardiness penalties: a review. Operations Research, 38, 22-36.
-
(1990)
Operations Research
, vol.38
, pp. 22-36
-
-
Baker, K.R.1
Scudder, G.D.2
-
3
-
-
0032048384
-
Information models in an integrated fixture decision support tool
-
BUGTAI, N. and YOUNG, R. I. M., 1998, Information models in an integrated fixture decision support tool. Journal of Materials Processing Technology, 76, 29-35.
-
(1998)
Journal of Materials Processing Technology
, vol.76
, pp. 29-35
-
-
Bugtai, N.1
Young, R.I.M.2
-
4
-
-
0031234090
-
Scheduling stochastic jobs with asymmetric earliness and tardiness penalties
-
CAI, X. and ZHOU, S., 1997, Scheduling stochastic jobs with asymmetric earliness and tardiness penalties. Naval Research Logistics, 44, 531-557.
-
(1997)
Naval Research Logistics
, vol.44
, pp. 531-557
-
-
Cai, X.1
Zhou, S.2
-
5
-
-
0242360204
-
Tool planning and control: A selected bibliography
-
CHEN, I. J., GUPTA, A. and CHUNG, C. H., 1993, Tool planning and control: a selected bibliography. Production and Inventory Management Journal, 34, 87-88.
-
(1993)
Production and Inventory Management Journal
, vol.34
, pp. 87-88
-
-
Chen, I.J.1
Gupta, A.2
Chung, C.H.3
-
6
-
-
0026835247
-
Scheduling with earliness and tardiness penalties
-
FERRIS, M. C. and VLACH, M., 1992, Scheduling with earliness and tardiness penalties. Naval Research Logistics, 39, 229-245.
-
(1992)
Naval Research Logistics
, vol.39
, pp. 229-245
-
-
Ferris, M.C.1
Vlach, M.2
-
7
-
-
0022865373
-
Future paths for integer programming and links to artificial intelligence
-
GLOVER, F., 1986, Future paths for integer programming and links to artificial intelligence. Computers and Operations Research, 13, 533-549.
-
(1986)
Computers and Operations Research
, vol.13
, pp. 533-549
-
-
Glover, F.1
-
9
-
-
0033325682
-
New advances for wedding simulation and optimization
-
GLOVER, F., KELLY, J. P. and LAGUNA, M., 1999, New advances for wedding simulation and optimization. Proceedings of the 1999 Winter Simulation Conference, pp. 255-260.
-
(1999)
Proceedings of the 1999 Winter Simulation Conference
, pp. 255-260
-
-
Glover, F.1
Kelly, J.P.2
Laguna, M.3
-
10
-
-
0027591340
-
A synthesis of decision models for tool management in automated manufacturing
-
GRAY, A. E., SEIDMANN, A. and STECKE, K. E., 1993, A synthesis of decision models for tool management in automated manufacturing. Management Science, 39, 549-567.
-
(1993)
Management Science
, vol.39
, pp. 549-567
-
-
Gray, A.E.1
Seidmann, A.2
Stecke, K.E.3
-
11
-
-
0242360203
-
A computer model for tool management information system
-
F. Plonka and G. Oiling (eds), London: Chapman & Hall
-
NARANG, R. V., 1997, A computer model for tool management information system. In F. Plonka and G. Oiling (eds), Computer Applications in Production and Engineering (London: Chapman & Hall), pp. 208-217.
-
(1997)
Computer Applications in Production and Engineering
, pp. 208-217
-
-
Narang, R.V.1
-
12
-
-
0242360200
-
Model of clamping devices flow in small-scale shop-floor production
-
Vienna: IFAC
-
PERME, T. and NOE, D., 1994, Model of clamping devices flow in small-scale shop-floor production. In Intelligent Manufacturing Systems, IMS '94 (Vienna: IFAC), pp. 65-70.
-
(1994)
Intelligent Manufacturing Systems, IMS '94
, pp. 65-70
-
-
Perme, T.1
Noe, D.2
-
13
-
-
0032598154
-
Development of a tool database management system
-
SUBRAHMANYAM, G., GUNASEKARAN, A., ARUNACHALAM, S. and RADHAKRISHNAN, P., 1999, Development of a tool database management system. International Journal of Advanced Manufacturing Technology, 15, 562-565.
-
(1999)
International Journal of Advanced Manufacturing Technology
, vol.15
, pp. 562-565
-
-
Subrahmanyam, G.1
Gunasekaran, A.2
Arunachalam, S.3
Radhakrishnan, P.4
-
14
-
-
34249836688
-
Cutting tool management in computer integrated manufacturing
-
VEERAMANI, D., UPTON, D. M. and BARASH, M. M., 1992, Cutting tool management in computer integrated manufacturing. International Journal of Flexible Manufacturing Systems, 3, 237-265.
-
(1992)
International Journal of Flexible Manufacturing Systems
, vol.3
, pp. 237-265
-
-
Veeramani, D.1
Upton, D.M.2
Barash, M.M.3
|