메뉴 건너뛰기




Volumn 41, Issue 14, 2003, Pages 3339-3357

Tool requirements planning in a flexible manufacturing system: Minimizing tool costs subject to a makespan constraint

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; COMPUTATIONAL METHODS; COMPUTER SIMULATION; HEURISTIC METHODS; ITERATIVE METHODS;

EID: 0242301640     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/0020754031000112824     Document Type: Article
Times cited : (10)

References (23)
  • 2
    • 0032649320 scopus 로고    scopus 로고
    • Experiences and issues in evaluating tool requirements using genetic algorithms
    • BRAGLIA, M. and ZAVANELLA, L., 1999, Experiences and issues in evaluating tool requirements using genetic algorithms. Production Planning and Control, 10, 340-358.
    • (1999) Production Planning and Control , vol.10 , pp. 340-358
    • Braglia, M.1    Zavanella, L.2
  • 3
    • 0008235709 scopus 로고
    • Planning tool requirements for flexible manufacturing systems
    • CHUNG, C. H., 1991, Planning tool requirements for flexible manufacturing systems. Journal of Manufacturing Systems, 10, 476-483.
    • (1991) Journal of Manufacturing Systems , vol.10 , pp. 476-483
    • Chung, C.H.1
  • 4
    • 0008195477 scopus 로고
    • PATHSIM, a modular simulator for an automatic tool handling system evaluation in FMS
    • CRITE, G. D., MILLS, R. I. and TALAVAGE, J. J., 1985, PATHSIM, a modular simulator for an automatic tool handling system evaluation in FMS. Journal of Manufacturing Systems, 4, 15-28.
    • (1985) Journal of Manufacturing Systems , vol.4 , pp. 15-28
    • Crite, G.D.1    Mills, R.I.2    Talavage, J.J.3
  • 5
    • 0004034817 scopus 로고
    • Great Barrington, MA: North River Press
    • GOLDRATT, E. M., 1990, Theory of Constraints (Great Barrington, MA: North River Press).
    • (1990) Theory of Constraints
    • Goldratt, E.M.1
  • 7
    • 0027591340 scopus 로고
    • A synthesis of decision models for tool management in automated manufacturing
    • GRAY, A. E., SEIDMANN, A. and STECKE, K. E., 1993, A synthesis of decision models for tool management in automated manufacturing. Management Science, 39, 549-567.
    • (1993) Management Science , vol.39 , pp. 549-567
    • Gray, A.E.1    Seidmann, A.2    Stecke, K.E.3
  • 9
    • 0028273650 scopus 로고
    • Performance analysis of a LIM-based high-speed tool delivery system for machining
    • HAHN, H. S. and SANDERS, J. L., 1994, Performance analysis of a LIM-based high-speed tool delivery system for machining. International Journal of Production Research, 32, 179-207.
    • (1994) International Journal of Production Research , vol.32 , pp. 179-207
    • Hahn, H.S.1    Sanders, J.L.2
  • 10
    • 0024716540 scopus 로고
    • Real-time tool control and job dispatching in flexible manufacturing systems
    • HAN, M.-H., NA, Y. K. and HOGG, G. L., 1989, Real-time tool control and job dispatching in flexible manufacturing systems. International Journal of Production Research, 27, 1257-1267.
    • (1989) International Journal of Production Research , vol.27 , pp. 1257-1267
    • Han, M.-H.1    Na, Y.K.2    Hogg, G.L.3
  • 11
    • 0032671434 scopus 로고    scopus 로고
    • Heuristics for a tool provisioning problem in a flexible manufacturing system with an automatic tool transporter
    • JUN, H.-B., KIM, Y.-D. and Sun, H.-W., 1999, Heuristics for a tool provisioning problem in a flexible manufacturing system with an automatic tool transporter. IEEE Transactions on Robotics and Automation, 15, 488-496.
    • (1999) IEEE Transactions on Robotics and Automation , vol.15 , pp. 488-496
    • Jun, H.-B.1    Kim, Y.-D.2    Sun, H.-W.3
  • 12
    • 0027543720 scopus 로고
    • A study on surrogate objectives for loading a certain type of flexible manufacturing systems
    • KIM, Y.-D., 1993, A study on surrogate objectives for loading a certain type of flexible manufacturing systems. International Journal of Production Research, 31, 381-392.
    • (1993) International Journal of Production Research , vol.31 , pp. 381-392
    • Kim, Y.-D.1
  • 13
    • 0027342202 scopus 로고
    • Heuristic approaches for loading problems in flexible manufacturing systems
    • KIM, Y.-D. and YANO, C. A., 1993, Heuristic approaches for loading problems in flexible manufacturing systems. IIE Transactions, 25, 26-39.
    • (1993) IIE Transactions , vol.25 , pp. 26-39
    • Kim, Y.-D.1    Yano, C.A.2
  • 14
    • 0035708657 scopus 로고    scopus 로고
    • Tool requirements planning in a flexible manufacturing system with an automatic tool transporter
    • KIM, Y.-D., LEE, G.-C., CHOI, S.-K. and LIM, S.-K., 2001, Tool requirements planning in a flexible manufacturing system with an automatic tool transporter. IEEE Transactions on Robotics and Automation, 17, 795-804.
    • (2001) IEEE Transactions on Robotics and Automation , vol.17 , pp. 795-804
    • Kim, Y.-D.1    Lee, G.-C.2    Choi, S.-K.3    Lim, S.-K.4
  • 16
    • 0034275636 scopus 로고    scopus 로고
    • A comparative study of three tool replacement/operation sequencing strategies in a flexible manufacturing system
    • LIU, P. H., 2000, A comparative study of three tool replacement/ operation sequencing strategies in a flexible manufacturing system. Naval Research Logistics, 47, 479-499.
    • (2000) Naval Research Logistics , vol.47 , pp. 479-499
    • Liu, P.H.1
  • 17
    • 0035371898 scopus 로고    scopus 로고
    • Scheduling of the optimal tool replacement times in a flexible manufacturing system
    • LIU, P. H., MAKIS, V. and JARDINE, A. K. S., 2001, Scheduling of the optimal tool replacement times in a flexible manufacturing system. IIE Transactions, 33, 487-496.
    • (2001) IIE Transactions , vol.33 , pp. 487-496
    • Liu, P.H.1    Makis, V.2    Jardine, A.K.S.3
  • 19
    • 0008229813 scopus 로고
    • A heuristic algorithm for tool loading and scheduling in flexible manufacturing system with an automatic tool transporter
    • PARK, S. S. and KIM, Y.-D., 1995, A heuristic algorithm for tool loading and scheduling in flexible manufacturing system with an automatic tool transporter. Journal of the Korean Institute of Industrial Engineers, 21, 119-135.
    • (1995) Journal of the Korean Institute of Industrial Engineers , vol.21 , pp. 119-135
    • Park, S.S.1    Kim, Y.-D.2
  • 20
    • 0020718128 scopus 로고
    • Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems
    • STECKE, K. E., 1983, Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems. Management Science, 29, 273-288.
    • (1983) Management Science , vol.29 , pp. 273-288
    • Stecke, K.E.1
  • 21
    • 0003348756 scopus 로고
    • Tooling strategies related to FMS management
    • TOMEK, P., 1986, Tooling strategies related to FMS management. FMS Magazine, 4, 102-107.
    • (1986) FMS Magazine , vol.4 , pp. 102-107
    • Tomek, P.1
  • 23
    • 0026880694 scopus 로고
    • Planning tool requirements for flexible manufacturing: An analytical approach
    • ZAVANELLA, L. and BUGINI, A., 1992, Planning tool requirements for flexible manufacturing: an analytical approach. International Journal of Production Research, 30, 1401-1414.
    • (1992) International Journal of Production Research , vol.30 , pp. 1401-1414
    • Zavanella, L.1    Bugini, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.