메뉴 건너뛰기




Volumn 36, Issue 6, 1998, Pages 1699-1713

Estimation of tool requirements in single-stage multimachine systems

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; FACTORY AUTOMATION; MACHINE TOOLS; MACHINING; PARAMETER ESTIMATION; PROCESS CONTROL; QUEUEING THEORY; RESOURCE ALLOCATION; SCHEDULING; STRATEGIC PLANNING; WEAR OF MATERIALS;

EID: 0032095740     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075498193237     Document Type: Article
Times cited : (10)

References (25)
  • 1
  • 2
    • 0008235709 scopus 로고
    • Planning tool requirements for flexible manufacturing systems
    • Chung, C.-H., 1991, Planning tool requirements for flexible manufacturing systems. Journal of Manufacturing Systems, 10 (6), 476-483.
    • (1991) Journal of Manufacturing Systems , vol.10 , Issue.6 , pp. 476-483
    • Chung, C.-H.1
  • 4
    • 0028273650 scopus 로고
    • Performance analysis of a LIM-based high-speed tool delivery system for machining
    • Hahn, H. S., and Sanders, J. L., 1994, Performance analysis of a LIM-based high-speed tool delivery system for machining. International Journal of Production Research, 32 (1), 179 207.
    • (1994) International Journal of Production Research , vol.32 , Issue.1 , pp. 179-207
    • Hahn, H.S.1    Sanders, J.L.2
  • 5
    • 0024716540 scopus 로고
    • Real-time tool control and job dispatching in flexible manufacturing systems
    • Han, M., Na, Y. K., and Hogg, G. L., 1989, Real-time tool control and job dispatching in flexible manufacturing systems. International Journal of Production Research, 27 (8), 1257-1267.
    • (1989) International Journal of Production Research , vol.27 , Issue.8 , pp. 1257-1267
    • Han, M.1    Na, Y.K.2    Hogg, G.L.3
  • 6
    • 0028079025 scopus 로고
    • Random manufacturing system: A new concept of manufacturing systems for production to order
    • Iwata, K., Onosato, M., and Koike, M., 1994, Random manufacturing system: a new concept of manufacturing systems for production to order. Annals of the CIRP, 43, 379-383.
    • (1994) Annals of the CIRP , vol.43 , pp. 379-383
    • Iwata, K.1    Onosato, M.2    Koike, M.3
  • 8
    • 0027928107 scopus 로고
    • Intermediate tool requirement planning for FMS
    • Khator, S. K., and Leung, L. C., 1994, Intermediate tool requirement planning for FMS. Journal of Manufacturing Systems, 13 (1), 9-19.
    • (1994) Journal of Manufacturing Systems , vol.13 , Issue.1 , pp. 9-19
    • Khator, S.K.1    Leung, L.C.2
  • 10
    • 0026111156 scopus 로고
    • Total tool requirements in multi-level machining systems
    • Koulamas, C. P. 1991, Total tool requirements in multi-level machining systems. International Journal of Production Research, 29 (2), 417-437.
    • (1991) International Journal of Production Research , vol.29 , Issue.2 , pp. 417-437
    • Koulamas, C.P.1
  • 11
    • 3342903522 scopus 로고
    • Tool management seen as a source of cost savings
    • May 29-30
    • Laviolette, B. E., 1994, Tool management seen as a source of cost savings. American Machinist, May 29-30.
    • (1994) American Machinist
    • Laviolette, B.E.1
  • 13
    • 3342886217 scopus 로고
    • A simulation approach to analysing tool requirements for flexible machining installations
    • Delft, The Netherlands
    • Newman, S. T., Jiao, H., Rahimifard, S., Roberts, E. A., and Shires, N., 1993, A simulation approach to analysing tool requirements for flexible machining installations. Proceedings of the 1993 European Symposium, Delft, The Netherlands, pp. 763-766.
    • (1993) Proceedings of the 1993 European Symposium , pp. 763-766
    • Newman, S.T.1    Jiao, H.2    Rahimifard, S.3    Roberts, E.A.4    Shires, N.5
  • 17
    • 0006511103 scopus 로고
    • Heuristic algorithm for the tool movement policy in flexible manufacturing systems
    • Song, C.-Y., Hwang, H., and Kim, Y.-D., 1995, Heuristic algorithm for the tool movement policy in flexible manufacturing systems. Journal of Manufacturing Systems, 14 (3), 160-168.
    • (1995) Journal of Manufacturing Systems , vol.14 , Issue.3 , pp. 160-168
    • Song, C.-Y.1    Hwang, H.2    Kim, Y.-D.3
  • 20
    • 0027574154 scopus 로고
    • Tool requirement planning in stochastic job shops: A simulated annealing approach
    • Wang, J., Yang, J., and Gargeya, V. B., 1993, Tool requirement planning in stochastic job shops: a simulated annealing approach. Computers and Industrial Engineering, 24 (2), 429-465.
    • (1993) Computers and Industrial Engineering , vol.24 , Issue.2 , pp. 429-465
    • Wang, J.1    Yang, J.2    Gargeya, V.B.3
  • 22
    • 3343017423 scopus 로고
    • Scheduling a flexible manufacturing system with dynamic tool movement
    • Webster, S., and Jacobs, F. R., 1993, Scheduling a flexible manufacturing system with dynamic tool movement. Production and Operation Management, 2 (1), 38-54.
    • (1993) Production and Operation Management , vol.2 , Issue.1 , pp. 38-54
    • Webster, S.1    Jacobs, F.R.2
  • 23
    • 0020848139 scopus 로고
    • The queueing network analyzer
    • Whitt, W., 1983, The queueing network analyzer. The Bell System Technical Journal, 62 (9), 2779-2815.
    • (1983) The Bell System Technical Journal , vol.62 , Issue.9 , pp. 2779-2815
    • Whitt, W.1
  • 25
    • 0026880694 scopus 로고
    • Planning tool requirements for flexible manufacturing: An analytical approach
    • Zavanella, L., and Bugini, A., 1992, Planning tool requirements for flexible manufacturing: an analytical approach. International Journal of Production Research, 30 (6), 1401-1414.
    • (1992) International Journal of Production Research , vol.30 , Issue.6 , pp. 1401-1414
    • Zavanella, L.1    Bugini, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.