-
1
-
-
0000312362
-
Scheduling and control of flexible manufacturing systems: A critical review
-
Basnet, C., and Mize, J. H., 1994, Scheduling and control of flexible manufacturing systems: a critical review. International Journal of Computer Integrated Manufacturing, 7 (6), 340-355.
-
(1994)
International Journal of Computer Integrated Manufacturing
, vol.7
, Issue.6
, pp. 340-355
-
-
Basnet, C.1
Mize, J.H.2
-
2
-
-
0008235709
-
Planning tool requirements for flexible manufacturing systems
-
Chung, C.-H., 1991, Planning tool requirements for flexible manufacturing systems. Journal of Manufacturing Systems, 10 (6), 476-483.
-
(1991)
Journal of Manufacturing Systems
, vol.10
, Issue.6
, pp. 476-483
-
-
Chung, C.-H.1
-
3
-
-
0000329136
-
Simulation of tool and part flow in FMS
-
Grieco, A., Semeraro, Q., Tolio, T., and Toma, S., 1995, Simulation of tool and part flow in FMS. International Journal of Production Research, 33 (3), 643-658.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.3
, pp. 643-658
-
-
Grieco, A.1
Semeraro, Q.2
Tolio, T.3
Toma, S.4
-
4
-
-
0028273650
-
Performance analysis of a LIM-based high-speed tool delivery system for machining
-
Hahn, H. S., and Sanders, J. L., 1994, Performance analysis of a LIM-based high-speed tool delivery system for machining. International Journal of Production Research, 32 (1), 179 207.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.1
, pp. 179-207
-
-
Hahn, H.S.1
Sanders, J.L.2
-
5
-
-
0024716540
-
Real-time tool control and job dispatching in flexible manufacturing systems
-
Han, M., Na, Y. K., and Hogg, G. L., 1989, Real-time tool control and job dispatching in flexible manufacturing systems. International Journal of Production Research, 27 (8), 1257-1267.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.8
, pp. 1257-1267
-
-
Han, M.1
Na, Y.K.2
Hogg, G.L.3
-
6
-
-
0028079025
-
Random manufacturing system: A new concept of manufacturing systems for production to order
-
Iwata, K., Onosato, M., and Koike, M., 1994, Random manufacturing system: a new concept of manufacturing systems for production to order. Annals of the CIRP, 43, 379-383.
-
(1994)
Annals of the CIRP
, vol.43
, pp. 379-383
-
-
Iwata, K.1
Onosato, M.2
Koike, M.3
-
7
-
-
0002381339
-
A production planning framework for flexible manufacturing systems
-
Jaikumar, R., and Van Wassenhove, L. N., 1989, A production planning framework for flexible manufacturing systems. Journal of Manufacturing and Operations Management, 2 (1), 52-79.
-
(1989)
Journal of Manufacturing and Operations Management
, vol.2
, Issue.1
, pp. 52-79
-
-
Jaikumar, R.1
Van Wassenhove, L.N.2
-
8
-
-
0027928107
-
Intermediate tool requirement planning for FMS
-
Khator, S. K., and Leung, L. C., 1994, Intermediate tool requirement planning for FMS. Journal of Manufacturing Systems, 13 (1), 9-19.
-
(1994)
Journal of Manufacturing Systems
, vol.13
, Issue.1
, pp. 9-19
-
-
Khator, S.K.1
Leung, L.C.2
-
9
-
-
3342893061
-
-
Technical report, The School of Industrial Engineering, Purdue University, USA
-
Koo, P.-H., and Tanchoco, J. M. A., 1996, Non-hierarchical shop floor control in a singlestage multifunctional manufacturing system. Technical report, The School of Industrial Engineering, Purdue University, USA.
-
(1996)
Non-Hierarchical Shop Floor Control in a Singlestage Multifunctional Manufacturing System.
-
-
Koo, P.-H.1
Tanchoco, J.M.A.2
-
10
-
-
0026111156
-
Total tool requirements in multi-level machining systems
-
Koulamas, C. P. 1991, Total tool requirements in multi-level machining systems. International Journal of Production Research, 29 (2), 417-437.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.2
, pp. 417-437
-
-
Koulamas, C.P.1
-
11
-
-
3342903522
-
Tool management seen as a source of cost savings
-
May 29-30
-
Laviolette, B. E., 1994, Tool management seen as a source of cost savings. American Machinist, May 29-30.
-
(1994)
American Machinist
-
-
Laviolette, B.E.1
-
13
-
-
3342886217
-
A simulation approach to analysing tool requirements for flexible machining installations
-
Delft, The Netherlands
-
Newman, S. T., Jiao, H., Rahimifard, S., Roberts, E. A., and Shires, N., 1993, A simulation approach to analysing tool requirements for flexible machining installations. Proceedings of the 1993 European Symposium, Delft, The Netherlands, pp. 763-766.
-
(1993)
Proceedings of the 1993 European Symposium
, pp. 763-766
-
-
Newman, S.T.1
Jiao, H.2
Rahimifard, S.3
Roberts, E.A.4
Shires, N.5
-
14
-
-
3343010487
-
-
Working paper 481c, The University of Michigan, USA
-
Rachamadugu, R., and Stecke, K. E., 1989, Classification and review of FMS scheduling procedures. Working paper 481c, The University of Michigan, USA.
-
(1989)
Classification and Review of FMS Scheduling Procedures.
-
-
Rachamadugu, R.1
Stecke, K.E.2
-
16
-
-
84952242850
-
Open queueing network models of dynamic job shops
-
Shanthikumar, J. G., and Buzacott, J. A., 1981, Open queueing network models of dynamic job shops. International Journal of Production Research, 19 (3), 255-266.
-
(1981)
International Journal of Production Research
, vol.19
, Issue.3
, pp. 255-266
-
-
Shanthikumar, J.G.1
Buzacott, J.A.2
-
17
-
-
0006511103
-
Heuristic algorithm for the tool movement policy in flexible manufacturing systems
-
Song, C.-Y., Hwang, H., and Kim, Y.-D., 1995, Heuristic algorithm for the tool movement policy in flexible manufacturing systems. Journal of Manufacturing Systems, 14 (3), 160-168.
-
(1995)
Journal of Manufacturing Systems
, vol.14
, Issue.3
, pp. 160-168
-
-
Song, C.-Y.1
Hwang, H.2
Kim, Y.-D.3
-
18
-
-
0002725091
-
Architectures and auctions in manufacturing
-
Upton, D. M., Barash, M. M., and Matheson, A. M., 1991, Architectures and auctions in manufacturing. International Journal of Computer-Integrated Manufacturing, 4 (1), 2333.
-
(1991)
International Journal of Computer-Integrated Manufacturing
, vol.4
, Issue.1
, pp. 2333
-
-
Upton, D.M.1
Barash, M.M.2
Matheson, A.M.3
-
19
-
-
0027591270
-
Information system architecture for heterarchical control of large FMSs
-
Veeramani, D., Bhargava, B., and Barash, M. M., 1993, Information system architecture for heterarchical control of large FMSs. Computer Integrated Manufacturing Systems, 6 (2), 76-92.
-
(1993)
Computer Integrated Manufacturing Systems
, vol.6
, Issue.2
, pp. 76-92
-
-
Veeramani, D.1
Bhargava, B.2
Barash, M.M.3
-
20
-
-
0027574154
-
Tool requirement planning in stochastic job shops: A simulated annealing approach
-
Wang, J., Yang, J., and Gargeya, V. B., 1993, Tool requirement planning in stochastic job shops: a simulated annealing approach. Computers and Industrial Engineering, 24 (2), 429-465.
-
(1993)
Computers and Industrial Engineering
, vol.24
, Issue.2
, pp. 429-465
-
-
Wang, J.1
Yang, J.2
Gargeya, V.B.3
-
22
-
-
3343017423
-
Scheduling a flexible manufacturing system with dynamic tool movement
-
Webster, S., and Jacobs, F. R., 1993, Scheduling a flexible manufacturing system with dynamic tool movement. Production and Operation Management, 2 (1), 38-54.
-
(1993)
Production and Operation Management
, vol.2
, Issue.1
, pp. 38-54
-
-
Webster, S.1
Jacobs, F.R.2
-
23
-
-
0020848139
-
The queueing network analyzer
-
Whitt, W., 1983, The queueing network analyzer. The Bell System Technical Journal, 62 (9), 2779-2815.
-
(1983)
The Bell System Technical Journal
, vol.62
, Issue.9
, pp. 2779-2815
-
-
Whitt, W.1
-
24
-
-
3342887902
-
-
PhD thesis, School of Industrial Engineering, Purdue University, USA
-
Yang, E.-H., 1994, Investigation of dynamic job allocation methods for computerized manufacturing systems with priority and due date consideration. PhD thesis, School of Industrial Engineering, Purdue University, USA.
-
(1994)
Investigation of Dynamic Job Allocation Methods for Computerized Manufacturing Systems with Priority and Due Date Consideration.
-
-
Yang, E.-H.1
-
25
-
-
0026880694
-
Planning tool requirements for flexible manufacturing: An analytical approach
-
Zavanella, L., and Bugini, A., 1992, Planning tool requirements for flexible manufacturing: an analytical approach. International Journal of Production Research, 30 (6), 1401-1414.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.6
, pp. 1401-1414
-
-
Zavanella, L.1
Bugini, A.2
|