메뉴 건너뛰기




Volumn 41, Issue 3, 2003, Pages 449-463

Workforce planning and allocation for mid-volume truck manufacturing: A case study

Author keywords

[No Author keywords available]

Indexed keywords

ASSEMBLY; COSTS; GENETIC ALGORITHMS; TRUCKS;

EID: 0242301543     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540210162974     Document Type: Article
Times cited : (15)

References (12)
  • 3
    • 0028439141 scopus 로고
    • Sequencing jobs on an automobile assembly line: Objectives and procedures
    • BOLAT, A., 1994, Sequencing jobs on an automobile assembly line: objectives and procedures. International journal of Production Research, 32, pp. 1219-1236.
    • (1994) International Journal of Production Research , vol.32 , pp. 1219-1236
    • Bolat, A.1
  • 4
    • 0027627041 scopus 로고
    • Capacity smoothing and sequencing for mixed-model lines
    • DECKER M., 1993, Capacity smoothing and sequencing for mixed-model lines, Internation Journal of Production Economics, 30-21, 31-42.
    • (1993) Internation Journal of Production Economics , vol.30 , Issue.21 , pp. 31-42
    • Decker, M.1
  • 5
    • 0032143247 scopus 로고    scopus 로고
    • Mixed-model assembly line sequencing heuristics for smoothing component parts usage: A comparative analysis
    • DUPLAGA, E. and BRAGG, D., 1998, Mixed-model assembly line sequencing heuristics for smoothing component parts usage: a comparative analysis. International Journal of Production Research, 36, 2209-2224.
    • (1998) International Journal of Production Research , vol.36 , pp. 2209-2224
    • Duplaga, E.1    Bragg, D.2
  • 6
    • 0024641634 scopus 로고
    • A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
    • GHOSH, S. and GAGNON, R. J., 1989, A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. International Journal of Production Research, 27, 637-670.
    • (1989) International Journal of Production Research , vol.27 , pp. 637-670
    • Ghosh, S.1    Gagnon, R.J.2
  • 8
    • 0032120699 scopus 로고    scopus 로고
    • A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines
    • HYUN, C. J., KIM, Y., and KIM, Y. K., 1998, A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines, Computers in Operations Research, 25, 675-690.
    • (1998) Computers in Operations Research , vol.25 , pp. 675-690
    • Hyun, C.J.1    Kim, Y.2    Kim, Y.K.3
  • 9
    • 0031193169 scopus 로고    scopus 로고
    • Workforce planning in mixed model assembly systems
    • LEE, C., and VAIRAKTARAKIS, G. L., 1997, Workforce planning in mixed model assembly systems, Operations Research, 45, 553-567.
    • (1997) Operations Research , vol.45 , pp. 553-567
    • Lee, C.1    Vairaktarakis, G.L.2
  • 12
    • 0000298775 scopus 로고
    • Sequencing to minimize work overload in assembly lines with product options
    • YANO, C and RACHAMADUGU, R., 1991, Sequencing to minimize work overload in assembly lines with product options. Management Science, 37, 572-586.
    • (1991) Management Science , vol.37 , pp. 572-586
    • Yano, C.1    Rachamadugu, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.