-
2
-
-
0142060912
-
Time gap measurement using CAMDAS
-
Chin, H.C., Lim, K.B., and Wang, Z. (2002). Time gap measurement using CAMDAS, ARRB Journal of Road & Transport Research, 11(1), pp.34-42.
-
(2002)
ARRB Journal of Road & Transport Research
, vol.11
, Issue.1
, pp. 34-42
-
-
Chin, H.C.1
Lim, K.B.2
Wang, Z.3
-
3
-
-
0020812204
-
Deceleration of major-road vehicles approaching a T-Junction
-
Chrissikopoulos, V., Darzentas, J. and McDowell, M.R.C. (1983). Deceleration of major-road vehicles approaching a T-Junction, Traffic Engineering & Control, 24(9), pp.433-36.
-
(1983)
Traffic Engineering & Control
, vol.24
, Issue.9
, pp. 433-436
-
-
Chrissikopoulos, V.1
Darzentas, J.2
McDowell, M.R.C.3
-
4
-
-
0009713678
-
Traffic studies at T-junctions: 1. The effect of approach speed on merging gap acceptance
-
Cooper, D.F., Smith, W., and Broadie, V. (1976). Traffic studies at T-junctions: 1. The effect of approach speed on merging gap acceptance, Traffic Engineering & Control, 17(6), pp.256-57.
-
(1976)
Traffic Engineering & Control
, vol.17
, Issue.6
, pp. 256-257
-
-
Cooper, D.F.1
Smith, W.2
Broadie, V.3
-
5
-
-
0009909568
-
Traffic studies at T-Junctions:4. The effect of speed on gap acceptance and conflict rate
-
Cooper, D.F.; Storr, P.A. and Wennell, J. (1997). Traffic studies at T-Junctions:4. The effect of speed on gap acceptance and conflict rate, Traffic Engineering & Control, 18(3), pp.110-12.
-
(1977)
Traffic Engineering & Control
, vol.18
, Issue.3
, pp. 110-112
-
-
Cooper, D.F.1
Storr, P.A.2
Wennell, J.3
-
6
-
-
0020748030
-
Gap acceptance characteristics at unsignalized urban intersections
-
Polus, A. (1983). Gap acceptance characteristics at unsignalized urban intersections, Traffic Engineering & Control, 24(5), pp.255-58.
-
(1983)
Traffic Engineering & Control
, vol.24
, Issue.5
, pp. 255-258
-
-
Polus, A.1
-
7
-
-
4243451627
-
Gap acceptance study using video image processing
-
Master Thesis, Department of Civil Engineering, National University of Singapore
-
Wang, Z. (1998). Gap acceptance study using video image processing. Master Thesis, Department of Civil Engineering, National University of Singapore.
-
(1998)
-
-
Wang, Z.1
-
8
-
-
0142114253
-
Projected time gap: A new look at driver behaviour at junctions
-
Nov.
-
Wang, Z. (1999) Projected time gap: A new look at driver behaviour at junctions, Journal of Traffic Engineering & Control, Nov., pp.542-45.
-
(1999)
Journal of Traffic Engineering & Control
, pp. 542-545
-
-
Wang, Z.1
-
9
-
-
0034498899
-
The effects of reference line positioning on gap acceptance data
-
December
-
Wang, Z. (2000). The effects of reference line positioning on gap acceptance data. ARRB Journal of Road & Transport Research, Vol. 9, No. 4, December, pp.20-28
-
(2000)
ARRB Journal of Road & Transport Research
, vol.9
, Issue.4
, pp. 20-28
-
-
Wang, Z.1
|