메뉴 건너뛰기




Volumn 11, Issue 1, 2002, Pages 34-42

Time gap measurement using CAMDAS

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SOFTWARE; IMAGE PROCESSING; PHOTOGRAPHY; ROADS AND STREETS; VIDEO RECORDING;

EID: 0142060912     PISSN: 10375783     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (2)

References (24)
  • 1
  • 3
    • 0025433142 scopus 로고
    • Influence of stopped delay on driver gap acceptance behaviour
    • Adebisi, O. and Sama, G.N. (1989). Influence of stopped delay on driver gap acceptance behaviour, ASCE Journal of Transportation Engineering, 115(3), 305-315.
    • (1989) ASCE Journal of Transportation Engineering , vol.115 , Issue.3 , pp. 305-315
    • Adebisi, O.1    Sama, G.N.2
  • 4
    • 0041663347 scopus 로고
    • Gap acceptance at an uncontrolled intersection
    • Ashworth, R. and Green, B.D. (1966). Gap acceptance at an uncontrolled intersection, Traffic Engineering and Control, 7(3), 676-678.
    • (1966) Traffic Engineering and Control , vol.7 , Issue.3 , pp. 676-678
    • Ashworth, R.1    Green, B.D.2
  • 5
    • 0142082389 scopus 로고
    • CAMDAS - ARRB video vehicle detector, user reference manual, version 1.5
    • Australian Road Research Board; Australia
    • Australian Road Research Board, (1992). CAMDAS - ARRB video vehicle detector, user reference manual, version 1.5©, Australian Road Research Board Limited Australia.
    • (1992) Australian Road Research Board Limited
  • 6
    • 0009713678 scopus 로고
    • Traffic studies at T-junctions: 1. The effect of approach speed on merging gap acceptance
    • Cooper, D.F., Smith, W. and Broadie, V. (1976). Traffic studies at T-junctions: 1. The effect of approach speed on merging gap acceptance. Traffic Engineering and Control, 17(6), 256-257.
    • (1976) Traffic Engineering and Control , vol.17 , Issue.6 , pp. 256-257
    • Cooper, D.F.1    Smith, W.2    Broadie, V.3
  • 8
    • 0014301511 scopus 로고
    • Driver gap acceptance at intersections
    • Gibbs, W.L. (1968). Driver gap acceptance at intersections, Journal of Applied Psychology, 52(3), 200-204.
    • (1968) Journal of Applied Psychology , vol.52 , Issue.3 , pp. 200-204
    • Gibbs, W.L.1
  • 13
    • 0040623070 scopus 로고
    • A probabilistic model of gap acceptance behaviour
    • Transportation Research Record 795. Transportation Research Board, Washington DC
    • Maze, T.H. (1981). A probabilistic model of gap acceptance behaviour, Transportation Research Record 795. Transportation Research Board, Washington DC, pp.8-13.
    • (1981) , pp. 8-13
    • Maze, T.H.1
  • 14
    • 0003504068 scopus 로고
    • Computer image processing in traffic engineering
    • John Wiley & Sons, New York
    • Noose, N. (1991). Computer image processing in traffic engineering, John Wiley & Sons, New York.
    • (1991)
    • Noose, N.1
  • 15
    • 0028429812 scopus 로고
    • Neural network for gap acceptance stop-controlled intersections
    • Pant, P.D. and Balakrishnan, P. (1994). Neural network for gap acceptance stop-controlled intersections, ASCE Journal of Transportation Engineering, 120(3), 432-446.
    • (1994) ASCE Journal of Transportation Engineering , vol.120 , Issue.3 , pp. 432-446
    • Pant, P.D.1    Balakrishnan, P.2
  • 16
    • 0020748030 scopus 로고
    • Gap acceptance characteristics at unsignalised urban intersections
    • Polus, A. (1983). Gap acceptance characteristics at unsignalised urban intersections, Traffic Engineering and Control, 24(5), 255-258.
    • (1983) Traffic Engineering and Control , vol.24 , Issue.5 , pp. 255-258
    • Polus, A.1
  • 17
    • 0018995182 scopus 로고
    • Gap acceptance and delay at stop-controlled intersections on multi-lane divided highways
    • Radwan, E.A. and Sinha, K.C. (1980), Gap acceptance and delay at stop-controlled intersections on multi-lane divided highways, ITE Journal, 50(3), 38-44.
    • (1980) ITE Journal , vol.50 , Issue.3 , pp. 38-44
    • Radwan, E.A.1    Sinha, K.C.2
  • 18
    • 0004174320 scopus 로고
    • A volume warrant for urban stop signs
    • Eno Foundation for Highway Traffic Control, Saugatuck, Connecticut
    • Raff, M.S. and Hart, J.W. (1950). A volume warrant for urban stop signs, Eno Foundation for Highway Traffic Control, Saugatuck, Connecticut.
    • (1950)
    • Raff, M.S.1    Hart, J.W.2
  • 19
  • 20
    • 0009331766 scopus 로고    scopus 로고
    • Gap acceptance behaviour - Aggregate and logit perspectives: Part 1
    • Teply, S., Abou-Henaidy, M.I. and Hunt, J.D. (1997) Gap acceptance behaviour - aggregate and logit perspectives: Part 1, Traffic Engineering and Control, 38(9), 474-482.
    • (1997) Traffic Engineering and Control , vol.38 , Issue.9 , pp. 474-482
    • Teply, S.1    Abou-Henaidy, M.I.2    Hunt, J.D.3
  • 21
    • 0009331766 scopus 로고    scopus 로고
    • Gap acceptance behaviour - Aggregate and logit perspectives: Part 2
    • Teply, S., Abou-Henaidy, M.I. and Hunt, J.D. (1997). Gap acceptance behaviour - aggregate and logit perspectives: Part 2, Traffic Engineering and Control, 38(10), 540-544.
    • (1997) Traffic Engineering and Control , vol.38 , Issue.10 , pp. 540-544
    • Teply, S.1    Abou-Henaidy, M.I.2    Hunt, J.D.3
  • 22
    • 0009931312 scopus 로고
    • Comparison of day and night gap-acceptance probabilities
    • Tsongos, N.G. and Weiner, S. (1969). Comparison of day and night gap-acceptance probabilities. Public Roads, 35(7), 157-165.
    • (1969) Public Roads , vol.35 , Issue.7 , pp. 157-165
    • Tsongos, N.G.1    Weiner, S.2
  • 23
    • 0017960191 scopus 로고
    • Start-up times and queue acceptance of large gaps at T-junctions
    • Uber, C. B. (1978). Start-up times and queue acceptance of large gaps at T-junctions, Traffic Engineering and Control, 19(4), 174-177.
    • (1978) Traffic Engineering and Control , vol.19 , Issue.4 , pp. 174-177
    • Uber, C.B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.