메뉴 건너뛰기




Volumn 50, Issue 6, 2003, Pages 650-661

Scheduling Economic Lot Sizes in Deteriorating Production Systems

Author keywords

ELSP; Imperfect production processes; Maintenance

Indexed keywords

AGING OF MATERIALS; COSTS; FAILURE (MECHANICAL); PREVENTIVE MAINTENANCE; PROBLEM SOLVING;

EID: 0141494258     PISSN: 0894069X     EISSN: None     Source Type: Journal    
DOI: 10.1002/nav.10082     Document Type: Article
Times cited : (24)

References (33)
  • 1
    • 0025699539 scopus 로고
    • Production rate planning for two products sharing a single process facility: A real world case study
    • S.J. Allen, Production rate planning for two products sharing a single process facility: A real world case study, Prod Inventory Manage 31 (1990), 24-29.
    • (1990) Prod Inventory Manage , vol.31 , pp. 24-29
    • Allen, S.J.1
  • 2
    • 0034228553 scopus 로고    scopus 로고
    • Economic lot scheduling problem with imperfect production processes
    • M. Ben-Daya and M. Hariga, Economic lot scheduling problem with imperfect production processes, J Oper Res Soc 51 (2000), 875-881.
    • (2000) J Oper Res Soc , vol.51 , pp. 875-881
    • Ben-Daya, M.1    Hariga, M.2
  • 3
    • 0023306717 scopus 로고
    • The G-group heuristic for single machine lot scheduling
    • F. Boctor, The G-group heuristic for single machine lot scheduling, Int J Prod Res 25 (1987), 363-379.
    • (1987) Int J Prod Res , vol.25 , pp. 363-379
    • Boctor, F.1
  • 4
    • 0017505335 scopus 로고
    • Lot sizing and sequencing for N products on one facility
    • C. Delporte and L. Thomas, Lot sizing and sequencing for N products on one facility, Manage Sci 23 (1978), 1070-1079.
    • (1978) Manage Sci , vol.23 , pp. 1070-1079
    • Delporte, C.1    Thomas, L.2
  • 5
    • 0023420909 scopus 로고
    • The economic lot scheduling problem: Achieving feasibility using time-varying lot sizes
    • G. Dobson, The economic lot scheduling problem: achieving feasibility using time-varying lot sizes, Oper Res 35 (1987), 764-771.
    • (1987) Oper Res , vol.35 , pp. 764-771
    • Dobson, G.1
  • 6
    • 0017931081 scopus 로고
    • The economic lot scheduling problem: Reviews and extensions
    • S. Elmaghraby, The economic lot scheduling problem: Reviews and extensions, Manage Sci 24 (1978), 587-598.
    • (1978) Manage Sci , vol.24 , pp. 587-598
    • Elmaghraby, S.1
  • 8
    • 0025445230 scopus 로고
    • An extension to the class of easy economic lot scheduling problem
    • G. Gallego, An extension to the class of easy economic lot scheduling problem, IIE Trans 22 (1990), 189-190.
    • (1990) IIE Trans , vol.22 , pp. 189-190
    • Gallego, G.1
  • 9
    • 0027594688 scopus 로고
    • Reduced production rates in the economic lot scheduling problem
    • G. Gallego, Reduced production rates in the economic lot scheduling problem, Int J Prod Res 31 (1993), 1035-1046.
    • (1993) Int J Prod Res , vol.31 , pp. 1035-1046
    • Gallego, G.1
  • 10
    • 85010624319 scopus 로고
    • The effect of externalizing setups in the economic lot scheduling problem
    • G. Gallego and I. Moon, The effect of externalizing setups in the economic lot scheduling problem, Oper Res 40 (1992), 614-619.
    • (1992) Oper Res , vol.40 , pp. 614-619
    • Gallego, G.1    Moon, I.2
  • 11
    • 0029357736 scopus 로고
    • Strategic investment to reduce setup times in the economic lot scheduling problem
    • G. Gallego and I. Moon, Strategic investment to reduce setup times in the economic lot scheduling problem, Nav Res Logistics 42 (1995), 773-790.
    • (1995) Nav Res Logistics , vol.42 , pp. 773-790
    • Gallego, G.1    Moon, I.2
  • 12
    • 84989742214 scopus 로고
    • The extended economic lot scheduling problem
    • G. Gallego and R. Roundy, The extended economic lot scheduling problem, Nav Res Logistics 39 (1992), 729-829.
    • (1992) Nav Res Logistics , vol.39 , pp. 729-829
    • Gallego, G.1    Roundy, R.2
  • 13
    • 0031069125 scopus 로고    scopus 로고
    • Complexity of the ELSP with general cyclic schedules
    • G. Gallego and X. Shaw, Complexity of the ELSP with general cyclic schedules, IIE Trans 29 (1997), 109-113.
    • (1997) IIE Trans , vol.29 , pp. 109-113
    • Gallego, G.1    Shaw, X.2
  • 14
    • 0000380895 scopus 로고
    • A note on the single-machine multi-product lot scheduling problem
    • R.W. Haessler and S.L. Hogue, A note on the single-machine multi-product lot scheduling problem, Manage Sci 22 (1976), 909-912.
    • (1976) Manage Sci , vol.22 , pp. 909-912
    • Haessler, R.W.1    Hogue, S.L.2
  • 16
    • 0032096710 scopus 로고    scopus 로고
    • The economic manufacturing lot-sizing problem with imperfect manufacturing processes: Bounds and optimal solutions
    • M. Hariga and M. Ben-Daya, The economic manufacturing lot-sizing problem with imperfect manufacturing processes: Bounds and optimal solutions, Nav Res Logistics 45 (1998), 423-433.
    • (1998) Nav Res Logistics , vol.45 , pp. 423-433
    • Hariga, M.1    Ben-Daya, M.2
  • 17
    • 0020587837 scopus 로고
    • On the general feasibility test for scheduling lot sizes for several products in one machine
    • W. Hsu, On the general feasibility test for scheduling lot sizes for several products in one machine, Manage Sci 29 (1983), 93-105.
    • (1983) Manage Sci , vol.29 , pp. 93-105
    • Hsu, W.1
  • 18
    • 0027560761 scopus 로고
    • Multiproduct economic lot size models with investment costs for setup reduction and quality improvement
    • H. Hwang, D. Kim, and Y. Kim, Multiproduct economic lot size models with investment costs for setup reduction and quality improvement, Int J Prod Res 31 (1993), 691-703.
    • (1993) Int J Prod Res , vol.31 , pp. 691-703
    • Hwang, H.1    Kim, D.2    Kim, Y.3
  • 19
    • 0024619851 scopus 로고
    • When the economic lot scheduling problem easy?
    • P. Jones and R. Inman, When the economic lot scheduling problem easy? IIE Trans 21 (1989), 11-20.
    • (1989) IIE Trans , vol.21 , pp. 11-20
    • Jones, P.1    Inman, R.2
  • 20
    • 0030734428 scopus 로고    scopus 로고
    • The economic lot scheduling problem under volume flexibility
    • M. Khouja, The economic lot scheduling problem under volume flexibility, Int J Prod Econ 48 (1997), 73-86.
    • (1997) Int J Prod Econ , vol.48 , pp. 73-86
    • Khouja, M.1
  • 21
    • 0033225735 scopus 로고    scopus 로고
    • A note on deliberately slowing down output in a family production context
    • M. Khouja, A note on deliberately slowing down output in a family production context, Int J Prod Res 37 (1999), 4067-4077.
    • (1999) Int J Prod Res , vol.37 , pp. 4067-4077
    • Khouja, M.1
  • 22
    • 0032210383 scopus 로고    scopus 로고
    • The use of genetic algorithms to solve the economic lot size scheduling problem
    • M. Khouja, Z. Michalewich, and M. Wilmot, The use of genetic algorithms to solve the economic lot size scheduling problem, Eur J Oper Res 110 (1998), 509-524.
    • (1998) Eur J Oper Res , vol.110 , pp. 509-524
    • Khouja, M.1    Michalewich, Z.2    Wilmot, M.3
  • 24
    • 0001947442 scopus 로고
    • The scheduling of economic lot sizes
    • W. Maxwell, The scheduling of economic lot sizes, Nav Res Logistics Quart 11 (1964), 89-124.
    • (1964) Nav Res Logistics Quart , vol.11 , pp. 89-124
    • Maxwell, W.1
  • 26
    • 0001361091 scopus 로고
    • Multiproduct economic lot size models with investment costs for setup reduction and quality improvement: Review and extensions
    • I. Moon, Multiproduct economic lot size models with investment costs for setup reduction and quality improvement: Review and extensions, Int J Prod Res 32 (1994), 2795-2801.
    • (1994) Int J Prod Res , vol.32 , pp. 2795-2801
    • Moon, I.1
  • 27
    • 0026373729 scopus 로고
    • Controllable production rates in a family production context
    • I. Moon, G. Gallego, and D. Simchi-Levi, Controllable production rates in a family production context, Int J Prod Res 29 (1991), 2459-2470.
    • (1991) Int J Prod Res , vol.29 , pp. 2459-2470
    • Moon, I.1    Gallego, G.2    Simchi-Levi, D.3
  • 28
    • 0032284857 scopus 로고    scopus 로고
    • The effect of the stabilization period on the economic lot scheduling problem
    • I. Moon, J. Hahm, and C. Lee, The effect of the stabilization period on the economic lot scheduling problem, IIE Trans 30 (1998), 1009-1017.
    • (1998) IIE Trans , vol.30 , pp. 1009-1017
    • Moon, I.1    Hahm, J.2    Lee, C.3
  • 29
    • 0037051291 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for the economic lot scheduling problem
    • I. Moon, E. Silver, and S. Choi, A hybrid genetic algorithm for the economic lot scheduling problem, Int J Prod Res 40 (2002), 809-824.
    • (2002) Int J Prod Res , vol.40 , pp. 809-824
    • Moon, I.1    Silver, E.2    Choi, S.3
  • 30
    • 0001343645 scopus 로고
    • Rounding off to powers of two in continuous relaxation of capacitated lot sizing problems
    • R. Roundy, Rounding off to powers of two in continuous relaxation of capacitated lot sizing problems, Manage Sci 35 (1989), 1433-1442.
    • (1989) Manage Sci , vol.35 , pp. 1433-1442
    • Roundy, R.1
  • 31
    • 0025243881 scopus 로고
    • Deliberately slowing down output in a family production context
    • E. Silver, Deliberately slowing down output in a family production context, Int J Prod Res 28 (1990), 17-27.
    • (1990) Int J Prod Res , vol.28 , pp. 17-27
    • Silver, E.1
  • 33
    • 0002144959 scopus 로고
    • Computing optimal lot sizes in the economic lot scheduling problem
    • P.H. Zipkin, Computing optimal lot sizes in the economic lot scheduling problem, Oper Res 39 (1991), 56-63.
    • (1991) Oper Res , vol.39 , pp. 56-63
    • Zipkin, P.H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.