-
2
-
-
0029216608
-
Interval scheduling: Fine-grained code scheduling for embedded systems
-
P. Chou, G. Boriello,.Interval Scheduling: Fine-Grained Code Scheduling for Embedded Systems., Proc. ACM/IEEE DAC, 1995, 462-467.
-
(1995)
Proc. ACM/IEEE DAC
, pp. 462-467
-
-
Chou, P.1
Boriello, G.2
-
3
-
-
0015482117
-
Optimal scheduling for two processor systems
-
E.G. Coffman Jr., R.L. Graham, "Optimal Scheduling for two Processor Systems", Acta Informatica, 1, 1972, 200-213.
-
(1972)
Acta Informatica
, vol.1
, pp. 200-213
-
-
Coffman Jr., E.G.1
Graham, R.L.2
-
4
-
-
0030784055
-
System level hardware/software partitioning based on simulated annealing and tabu search
-
P. Eles, Z. Peng, K. Kuchcinski, A. Doboli,.System Level Hardware/Software Partitioning Based on Simulated Annealing and Tabu Search., Des. Aut. for Emb. Syst.,V2, N1, 1997, 5-32.
-
(1997)
Des. Aut. for Emb. Syst
, vol.2
, Issue.1
, pp. 5-32
-
-
Eles, P.1
Peng, Z.2
Kuchcinski, K.3
Doboli, A.4
-
5
-
-
85041873106
-
Process scheduling for performance estimation and synthesis of em-bedded systems
-
P. Eles, K. Kuchcinski, Z. Peng, A. Doboli, P. Pop,.Process Scheduling for Performance Estimation and Synthesis of Em-bedded Systems., Research Report, Department of Computer and Information Science, Linköping University, 1997.
-
(1997)
Research Report, Department of Computer and Information Science, Linköping University
-
-
Eles, P.1
Kuchcinski, K.2
Peng, Z.3
Doboli, A.4
Pop, P.5
-
6
-
-
0029779451
-
A co-synthesis approach to embedded system design automation
-
R. K. Gupta, G. De Micheli,.A Co-Synthesis Approach to Embedded System Design Automation., Des. Aut. for Emb. Syst., V1, N1/2, 1996, 69-120.
-
(1996)
Des. Aut. for Emb. Syst
, vol.1
, Issue.1-2
, pp. 69-120
-
-
Gupta, R.K.1
De Micheli, G.2
-
7
-
-
0021529549
-
Practical multiprocessor scheduling algorithms for efficient parallel processing
-
H. Kasahara, S. Narita, "Practical Multiprocessor Scheduling Algorithms for Efficient Parallel Processing", IEEE Trans. on Comp., V33, N11, 1984, 1023-1029.
-
(1984)
IEEE Trans. on Comp
, vol.33
, Issue.11
, pp. 1023-1029
-
-
Kasahara, H.1
Narita, S.2
-
9
-
-
0030142084
-
Dynamic critical-path scheduling: An effective technique for allocating taskgraphs tomultiproces-sors
-
Y.K. Kwok, I. Ahmad, "Dynamic Critical-Path Scheduling: an Effective Technique for Allocating TaskGraphs toMultiproces-sors", IEEETrans. on Par.&Distr. Syst., V7,N5, 1996, 506-521.
-
(1996)
IEEETrans. on Par.&Distr. Syst
, vol.7
, Issue.5
, pp. 506-521
-
-
Kwok, Y.K.1
Ahmad, I.2
-
10
-
-
0029233511
-
Performance analysis of embedded soft-ware using implicit path enumeration
-
Y. S. Li, S. Malik,.Performance Analysis of Embedded Soft-ware Using Implicit Path Enumeration., Proc. ACM/IEEE Design Automation Conference, 1995, 456-461.
-
(1995)
Proc. ACM/IEEE Design Automation Conference
, pp. 456-461
-
-
Li, Y.S.1
Malik, S.2
-
11
-
-
0000679218
-
SOS: Synthesis of application-specific heterogeneous multiprocessor systems
-
S. Prakash, A. Parker,.SOS: Synthesis of Application-Specific Heterogeneous Multiprocessor Systems., Journal of Parallel and Distrib. Comp., V16, 1992, 338-351.
-
(1992)
Journal of Parallel and Distrib. Comp
, vol.16
, pp. 338-351
-
-
Prakash, S.1
Parker, A.2
-
12
-
-
0029716066
-
Efficient software performance estimation methods for hardware/software code-sign
-
K. Suzuki, A. Sangiovanni-Vincentelli,.Efficient Software Performance Estimation Methods for Hardware/Software Code-sign., Proc. ACM/IEEE DAC,.96, 605-610.
-
Proc. ACM/IEEE DAC
, vol.96
, pp. 605-610
-
-
Suzuki, K.1
Sangiovanni-Vincentelli, A.2
-
13
-
-
0016518855
-
NP-Complete scheduling problems
-
J.D. Ullman, "NP-Complete Scheduling Problems", Journal of Comput. Syst. Sci., 10, 384-393, 1975.
-
(1975)
Journal of Comput. Syst. Sci.
, vol.10
, pp. 384-393
-
-
Ullman, J.D.1
|