메뉴 건너뛰기




Volumn 41, Issue 5, 2003, Pages 939-961

Multiple response optimization using mixture-designed experiments and desirability functions in semiconductor scheduling

Author keywords

[No Author keywords available]

Indexed keywords

MATHEMATICAL TRANSFORMATIONS; PROBLEM SOLVING; SCHEDULING; SEMICONDUCTOR DEVICE MANUFACTURE;

EID: 0042959699     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/0020754021000030402     Document Type: Article
Times cited : (49)

References (32)
  • 2
    • 0001173515 scopus 로고
    • Priority dispatching and job lateness in a job shop
    • CONWAY, R. W., 1965, Priority dispatching and job lateness in a job shop. Journal of Industrial Engineering, 16, 228-237
    • (1965) Journal of Industrial Engineering , vol.16 , pp. 228-237
    • Conway, R.W.1
  • 3
    • 0011788714 scopus 로고
    • Network dispatching by shortest operation discipline
    • CONWAY, R. W. and MAXWELL, W. L., 1962, Network dispatching by shortest operation discipline. Operations Research, 10, 51-73.
    • (1962) Operations Research , vol.10 , pp. 51-73
    • Conway, R.W.1    Maxwell, W.L.2
  • 4
    • 0029222605 scopus 로고
    • Fitting models to data from mixture experiments containing order factors
    • CORNELL, J. A., 1995, Fitting models to data from mixture experiments containing order factors. Journal of Quality Technology, 27(1), 13-33.
    • (1995) Journal of Quality Technology , vol.27 , Issue.1 , pp. 13-33
    • Cornell, J.A.1
  • 7
    • 0035307346 scopus 로고    scopus 로고
    • A combined dispatching criteria approach to scheduling semiconductor manufacturing systems
    • DABBAS, R., CHEN, H., FOWLER, J. and SHUNK, D., 2001, A combined dispatching criteria approach to scheduling semiconductor manufacturing systems. Computers and Industrial Engineering, 39, 307-324.
    • (2001) Computers and Industrial Engineering , vol.39 , pp. 307-324
    • Dabbas, R.1    Chen, H.2    Fowler, J.3    Shunk, D.4
  • 8
    • 0000432952 scopus 로고
    • Simultaneous optimization of several response variables
    • DERRINGER, G. and SUICH, R., 1980, Simultaneous optimization of several response variables. Journal of Quality Technology, 12(4), 214-219.
    • (1980) Journal of Quality Technology , vol.12 , Issue.4 , pp. 214-219
    • Derringer, G.1    Suich, R.2
  • 9
    • 0026866908 scopus 로고
    • Real time control of multiproduct bulk-service semiconductor manufacturing processes
    • FOWLER, J. W., PHILLIPS, D. T. and HOGG, G. L., 1992, Real time control of multiproduct bulk-service semiconductor manufacturing processes. IEEE Transactions on Semiconductor Manufacturing, 5(2), 158-163.
    • (1992) IEEE Transactions on Semiconductor Manufacturing , vol.5 , Issue.2 , pp. 158-163
    • Fowler, J.W.1    Phillips, D.T.2    Hogg, G.L.3
  • 10
    • 0034135518 scopus 로고    scopus 로고
    • Control of multiproduct bulk server diffusion/oxidation processes Part Two: Multiple servers
    • FOWLER, J. W., HOGG, G. L. and PHILLIPS, D. T., 2000, Control of multiproduct bulk server diffusion/oxidation processes Part Two: multiple servers. IIE Transactions on Scheduling and Logistics, 32(2), 167-176.
    • (2000) IIE Transactions on Scheduling and Logistics , vol.32 , Issue.2 , pp. 167-176
    • Fowler, J.W.1    Hogg, G.L.2    Phillips, D.T.3
  • 11
    • 0036819559 scopus 로고    scopus 로고
    • Workload control in the semiconductor industry
    • Working Paper, Arizona State University, to be published
    • FOWLER, J. W., HOGG, G. L. and MASON, S. J., 2002, Workload control in the semiconductor industry. Working Paper, Arizona State University. Production Planning and Control, to be published.
    • (2002) Production Planning and Control
    • Fowler, J.W.1    Hogg, G.L.2    Mason, S.J.3
  • 15
    • 0027842088 scopus 로고    scopus 로고
    • Practical issues in scheduling and dispatching in semiconductor wafer fabrication
    • JOHRI, P. K., 1998, Practical issues in scheduling and dispatching in semiconductor wafer fabrication. Journal of Manufacturing Systems, 12, 474-485.
    • (1998) Journal of Manufacturing Systems , vol.12 , pp. 474-485
    • Johri, P.K.1
  • 16
    • 0043038934 scopus 로고
    • Intelligently scheduling semiconductor wafer fabrication
    • M. Zweben and M. Fox (eds) San Mateo, CA: Morgan and Kaufmann, Chapter 44
    • KEMPF, K. G., 1994. Intelligently scheduling semiconductor wafer fabrication. In M. Zweben and M. Fox (eds) Intelligent Scheduling (San Mateo, CA: Morgan and Kaufmann), Chapter 44, pp. 100-150.
    • (1994) Intelligent Scheduling , pp. 100-150
    • Kempf, K.G.1
  • 17
    • 0032002955 scopus 로고    scopus 로고
    • Due date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility
    • Kim, Y.-D., Kim, J.-U. and LIM, S.-K., 1998a, Due date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility. IEEE Transactions on Semiconductor Manufacturing, 11(1), 155-164.
    • (1998) IEEE Transactions on Semiconductor Manufacturing , vol.11 , Issue.1 , pp. 155-164
    • Kim, Y.-D.1    Kim, J.-U.2    Lim, S.-K.3
  • 18
    • 0030084325 scopus 로고    scopus 로고
    • Minimum inventory variability scheduler with applications in semiconductor manufacturing
    • LI, S., TANG, T. and COLLINS, D. W., 1996, Minimum inventory variability scheduler with applications in semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing, 9(1), 1-5.
    • (1996) IEEE Transactions on Semiconductor Manufacturing , vol.9 , Issue.1 , pp. 1-5
    • Li, S.1    Tang, T.2    Collins, D.W.3
  • 20
    • 0000861722 scopus 로고
    • A proof for the queueing formula L = λW
    • LITTLE, J. D. C., 1961, A proof for the queueing formula L = λW. Operations Research, 9, 383-387.
    • (1961) Operations Research , vol.9 , pp. 383-387
    • Little, J.D.C.1
  • 21
    • 0028481114 scopus 로고
    • Efficient scheduling policies to reduce mean and variance of cycle time in semiconductor manufacturing plants
    • LU, S. C. H., RAMSWAMY, D. and KUMAR, P. R., 1994, Efficient scheduling policies to reduce mean and variance of cycle time in semiconductor manufacturing plants. IEEE Transactions on Semiconductor Manufacturing, 7(3), 374-388.
    • (1994) IEEE Transactions on Semiconductor Manufacturing , vol.7 , Issue.3 , pp. 374-388
    • Lu, S.C.H.1    Ramswamy, D.2    Kumar, P.R.3
  • 23
    • 0029368025 scopus 로고
    • An analysis of dispatching rules in a semiconductor wafer fabrication environment
    • McCutchen, T. and LEE, C.-Y., 1995, An analysis of dispatching rules in a semiconductor wafer fabrication environment. Journal of Electronics Manufacturing, 5(3), 165-174.
    • (1995) Journal of Electronics Manufacturing , vol.5 , Issue.3 , pp. 165-174
    • McCutchen, T.1    Lee, C.-Y.2
  • 24
    • 0003486756 scopus 로고
    • MONTGOMERY, New York: Wiley, chapter 3
    • MONTGOMERY, D. C., 1991, Design and Analysis of Experiments, 3rd edn (New York: Wiley), chapter 3, pp. 50-89.
    • (1991) Design and Analysis of Experiments, 3rd Edn , pp. 50-89
  • 27
    • 0016885524 scopus 로고
    • A statistical comparison of the performance of simple dispatching rules for a particular set of job shops
    • ROCHETTE, R. and SADOWSKI, R. P., 1976, A statistical comparison of the performance of simple dispatching rules for a particular set of job shops. International Journal of Production Research, 14, 63-75.
    • (1976) International Journal of Production Research , vol.14 , pp. 63-75
    • Rochette, R.1    Sadowski, R.P.2
  • 29
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry - Part II: Shop-floor control
    • UZSOY, R., LEE, C.-Y. and MARTIN-VEGA, L., 1994, A review of production planning and scheduling models in the semiconductor industry - Part II: Shop-floor control. IIE Transactions, 26(5), 44-55.
    • (1994) IIE Transactions , vol.26 , Issue.5 , pp. 44-55
    • Uzsoy, R.1    Lee, C.-Y.2    Martin-Vega, L.3
  • 30
    • 0005752222 scopus 로고
    • Priority rules and lead time estimation for job shop scheduling with weighted tardiness costs
    • VEPSALAINEN, A. and MORTON, T. E., 1987, Priority rules and lead time estimation for job shop scheduling with weighted tardiness costs. Management Science, 33, 1036-1047.
    • (1987) Management Science , vol.33 , pp. 1036-1047
    • Vepsalainen, A.1    Morton, T.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.