|
Volumn 50, Issue 4 II, 2003, Pages 864-868
|
The first integration test of the ATLAS end-cap muon level 1 trigger system
a a a a a a b b b b c c c c d d e e f f more..
f
KOBE UNIVERSITY
(Japan)
|
Author keywords
Application specific integrated circuits (ASICs); Data acqusisition; Triggering
|
Indexed keywords
APPLICATION SPECIFIC INTEGRATED CIRCUITS;
COMPUTER SIMULATION;
DATA ACQUISITION;
SOFTWARE PROTOTYPING;
TRIGGER CIRCUITS;
SLICE TEST SYSTEMS;
COLLIDING BEAM ACCELERATORS;
|
EID: 0042928200
PISSN: 00189499
EISSN: None
Source Type: Journal
DOI: 10.1109/TNS.2003.814538 Document Type: Conference Paper |
Times cited : (4)
|
References (11)
|