-
1
-
-
84952240555
-
A review of production planning and scheduling models in the semiconductor industry. Part 1: System characteristics, performance evaluation and production planning
-
Uzsoy, R.; Lee, C. Y.; Marti-Vega, L. A. A review of production planning and scheduling models in the semiconductor industry. Part 1: System characteristics, performance evaluation and production planning. IIE Trans. 1992, 24 (4), 47.
-
(1992)
IIE Trans.
, vol.24
, Issue.4
, pp. 47
-
-
Uzsoy, R.1
Lee, C.Y.2
Marti-Vega, L.A.3
-
2
-
-
0034332901
-
Scheduling a single-product reentrant process with uniform processing times
-
Lamba, N.; Karimi, I. A.; Bhalla, A. Scheduling a single-product reentrant process with uniform processing times. Ind. Eng. Chem. Res. 2000, 39 (11), 4203.
-
(2000)
Ind. Eng. Chem. Res.
, vol.39
, Issue.11
, pp. 4203
-
-
Lamba, N.1
Karimi, I.A.2
Bhalla, A.3
-
4
-
-
0028744478
-
Scheduling semiconductor manufacturing plants
-
Kumar, P. R. Scheduling semiconductor manufacturing plants. IEEE Control Syst. 1994, 14 (6), 33.
-
(1994)
IEEE Control Syst
, vol.14
, Issue.6
, pp. 33
-
-
Kumar, P.R.1
-
5
-
-
0033331613
-
Optimization of cycle time and utilization in semiconductor test manufacturing using simulation based, online, near-real-time scheduling system
-
IEEE Computer Society Press, Los Alamitos, CA
-
Sivakumar, A. I. Optimization of cycle time and utilization in semiconductor test manufacturing using simulation based, online, near-real-time scheduling system. In Proceedings of the Winter Simulation Conference; IEEE Computer Society Press, Los Alamitos, CA, 1999; p 727.
-
(1999)
Proceedings of the Winter Simulation Conference
, pp. 727
-
-
Sivakumar, A.I.1
-
6
-
-
0024090948
-
Scheduling in serial multiproduct batch processes with finite interstage storage: A mixed integer linear program formulation
-
Ku, H. M.; Karimi, I. A. Scheduling in serial multiproduct batch processes with finite interstage storage: A mixed integer linear program formulation. Ind. Eng. Chem. Res. 1988, 27, 1840.
-
(1988)
Ind. Eng. Chem. Res.
, vol.27
, pp. 1840
-
-
Ku, H.M.1
Karimi, I.A.2
-
7
-
-
0024984801
-
Completion time algorithms for serial multiproduct batch processes with shared storage
-
Ku, H. M.; Karimi, I. A. Completion time algorithms for serial multiproduct batch processes with shared storage. Comput. Chem. Eng. 1990, 14 (1), 49.
-
(1990)
Comput. Chem. Eng.
, vol.14
, Issue.1
, pp. 49
-
-
Ku, H.M.1
Karimi, I.A.2
-
8
-
-
0024029390
-
Hoist scheduling for a PCB electroplating facility
-
Shapiro, G. W.; Nuttle, H. L. W. Hoist scheduling for a PCB electroplating facility. IIE Trans. 1988, 20 (2), 157.
-
(1988)
IIE Trans.
, vol.20
, Issue.2
, pp. 157
-
-
Shapiro, G.W.1
Nuttle, H.L.W.2
-
9
-
-
0016962332
-
Mathematical programming solution of a hoist-scheduling program
-
Phillips, L. W.; Unger, P. S. Mathematical programming solution of a hoist-scheduling program. AIIE Trans. 1976, 8 (2), 219.
-
(1976)
AIIE Trans.
, vol.8
, Issue.2
, pp. 219
-
-
Phillips, L.W.1
Unger, P.S.2
-
10
-
-
0042175883
-
A heuristic method for single hoist cyclic scheduling
-
Zhou, Z. L.; Zu, L. H. A heuristic method for single hoist cyclic scheduling. J. Syst. Simul. 2000, 12 (4), 389.
-
(2000)
J. Syst. Simul.
, vol.12
, Issue.4
, pp. 389
-
-
Zhou, Z.L.1
Zu, L.H.2
-
11
-
-
0001548059
-
A tabu search approach to scheduling an automated wet etch station
-
Geiger D. C.; Kempf K. G.; Uzsoy R. A tabu search approach to scheduling an automated wet etch station. J. Manuf. Systems. 1997, 16 (2), 102.
-
(1997)
J. Manuf. Systems
, vol.16
, Issue.2
, pp. 102
-
-
Geiger, D.C.1
Kempf, K.G.2
Uzsoy, R.3
|