-
1
-
-
0041296994
-
-
Paragon Technologies Report, United States Securities and Exchange Commission, New York, NY
-
Anon (1999) Paragon Technologies Report, United States Securities and Exchange Commission, New York, NY.
-
(1999)
-
-
-
2
-
-
0042799730
-
When is AGVS the best solution
-
Products Information of Mannesmann Dematic, Grand Rapids, MI
-
Anon (2001) When is AGVS the best solution. http://www.Rapistan.com, Products Information of Mannesmann Dematic, Grand Rapids, MI.
-
(2001)
-
-
-
3
-
-
0026117415
-
Tandem configurations for automated guided vehicle systems and the analysis of single vehicle loops
-
Bozer, Y.A. and Srinivasan, M.M. (1991) Tandem configurations for automated guided vehicle systems and the analysis of single vehicle loops. IIE Transactions, 23(1), 72-82.
-
(1991)
IIE Transactions
, vol.23
, Issue.1
, pp. 72-82
-
-
Bozer, Y.A.1
Srinivasan, M.M.2
-
4
-
-
0030169650
-
Dynamic relative positioning of AGVs in a loop layout to minimize mean response time
-
Chang, S.H. and Egbelu, P.J. (1996) Dynamic relative positioning of AGVs in a loop layout to minimize mean response time. International Journal of Production Research, 34(6), 1655-1673.
-
(1996)
International Journal of Production Research
, vol.34
, Issue.6
, pp. 1655-1673
-
-
Chang, S.H.1
Egbelu, P.J.2
-
5
-
-
0004226793
-
-
West, St. Paul, MN
-
Coyle, J.J., Bardi, E.J. and Langley, C.J. (1996) The Management of Business Logistics, West, St. Paul, MN.
-
(1996)
The Management of Business Logistics
-
-
Coyle, J.J.1
Bardi, E.J.2
Langley, C.J.3
-
7
-
-
0027702306
-
Positioning of automated guided vehicles in a loop layout to improve response time
-
Egbelu, P.J. (1993) Positioning of automated guided vehicles in a loop layout to improve response time. European Journal of Operational Research, 71(1), 32-44.
-
(1993)
European Journal of Operational Research
, vol.71
, Issue.1
, pp. 32-44
-
-
Egbelu, P.J.1
-
8
-
-
0022785934
-
Potentials for bidirectional guide-path for automated guided vehicle based systems
-
Egbelu, P.J. and Tanchoco, J.M.A. (1986) Potentials for bidirectional guide-path for automated guided vehicle based systems. International Journal of Production Research, 24(5), 1075-1097.
-
(1986)
International Journal of Production Research
, vol.24
, Issue.5
, pp. 1075-1097
-
-
Egbelu, P.J.1
Tanchoco, J.M.A.2
-
9
-
-
0041296993
-
Design issues of AGV systems: Literature survey
-
Report 2000.LT.5433, Transport Technology and Logistics Engineering, Delft University of Technology, Delft, Netherlands
-
Herijgers, B.R.C. (2000) Design issues of AGV systems: Literature survey. Report 2000.LT.5433, Transport Technology and Logistics Engineering, Delft University of Technology, Delft, Netherlands.
-
(2000)
-
-
Herijgers, B.R.C.1
-
10
-
-
0010907196
-
Investigation of idle vehicle prepositioning strategies in an automated guided vehicle system
-
Ph.D. dissertation. Department of Industrial and Manufacturing Engineering. The Pennsylvania State University, University Park, PA
-
Hu, C.H. (1995) Investigation of idle vehicle prepositioning strategies in an automated guided vehicle system. Ph.D. dissertation. Department of Industrial and Manufacturing Engineering. The Pennsylvania State University, University Park, PA.
-
(1995)
-
-
Hu, C.H.1
-
11
-
-
0000797402
-
Positioning of automated guided vehicles in a loop layout to minimize the mean response time
-
Kim, K.H. (1995) Positioning of automated guided vehicles in a loop layout to minimize the mean response time. International Journal of Production Economics, 39, 201-214.
-
(1995)
International Journal of Production Economics
, vol.39
, pp. 201-214
-
-
Kim, K.H.1
-
12
-
-
0033207562
-
Determination of unit load sizes of AGV in multi-product multi-line assembly production systems
-
Moon, S.W. and Hwang, H. (1999) Determination of unit load sizes of AGV in multi-product multi-line assembly production systems. International Journal of Production Research, 37(15), 3565-3581.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.15
, pp. 3565-3581
-
-
Moon, S.W.1
Hwang, H.2
-
13
-
-
0033741825
-
Conflict resolution in AGV systems
-
Reveliotis, S.A. (2000) Conflict resolution in AGV systems. IIE Transactions, 32(7), 647-659.
-
(2000)
IIE Transactions
, vol.32
, Issue.7
, pp. 647-659
-
-
Reveliotis, S.A.1
-
14
-
-
0003511262
-
-
PWS-KENT Publishing Co., Boston, MA
-
Sule, S.R. (1994) Manufacturing Facilities: Location, Planning, and Design, PWS-KENT Publishing Co., Boston, MA.
-
(1994)
Manufacturing Facilities: Location, Planning, and Design
-
-
Sule, S.R.1
-
15
-
-
0041296992
-
Scheduling and control of manufacturing systems with critical material handling
-
Ph.D. dissertation. School of Industrial Engineering, Purdue University, West Lafayette, IN
-
Taghaboni, F. (1989) Scheduling and control of manufacturing systems with critical material handling. Ph.D. dissertation. School of Industrial Engineering, Purdue University, West Lafayette, IN.
-
(1989)
-
-
Taghaboni, F.1
-
16
-
-
0042851798
-
A study of the tandem loop with multiple vehicles configuration for automated guided vehicle systems
-
Ventura, J.A. and Lee, C. (2001) A study of the tandem loop with multiple vehicles configuration for automated guided vehicle systems. Journal of Manufacturing Systems, 20(3), 153-165.
-
(2001)
Journal of Manufacturing Systems
, vol.20
, Issue.3
, pp. 153-165
-
-
Ventura, J.A.1
Lee, C.2
|