메뉴 건너뛰기




Volumn 103, Issue 5-6, 2003, Pages 373-387

Application of quality function deployment (QFD) method for pultrusion machine design planning

Author keywords

House of quality; New products; Quality function deployment

Indexed keywords

COMPETITION; CONCURRENT ENGINEERING; COSTS; CUSTOMER SATISFACTION; MARKETING; PARALLEL PROCESSING SYSTEMS; PRODUCT DEVELOPMENT; PROJECT MANAGEMENT; QUALITY CONTROL; STRATEGIC PLANNING;

EID: 0041862617     PISSN: 02635577     EISSN: None     Source Type: Journal    
DOI: 10.1108/02635570310479954     Document Type: Review
Times cited : (25)

References (35)
  • 2
    • 0036338256 scopus 로고    scopus 로고
    • Organisational structures to support concurrent engineering in construction
    • Anumba, C.J., Baugh, C. and Khalfan, M.M.A. (2002), "Organisational structures to support concurrent engineering in construction", Industrial Management & Data Systems, Vol. 102 No. 5, pp. 260-70.
    • (2002) Industrial Management & Data Systems , vol.102 , pp. 260-270
    • Anumba, C.J.1    Baugh, C.2    Khalfan, M.M.A.3
  • 3
    • 84900274741 scopus 로고
    • Supplier involvement in integrated product development: A comparison of US and European practices
    • Birou, L.M. and Fawcett, S.E. (1994), "Supplier involvement in integrated product development: a comparison of US and European practices", International Journal of Physical Distribution & Logistics Management, Vol. 24 No. 5, pp. 4-14.
    • (1994) International Journal of Physical Distribution & Logistics Management , vol.24 , Issue.5 , pp. 4-14
    • Birou, L.M.1    Fawcett, S.E.2
  • 4
    • 85148509269 scopus 로고    scopus 로고
    • Role models: Virtual people take on the job of testing complex designs
    • July
    • Brown, A.S. (1999), "Role models: virtual people take on the job of testing complex designs", Mechanical Engineering, July, pp. 44-9.
    • (1999) Mechanical Engineering , pp. 44-49
    • Brown, A.S.1
  • 7
    • 0029220508 scopus 로고
    • A methodology for an integrated design and process planning based on a concurrent engineering reference model
    • Eversheim, W., Rozenfeld, H., Bochtler, W. and Graessler, R. (1995), "A methodology for an integrated design and process planning based on a concurrent engineering reference model", Annals of the CIRP, Vol. 44 No. 1, pp. 403-6.
    • (1995) Annals of the CIRP , vol.44 , Issue.1 , pp. 403-406
    • Eversheim, W.1    Rozenfeld, H.2    Bochtler, W.3    Graessler, R.4
  • 8
    • 0029196143 scopus 로고
    • Managing design for a quality product
    • Fox, J. (1995), "Managing design for a quality product", Assembly Automation, Vol. 15 No. 1, pp. 12-14.
    • (1995) Assembly Automation , vol.15 , Issue.1 , pp. 12-14
    • Fox, J.1
  • 9
    • 0041484149 scopus 로고    scopus 로고
    • Product's technical quality profile design based on competition analysis and customer requirement: An application to a real case
    • Franceschini, F. and Zappulli, M. (1998), "Product's technical quality profile design based on competition analysis and customer requirement: an application to a real case", International Journal of Quality & Reliability Management, Vol. 15 No. 4, pp. 431-42.
    • (1998) International Journal of Quality & Reliability Management , vol.15 , Issue.4 , pp. 431-442
    • Franceschini, F.1    Zappulli, M.2
  • 10
    • 0031199234 scopus 로고    scopus 로고
    • Learning from design histories in concurrent engineering
    • Gammack, J.G. and Jenkins, D.G. (1997), "Learning from design histories in concurrent engineering", Computers in Industry, Vol. 33, pp. 83-90.
    • (1997) Computers in Industry , vol.33 , pp. 83-90
    • Gammack, J.G.1    Jenkins, D.G.2
  • 11
    • 0034318529 scopus 로고    scopus 로고
    • Implementation of concurrent engineering in the suppliers to the automotive industry
    • Gao, J.X., Manson, B.M. and Kyratsis, P. (2000), "Implementation of concurrent engineering in the suppliers to the automotive industry", Journal of Materials Processing Technology, Vol. 107, pp. 201-8.
    • (2000) Journal of Materials Processing Technology , vol.107 , pp. 201-208
    • Gao, J.X.1    Manson, B.M.2    Kyratsis, P.3
  • 12
    • 0031677323 scopus 로고    scopus 로고
    • An integrated product development-quality management system for manufacturing
    • Gunasekaran, A. (1998), "An integrated product development-quality management system for manufacturing", The TQM Magazine, Vol. 10 No. 2, pp. 115-23.
    • (1998) The TQM Magazine , vol.10 , Issue.2 , pp. 115-123
    • Gunasekaran, A.1
  • 14
    • 0001772263 scopus 로고
    • The house of quality
    • May-June
    • Hauser, J.R. and Clausing, D. (1988), "The house of quality", Harvard Business Review, Vol. 66 No. 3, May-June, pp. 63-73.
    • (1988) Harvard Business Review , vol.66 , Issue.3 , pp. 63-73
    • Hauser, J.R.1    Clausing, D.2
  • 15
    • 0033484192 scopus 로고    scopus 로고
    • Current practices of engineering change management in UK manufacturing industries
    • Huang, G.Q. and Mak, K.L. (1999),"Current practices of engineering change management in UK manufacturing industries", International Journal of Operations & Production Management, Vol. 19 No. 1, pp. 21-37.
    • (1999) International Journal of Operations & Production Management , vol.19 , Issue.1 , pp. 21-37
    • Huang, G.Q.1    Mak, K.L.2
  • 17
    • 0035781038 scopus 로고    scopus 로고
    • A QFD based methodology for evaluation of a company's PDM requirements for collaborative product development
    • Kumar, R. and Midha, P.S. (2001), "A QFD based methodology for evaluation of a company's PDM requirements for collaborative product development", Industrial Management & Data Systems, Vol. 101 No. 3, pp. 126-31.
    • (2001) Industrial Management & Data Systems , vol.101 , Issue.3 , pp. 126-131
    • Kumar, R.1    Midha, P.S.2
  • 18
    • 0031106139 scopus 로고    scopus 로고
    • Potential use of a house of quality matrix technique in rehabilitation engineering
    • Logan, G.D. and Radcliffe, D.F. (1997), "Potential use of a house of quality matrix technique in rehabilitation engineering", IEEE Transactions on Rehabilitation Engineering, Vol. 5 No. 1, pp. 106-15.
    • (1997) IEEE Transactions on Rehabilitation Engineering , vol.5 , Issue.1 , pp. 106-115
    • Logan, G.D.1    Radcliffe, D.F.2
  • 19
    • 0041985140 scopus 로고
    • Design planning of an off-highway dump truck - A QFD approach
    • Kuo, W. (Ed.), Elsevier Science Publisher, Amsterdam
    • Maduri, O. (1993), "Design planning of an off-highway dump truck - a QFD approach", in Kuo, W. (Ed.), Quality Through Engineering Design, Elsevier Science Publisher, Amsterdam, pp. 97-104.
    • (1993) Quality Through Engineering Design , pp. 97-104
    • Maduri, O.1
  • 21
    • 0033100464 scopus 로고    scopus 로고
    • The characterization of a clean room assembly process
    • Mrad, F. (1999), "The characterization of a clean room assembly process", IEEE Transactions on Industry Applications, Vol. 35 No. 2, pp. 399-404.
    • (1999) IEEE Transactions on Industry Applications , vol.35 , Issue.2 , pp. 399-404
    • Mrad, F.1
  • 22
    • 0032154859 scopus 로고    scopus 로고
    • The framework for an expert system to generate alternative products in concurrent engineering design
    • Myint, S. and Tabucanon, M.T. (1998), "The framework for an expert system to generate alternative products in concurrent engineering design", Computers in Industry, Vol. 38, pp. 125-34.
    • (1998) Computers in Industry , vol.38 , pp. 125-134
    • Myint, S.1    Tabucanon, M.T.2
  • 23
    • 0030709845 scopus 로고    scopus 로고
    • Organizing for concurrent engineering: An integration mechanism framework
    • Paashuis, V. and Boer, H. (1997), "Organizing for concurrent engineering: an integration mechanism framework", Integrated Manufacturing Systems, Vol. 8 No. 2, pp. 79-89.
    • (1997) Integrated Manufacturing Systems , vol.8 , Issue.2 , pp. 79-89
    • Paashuis, V.1    Boer, H.2
  • 24
    • 0000981466 scopus 로고    scopus 로고
    • Interfirm collaboration and the new product development process
    • Parker, H. (2000), "Interfirm collaboration and the new product development process", Industrial Management & Data Systems, Vol. 100 No. 6, pp. 255-60.
    • (2000) Industrial Management & Data Systems , vol.100 , Issue.6 , pp. 255-260
    • Parker, H.1
  • 25
    • 0030706952 scopus 로고    scopus 로고
    • Re-engineering life-cycle management of products to achieve global success in the changing marketplace
    • Prasad, B. (1997), "Re-engineering life-cycle management of products to achieve global success in the changing marketplace", Industrial Management & Data Systems, Vol. 97 No. 3, pp. 90-8.
    • (1997) Industrial Management & Data Systems , vol.97 , Issue.3 , pp. 90-98
    • Prasad, B.1
  • 27
    • 0030378286 scopus 로고    scopus 로고
    • Using metrics to monitor concurrent product development
    • Rook, J. and Medhat, S. (1996), "Using metrics to monitor concurrent product development", Industrial Management and & Data Systems, Vol. 96 No. 1, pp. 3-7.
    • (1996) Industrial Management and & Data Systems , vol.96 , Issue.1 , pp. 3-7
    • Rook, J.1    Medhat, S.2
  • 28
    • 0001469385 scopus 로고    scopus 로고
    • New product introduction delays in the computer industry
    • Rosas-Verga, R. and Vokurka, R.J. (2000), "New product introduction delays in the computer industry", Industrial Management & Data Systems, Vol. 100 No. 4, pp. 157-63.
    • (2000) Industrial Management & Data Systems , vol.100 , Issue.4 , pp. 157-163
    • Rosas-Verga, R.1    Vokurka, R.J.2
  • 30
    • 0031077320 scopus 로고    scopus 로고
    • The historical roots of concurrent engineering fundamentals
    • Smith, R.P. (1997), "The historical roots of concurrent engineering fundamentals", IEEE Transactions on Engineering Management, Vol. 44 No. 1, pp. 67-78.
    • (1997) IEEE Transactions on Engineering Management , vol.44 , Issue.1 , pp. 67-78
    • Smith, R.P.1
  • 31
    • 0026995660 scopus 로고
    • Concurrent engineering
    • Sohlenius, G. (1992), "Concurrent engineering", Annals of the CIRP, Vol. 41 No. 2, pp. 645-55.
    • (1992) Annals of the CIRP , vol.41 , Issue.2 , pp. 645-655
    • Sohlenius, G.1
  • 32
    • 0030167813 scopus 로고    scopus 로고
    • Concurrent engineering infrastructure: Tools, technologies and methods in British industry
    • June
    • Veness, P.J., Chidolue, G. and Medhat, S.S. (1996), "Concurrent engineering infrastructure: tools, technologies and methods in British industry", Engineering Management Journal, June, pp. 141-7.
    • (1996) Engineering Management Journal , pp. 141-147
    • Veness, P.J.1    Chidolue, G.2    Medhat, S.S.3
  • 33
    • 0010685285 scopus 로고    scopus 로고
    • An automated system for product specification and design
    • Wei, C.C., Liu, P.H. and Chen, C.B. (2000), "An automated system for product specification and design", Assembly Automation, Vol. 20 No. 3, pp. 225-32.
    • (2000) Assembly Automation , vol.20 , Issue.3 , pp. 225-232
    • Wei, C.C.1    Liu, P.H.2    Chen, C.B.3
  • 35
    • 0031654332 scopus 로고    scopus 로고
    • Operational competitive requirements for the twenty-first century
    • Willis, T.H. (1998), "Operational competitive requirements for the twenty-first century", Industrial Management & Data Systems, Vol. 98 No. 2, pp. 83-6.
    • (1998) Industrial Management & Data Systems , vol.98 , Issue.2 , pp. 83-86
    • Willis, T.H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.