-
1
-
-
0015669867
-
An interactive procedure for the single machine multi-product lot scheduling problem
-
Doll CL, Whybark DC. An interactive procedure for the single machine multi-product lot scheduling problem. Management Science 1973;20:50-5.
-
(1973)
Management Science
, vol.20
, pp. 50-55
-
-
Doll, C.L.1
Whybark, D.C.2
-
2
-
-
0017931081
-
The economic lot scheduling problem (ELSP): Review and extensions
-
Elmaghraby SE. The economic lot scheduling problem (ELSP): review and extensions. Management Science 1978;24:587-98.
-
(1978)
Management Science
, vol.24
, pp. 587-598
-
-
Elmaghraby, S.E.1
-
3
-
-
0014752549
-
A heuristic production lot scheduling model
-
Denzler DR. A heuristic production lot scheduling model. AIIE Transactions 1970;2:59-63.
-
(1970)
AIIE Transactions
, vol.2
, pp. 59-63
-
-
Denzler, D.R.1
-
5
-
-
0022022738
-
The deterministic dynamic production cycling problem
-
Karmarkar US, Schrage L. The deterministic dynamic production cycling problem. Operations Research 1985;33: 326-45.
-
(1985)
Operations Research
, vol.33
, pp. 326-345
-
-
Karmarkar, U.S.1
Schrage, L.2
-
7
-
-
0030241532
-
A user interactive heuristic procedure for solving the multiple product cycling problem
-
Sandbothe RA. A user interactive heuristic procedure for solving the multiple product cycling problem. Computers and Operations Research 1996;23:897-909.
-
(1996)
Computers and Operations Research
, vol.23
, pp. 897-909
-
-
Sandbothe, R.A.1
-
8
-
-
0023977009
-
A heuristic scheduling policy for multi-item, single-machine production system with time-varying, stochastic demands
-
Leachman RC, Gascon A. A heuristic scheduling policy for multi-item, single-machine production system with time-varying, stochastic demands. Management Science 1998;34:377-90.
-
(1998)
Management Science
, vol.34
, pp. 377-390
-
-
Leachman, R.C.1
Gascon, A.2
-
10
-
-
0003004852
-
A hierarchical approach for capacity coordination in multiple products single-machine production system with stationary stochastic demands
-
Fransoo JC, Sridharan V, Bertrand JWM. A hierarchical approach for capacity coordination in multiple products single-machine production system with stationary stochastic demands. European Journal of Operational Research 1995;86:57-72.
-
(1995)
European Journal of Operational Research
, vol.86
, pp. 57-72
-
-
Fransoo, J.C.1
Sridharan, V.2
Bertrand, J.W.M.3
-
11
-
-
0025671260
-
The product cycling problem in systems with uncertain production yield
-
Yano CA. The product cycling problem in systems with uncertain production yield. IEEE Transactions on Robotics and Automation 1990;6:640-51.
-
(1990)
IEEE Transactions on Robotics and Automation
, vol.6
, pp. 640-651
-
-
Yano, C.A.1
-
12
-
-
0019057204
-
The multi-product production cycling problem
-
Graves SC. The multi-product production cycling problem. AIIE Transactions 1980;12:233-40.
-
(1980)
AIIE Transactions
, vol.12
, pp. 233-240
-
-
Graves, S.C.1
-
14
-
-
0031145148
-
Optimization-based planning for the stochastic lot-scheduling problem
-
Sox CR, Muckstadt JA. Optimization-based planning for the stochastic lot-scheduling problem. IIE Transactions 1997;29:349-57.
-
(1997)
IIE Transactions
, vol.29
, pp. 349-357
-
-
Sox, C.R.1
Muckstadt, J.A.2
-
15
-
-
0032664020
-
The eclectic model for stochastic dynamic production cycling problem
-
Yokoyama M. The eclectic model for stochastic dynamic production cycling problem. International Journal of Production Economics 1999;60-61:359-67.
-
(1999)
International Journal of Production Economics
, vol.60-61
, pp. 359-367
-
-
Yokoyama, M.1
-
18
-
-
21844518693
-
Production scheduling and genetic algorithms
-
Neubauer M. Production scheduling and genetic algorithms. Lecture Note in Computer Science 1995;973:563-82.
-
(1995)
Lecture Note in Computer Science
, vol.973
, pp. 563-582
-
-
Neubauer, M.1
|