메뉴 건너뛰기




Volumn 27, Issue 2-3, 2003, Pages 333-347

Cyclic just-in-time sequences are optimal

Author keywords

Apportionment problem; Assignment problem; Convex functions; Just in time systems; Optimization

Indexed keywords

FUNCTIONS; GLOBAL OPTIMIZATION;

EID: 0041323307     PISSN: 09255001     EISSN: None     Source Type: Journal    
DOI: 10.1023/A:1024847308982     Document Type: Conference Paper
Times cited : (12)

References (17)
  • 2
    • 0012944703 scopus 로고    scopus 로고
    • A simple approach to the product rate variation problem via axiomatics
    • Ecole Polytechnique, Paris
    • Balinski, M. and Shahidi, N. (1997), A simple approach to the product rate variation problem via axiomatics, Working paper No 466/1997, Ecole Polytechnique, Paris.
    • (1997) Working Paper No 466/1997 , vol.466
    • Balinski, M.1    Shahidi, N.2
  • 3
    • 0030290247 scopus 로고    scopus 로고
    • A note on the relation between the product rate variation (PRV) and the apportionment problem
    • Bautista, J., Companys, R. and Corominas, A. (1996), A note on the relation between the product rate variation (PRV) and the apportionment problem.Journal of Operational Research Society 47, 1410-1414.
    • (1996) Journal of Operational Research Society , vol.47 , pp. 1410-1414
    • Bautista, J.1    Companys, R.2    Corominas, A.3
  • 6
    • 0037629284 scopus 로고
    • The just-in-time systems
    • Graves, S.C., Rinnooy Kan, A.H.G. and Zipkin, P.H. (eds.), North Holland, Amsterdam
    • Groenevelt, H.(1993), The Just-in-Time Systems, in: Graves, S.C., Rinnooy Kan, A.H.G. and Zipkin, P.H. (eds.), "Handbooks in Operations research and Management Science" Vol 4, North Holland, Amsterdam.
    • (1993) Handbooks in Operations Research and Management Science , vol.4
    • Groenevelt, H.1
  • 7
    • 0027595182 scopus 로고
    • Minimizing variation of production rates in just-in-time systems: A survey
    • Kubiak, W. (1993), Minimizing variation of production rates in just-in-time systems: a survey, European Journal of Operational Research 66, 259-271.
    • (1993) European Journal of Operational Research , vol.66 , pp. 259-271
    • Kubiak, W.1
  • 8
    • 0041592016 scopus 로고    scopus 로고
    • Product rate variation problem and greatest common divisor property
    • Faculty of Business Administration, MUN, St. John's
    • Kubiak, W. and Kovalyov, M. (1998), Product Rate Variation Problem and Greatest Common Divisor Property, Working Paper 98-15, Faculty of Business Administration, MUN, St. John's.
    • (1998) Working Paper , vol.98 , Issue.15
    • Kubiak, W.1    Kovalyov, M.2
  • 9
    • 0041937511 scopus 로고
    • A note on "level schedules for mixed-model assembly lines in just-in-time production systems"
    • Kubiak, W. and Sethi S.P. (1991), A Note on "Level schedules for mixed-model assembly lines in just-in-time production systems," Management Science 6, 137-154.
    • (1991) Management Science , vol.6 , pp. 137-154
    • Kubiak, W.1    Sethi, S.P.2
  • 11
    • 0002719797 scopus 로고
    • The Hungarian method for the asignment problem
    • Kuhn, H.W. (1955), The Hungarian method for the asignment problem, Naval Research Logistics Quarterly 2, 83-97.
    • (1955) Naval Research Logistics Quarterly , vol.2 , pp. 83-97
    • Kuhn, H.W.1
  • 13
    • 0001360372 scopus 로고
    • Level schedules for mixed-model assembly lines in just-in-time production systems
    • Miltenburg, J.G. (1989), Level schedules for mixed-model assembly lines in just-in-time production systems, Management Science 35, 192-207.
    • (1989) Management Science , vol.35 , pp. 192-207
    • Miltenburg, J.G.1
  • 14
    • 0003449926 scopus 로고
    • Industrial Engineering and Management Press, Norcross, GA
    • Monden, Y. (1983), Toyota Production Systems, Industrial Engineering and Management Press, Norcross, GA.
    • (1983) Toyota Production Systems
    • Monden, Y.1
  • 15
    • 0041592015 scopus 로고
    • Level schedules for mixed-model, just-in-time production processes
    • Steiner, G. and Yeomans, S. (1993), Level schedules for mixed-model, just-in-time production processes, Management Science 39, 401-418.
    • (1993) Management Science , vol.39 , pp. 401-418
    • Steiner, G.1    Yeomans, S.2
  • 16
    • 0030288023 scopus 로고    scopus 로고
    • Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging
    • Steiner, G. and Yeomans, S. (1996), Optimal Level Schedules in Mixed-Model, Multi-Level JIT Assembly Systems with Pegging, European Journal of Operational Research 95, 38-52.
    • (1996) European Journal of Operational Research , vol.95 , pp. 38-52
    • Steiner, G.1    Yeomans, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.