-
1
-
-
0038664657
-
-
M.Phil. Thesis, Department of Industrial and Manufacturing Systems Engineering, University of Hong Kong, Hong Kong
-
W.Y. Yee, Development of a web-based system for the management of engineering changes, M.Phil. Thesis, Department of Industrial and Manufacturing Systems Engineering, University of Hong Kong, Hong Kong, 1999.
-
(1999)
Development of a Web-based System for the Management of Engineering Changes
-
-
Yee, W.Y.1
-
2
-
-
38249012714
-
Engineering change administration: The key issues
-
Balcerak K.J., Dale B.G. Engineering change administration: the key issues. Computer-Integr. Manuf. Syst. 5(2):1992;125-132.
-
(1992)
Computer-Integr. Manuf. Syst.
, vol.5
, Issue.2
, pp. 125-132
-
-
Balcerak, K.J.1
Dale, B.G.2
-
5
-
-
0020297580
-
The management of engineering change procedure
-
Dale B.G. The management of engineering change procedure. Eng. Manage. Int. 1:1982;201-208.
-
(1982)
Eng. Manage. Int.
, vol.1
, pp. 201-208
-
-
Dale, B.G.1
-
6
-
-
0020107702
-
Engineering change control and implementation considerations
-
Diprima M. Engineering change control and implementation considerations. Prod. Inventory Manage. J. 23(1):1982;81-87.
-
(1982)
Prod. Inventory Manage. J.
, vol.23
, Issue.1
, pp. 81-87
-
-
Diprima, M.1
-
8
-
-
0022792658
-
Engineering changes for made-to-order products: How an MRP II system should handle them
-
Harhalakis G. Engineering changes for made-to-order products: how an MRP II system should handle them. Eng. Manage. Int. 4:1986;19-36.
-
(1986)
Eng. Manage. Int.
, vol.4
, pp. 19-36
-
-
Harhalakis, G.1
-
12
-
-
0026824053
-
The role of the bill-of-materials as a CAD/CAPM interface and the key importance of engineering change control
-
R. Maull, D. Hughes, J. Bennett, The role of the bill-of-materials as a CAD/CAPM interface and the key importance of engineering change control, Comput. Contr. Eng. J. 3 (2) (1992) 63-70.
-
(1992)
Comput. Contr. Eng. J.
, vol.3
, Issue.2
, pp. 63-70
-
-
Maull, R.1
Hughes, D.2
Bennett, J.3
-
15
-
-
0002842504
-
Getting engineering changes under control
-
Nichols K. Getting engineering changes under control. J. Eng. Des. 1(1):1990;1-6.
-
(1990)
J. Eng. Des.
, vol.1
, Issue.1
, pp. 1-6
-
-
Nichols, K.1
-
16
-
-
0026414520
-
Engineering change management in long-lead-time environments
-
Reidelbach M.A. Engineering change management in long-lead-time environments. Prod. Inventory Manage. J. 32(2):1991;84-88.
-
(1991)
Prod. Inventory Manage. J.
, vol.32
, Issue.2
, pp. 84-88
-
-
Reidelbach, M.A.1
-
17
-
-
0027542994
-
Avoiding engineering changes through focused manufacturing knowledge
-
Saeed I., Bowen D.M., Sohoni V.S. Avoiding engineering changes through focused manufacturing knowledge. IEEE Trans. Eng. Manage. 40(1):1993;54-58.
-
(1993)
IEEE Trans. Eng. Manage.
, vol.40
, Issue.1
, pp. 54-58
-
-
Saeed, I.1
Bowen, D.M.2
Sohoni, V.S.3
-
18
-
-
0021614349
-
Engineering changes: A case study
-
Watts F. Engineering changes: a case study. Prod. Inventory Manage. J. 25(4):1984;55-62.
-
(1984)
Prod. Inventory Manage. J.
, vol.25
, Issue.4
, pp. 55-62
-
-
Watts, F.1
-
19
-
-
0002029681
-
A review of research into engineering change management: Implications for product design
-
Wright I.S. A review of research into engineering change management: implications for product design. Des. Stud. 18(1):1997;33-42.
-
(1997)
Des. Stud.
, vol.18
, Issue.1
, pp. 33-42
-
-
Wright, I.S.1
|