메뉴 건너뛰기




Volumn 18, Issue 1, 1997, Pages 33-42

A review of research into engineering change management: Implications for product design

Author keywords

Design management; Engineering change; Product development

Indexed keywords


EID: 0002029681     PISSN: 0142694X     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0142-694x(96)00029-4     Document Type: Article
Times cited : (177)

References (25)
  • 2
    • 0021391449 scopus 로고
    • Automatic engineering change analysis for incremental timing analysis
    • Auch A G and Joosep H 'Automatic engineering change analysis for incremental timing analysis' IBM Technical Disclosure Bulletin Vol 26 No 10A (1984) 5127-5131
    • (1984) IBM Technical Disclosure Bulletin , vol.26 , Issue.10 A , pp. 5127-5131
    • Auch, A.G.1    Joosep, H.2
  • 3
    • 0026258778 scopus 로고
    • Configuration status accounting made affordable
    • Conley D T 'Configuration status accounting made affordable' Naval Engineers Journal Vol 103 No 6 (1991) 63-70
    • (1991) Naval Engineers Journal , vol.103 , Issue.6 , pp. 63-70
    • Conley, D.T.1
  • 6
    • 0028445595 scopus 로고
    • Development and implementation of a design for producability method for precision planar stamped products
    • Schmitz J M and Desa S 'Development and implementation of a design for producability method for precision planar stamped products' Journal of Mechanical Design Vol 16 (1994) 349-356
    • (1994) Journal of Mechanical Design , vol.16 , pp. 349-356
    • Schmitz, J.M.1    Desa, S.2
  • 7
    • 0024138120 scopus 로고
    • Microcomputer planning and control for the small manufacturer: Part II. Execution and support functions
    • Marucheck A S and Peterson D K 'Microcomputer planning and control for the small manufacturer: Part II. execution and support functions' Production and Inventory Management Journal Vol 29 No 3 (1988) 1-5
    • (1988) Production and Inventory Management Journal , vol.29 , Issue.3 , pp. 1-5
    • Marucheck, A.S.1    Peterson, D.K.2
  • 9
    • 0024071182 scopus 로고
    • ECOs: Band-aid fix?
    • Martel M L 'ECOs: Band-aid fix?' Circuits Manufacturing Vol 28 No 9 (1988) 57-60
    • (1988) Circuits Manufacturing , vol.28 , Issue.9 , pp. 57-60
    • Martel, M.L.1
  • 10
    • 0020107702 scopus 로고
    • Engineering change control and implementation considerations
    • DiPrima M R 'Engineering change control and implementation considerations' Production and Inventory Management Vol 23 No 1 (1982) 81-87
    • (1982) Production and Inventory Management , vol.23 , Issue.1 , pp. 81-87
    • DiPrima, M.R.1
  • 12
    • 0026414520 scopus 로고
    • Engineering change management for long-lead-time production environments
    • Reidelbach P E 'Engineering change management for long-lead-time production environments' Production and Inventory Management Journal Vol 32 No 2 (1991) 84-88
    • (1991) Production and Inventory Management Journal , vol.32 , Issue.2 , pp. 84-88
    • Reidelbach, P.E.1
  • 13
    • 0012846911 scopus 로고
    • Simultaneous engineering saves manufacturing lead time, cost and frustration
    • McKnight S W and Jackson J M 'Simultaneous engineering saves manufacturing lead time, cost and frustration' Industrial Engineering Vol 21 No 8 (1989) 25-27
    • (1989) Industrial Engineering , vol.21 , Issue.8 , pp. 25-27
    • McKnight, S.W.1    Jackson, J.M.2
  • 19
    • 0021614349 scopus 로고
    • Engineering changes: A case study
    • Watts F 'Engineering changes: a case study' Production and Inventory Management Vol 2 No 4 (1984) 55-62
    • (1984) Production and Inventory Management , vol.2 , Issue.4 , pp. 55-62
    • Watts, F.1
  • 20
    • 0022792658 scopus 로고
    • Engineering changes for made-to-order products: How an MHP II system should handle them
    • Harhalakis G 'Engineering changes for made-to-order products: how an MHP II system should handle them' Engineering Management International Vol 4 (1986) 19-36
    • (1986) Engineering Management International , vol.4 , pp. 19-36
    • Harhalakis, G.1
  • 21
    • 0001827031 scopus 로고
    • Time - The next source of competitive advantage
    • Stalk G 'Time - the next source of competitive advantage' Harvard Business Review Vol 66 No 4 (1988) 41-51
    • (1988) Harvard Business Review , vol.66 , Issue.4 , pp. 41-51
    • Stalk, G.1
  • 23
    • 0002725436 scopus 로고
    • Industrial dynamics: A major breakthrough for decision makers
    • Forrester J W 'Industrial dynamics: a major breakthrough for decision makers' Harvard Business Review Vol 36 No 4 (1958) 37-66
    • (1958) Harvard Business Review , vol.36 , Issue.4 , pp. 37-66
    • Forrester, J.W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.