메뉴 건너뛰기




Volumn 19, Issue 3, 2003, Pages 225-238

Implementation of concurrent engineering: A survey in Italy and Belgium

Author keywords

Concurrent engineering; International survey

Indexed keywords

AUTOMATION; COMPUTER AIDED DESIGN; PRODUCT DEVELOPMENT; SURVEYS;

EID: 0037501738     PISSN: 07365845     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0736-5845(03)00029-2     Document Type: Article
Times cited : (17)

References (19)
  • 2
    • 0001827031 scopus 로고
    • Time - The next source of competitive advantage
    • July August
    • Stalk G. Time - The Next Source of Competitive Advantage. Harward Business Review, July August, 1988.
    • (1988) Harward Business Review
    • Stalk, G.1
  • 4
    • 0026185859 scopus 로고
    • Making it work calls for input from everyone
    • Concurrent engineering: Special report. (July)
    • Turino J. Making it work calls for input from everyone. Concurrent engineering: Special report. IEEE Spectrum 28 (July), 1991. p. 22-37.
    • (1991) IEEE Spectrum , vol.28 , pp. 22-37
    • Turino, J.1
  • 5
    • 0031235097 scopus 로고    scopus 로고
    • A framework for integration of production management issues and concurrent engineering
    • Portioli A., Singh N. A framework for integration of production management issues and concurrent engineering. Int J Systems Sci. 28(9):1997;877-888.
    • (1997) Int J Systems Sci , vol.28 , Issue.9 , pp. 877-888
    • Portioli, A.1    Singh, N.2
  • 6
    • 3342913328 scopus 로고    scopus 로고
    • Moving the complexity management from the PP&C system to the product design system: A comparison between planning bills and VRP approaches
    • de Weerd-Nederhof PC, Kerssens-van Drogelen IC, Enschede RV, editors
    • Portioli A, Sianesi A. Moving the Complexity Management from the PP&C System to the Product Design System: a comparison between planning bills and VRP approaches. In: de Weerd-Nederhof PC, Kerssens-van Drogelen IC, Enschede RV, editors. Managing the R&D Process.
    • Managing the R&D Process
    • Portioli, A.1    Sianesi, A.2
  • 10
    • 0037820828 scopus 로고    scopus 로고
    • The people's company
    • December 3, EB 11-7
    • Hof R. The People's Company.Business Week, December 3, 2001. EB 11-7.
    • (2001) Business Week
    • Hof, R.1
  • 11
    • 0030387171 scopus 로고    scopus 로고
    • The development of a generic framework for the implementation of concurrent engineering
    • Driva H., Pawar K. The development of a generic framework for the implementation of concurrent engineering. Int J Comput Appl Technol. 9(4):1996;165-173.
    • (1996) Int J Comput Appl Technol , vol.9 , Issue.4 , pp. 165-173
    • Driva, H.1    Pawar, K.2
  • 14
    • 0037820834 scopus 로고    scopus 로고
    • Statistical analysis of concurrent engineering success factors and results
    • Valencia
    • Van Landeghem R, Roels T. Statistical analysis of Concurrent Engineering success factors and results. Proceedings of ECEC'01, Valencia 2001. p. 206-10.
    • (2001) Proceedings of ECEC'01 , pp. 206-210
    • Van Landeghem, R.1    Roels, T.2
  • 15
  • 16
    • 0038158549 scopus 로고    scopus 로고
    • Suitability of available IT, & tools for CE: A European assessment
    • Cambridge
    • Pallot PM. Suitability of available IT, & tools for CE: A European assessment, Proceedings of CEE'96, Cambridge, 1996.
    • (1996) Proceedings of CEE'96
    • Pallot, P.M.1
  • 17
    • 0033895056 scopus 로고    scopus 로고
    • Experiences with a concurrent engineering self-assessment tool
    • Van Landeghem R. Experiences with a concurrent engineering self-assessment tool. Int J Prod Econ. 64:2000;295-309.
    • (2000) Int J Prod Econ , vol.64 , pp. 295-309
    • Van Landeghem, R.1
  • 19
    • 3543058709 scopus 로고    scopus 로고
    • Concurrent new product development: An empirical assessment
    • Maylor H. Concurrent new product development. an empirical assessment Int J Oper Prod Manag. 17(12):1997;1196-1214.
    • (1997) Int J Oper Prod Manag , vol.17 , Issue.12 , pp. 1196-1214
    • Maylor, H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.