-
1
-
-
0030386923
-
Constraint network approach to the design and manufacture of labels in a high variety label printing environment
-
Awoeala, A. O., and Singh, N., 1996, Constraint network approach to the design and manufacture of labels in a high variety label printing environment. Journal of Intelligent Manufacturing, 7, 1-16.
-
(1996)
Journal of Intelligent Manufacturing
, vol.7
, pp. 1-16
-
-
Awoeala, A.O.1
Singh, N.2
-
2
-
-
0000955243
-
A hierachical bicriterion approach to integrated process plan selection and job shop scheduling
-
Brandimarte, P., and Calderini, M., 1995, A hierachical bicriterion approach to integrated process plan selection and job shop scheduling. International Journal of Production Research, 33, 161— 181.
-
(1995)
International Journal of Production Research
, vol.33
-
-
Brandimarte, P.1
Calderini, M.2
-
3
-
-
0006862373
-
-
Milan, Italy: Hoepli)
-
Brandolhse, A., Pozetti, A., and Sianesi, A., 1991, Gestione della Produzione Industrial (Milan, Italy: Hoepli).
-
(1991)
Gestione Della Produzione Industrial
-
-
Brandolhse, A.1
Pozetti, A.2
Sianesi, A.3
-
4
-
-
0025403241
-
Least cost tolerance allocation for mechanical assemblies with automated process selection
-
Chase, K. W., Greenwood, W. H., Loosli, B. G., Hauglund, L. F., 1990, Least cost tolerance allocation for mechanical assemblies with automated process selection. Manufacturing Review, 3, 49-59.
-
(1990)
Manufacturing Review
, vol.3
, pp. 49-59
-
-
Chase, K.W.1
Greenwood, W.H.2
Loosli, B.G.3
Hauglund, L.F.4
-
7
-
-
33746031638
-
Integration of process planning and scheduling functions
-
Khoshnevis, B., and Chen, Q. M., 1990, Integration of process planning and scheduling functions. Journal of Intelligent Manufacturing, 1, 165-176.
-
(1990)
Journal of Intelligent Manufacturing
, vol.1
, pp. 165-176
-
-
Khoshnevis, B.1
Chen, Q.M.2
-
8
-
-
0028462998
-
Impact of sequence dependent setup time on job shop scheduling performance
-
Kim, S. C., and Bobrowski, P. M., 1994, Impact of sequence dependent setup time on job shop scheduling performance. International Journal of Production Research, 32, 1503-1520.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 1503-1520
-
-
Kim, S.C.1
Bobrowski, P.M.2
-
9
-
-
3342987684
-
Concurrent engineering: Issues, models, and solution approaches
-
edited by R. Dorf and A. Kusiak (New York: Wiley)
-
Kusiak, A., 1994, Concurrent engineering: issues, models, and solution approaches. HAndbook of Design, Manufacturing and Automation, edited by R. Dorf and A. Kusiak (New York: Wiley), pp. 35- 49.
-
(1994)
Handbook of Design, Manufacturing and Automation
-
-
Kusiak, A.1
-
10
-
-
0028598950
-
Design of products for an agile manufacturing environment
-
Kusiak, A., and Feng, C., 1994, Design of products for an agile manufacturing environment. Computers in Engineering (ASME), 1, 413-420.
-
(1994)
Computers in Engineering (ASME)
, vol.1
, pp. 413-420
-
-
Kusiak, A.1
Feng, C.2
-
11
-
-
0028766749
-
Design of components for schedulability
-
Kusiak, A., and He, W., 1994, Design of components for schedulability. European Journal of Operational Research, 76, 49-59.
-
(1994)
European Journal of Operational Research
, vol.76
, pp. 49-59
-
-
Kusiak, A.1
He, W.2
-
12
-
-
0026910349
-
Dynamic planning enriches concurrent process and production planning
-
Larsen, N. E., and Alting, L., 1992, Dynamic planning enriches concurrent process and production planning. International Journal of Production Research, 30, 1861-1876.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 1861-1876
-
-
Larsen, N.E.1
Alting, L.2
-
13
-
-
0026435757
-
Applied methods for integration of process planning and production control
-
Larsen, N. E., and Clausen, J., 1992, Applied methods for integration of process planning and production control. Manufacturing International (ASME), 1, 349-364.
-
(1992)
Manufacturing International (ASME)
, vol.1
, pp. 349-364
-
-
Larsen, N.E.1
Clausen, J.2
-
14
-
-
3342932614
-
Towards concurrency and integration in the construction industry
-
Toronto, Canada, 26-29 August
-
Love, P., and Gunasekaran G, 1996, Towards concurrency and integration in the construction industry, Proceedings of the Third International Conference on Concurrent Engineering, Toronto, Canada, 26-29 August.
-
(1996)
Proceedings of the Third International Conference on Concurrent Engineering
-
-
Love, P.1
Gunasekaran, G.2
-
15
-
-
0004206344
-
-
(Homewood, Illinois, U.S.A.: Dow Jones-Irwin)
-
Mather, H., 1987, Bills of Materials, (Homewood, Illinois, U.S.A.: Dow Jones-Irwin).
-
(1987)
Bills of Materials
-
-
Mather, H.1
-
16
-
-
0026439651
-
An introduction to an integrated process planning model
-
Mallur, S., Mei, J., Xhang, H., 1992, An introduction to an integrated process planning model. Manufacturing International (ASME), 1, 335-347.
-
(1992)
Manufacturing International (ASME)
, vol.1
, pp. 335-347
-
-
Mallur, S.1
Mei, J.2
Xhang, H.3
-
17
-
-
0025482435
-
Job shop scheduling with alternative machines
-
Nasr, N., and Elsayed, E. A., 1990, Job shop scheduling with alternative machines. International Journal of Production Research, 28, 1595-1609.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 1595-1609
-
-
Nasr, N.1
Elsayed, E.A.2
-
18
-
-
0029732560
-
An enhanced loading model for the probabilistic workload control under workload unbalancement
-
Perona, M., and Portioli, A., 1996, An enhanced loading model for the probabilistic workload control under workload unbalancement. Production Planning and Control, 7(1), 68-78.
-
(1996)
Production Planning and Control
, vol.7
, Issue.1
, pp. 68-78
-
-
Perona, M.1
Portioli, A.2
-
19
-
-
3342913328
-
Moving the complexity management from the PP&C system to the product design system: A comparison between planning bills and VRP approaches
-
edited by Petra C. de Weerd-Nederhof, Inge C. Kerssens-van Drogelen, Roberto Verganti (Enschede)
-
Portioli, A., and Sianesi, A., 1994, Moving the complexity management from the PP&C system to the product design system: a comparison between planning bills and VRP approaches. Managing the R&D Process, edited by Petra C. de Weerd-Nederhof, Inge C. Kerssens-van Drogelen, Roberto Verganti (Enschede).
-
(1994)
Managing the R&D Process
-
-
Portioli, A.1
Sianesi, A.2
-
21
-
-
0028460275
-
Concurrent engineering in a high variety label printing environment
-
Singh, N., and Wang, M. H., 1994, Concurrent engineering in a high variety label printing environment. International Journal of Production Research, 32, 1675-1691.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 1675-1691
-
-
Singh, N.1
Wang, M.H.2
-
22
-
-
0001827031
-
Time—the next source of competitive advantage
-
July-August
-
Stalk, G., 1988, Time—the next source of competitive advantage. Harard Business Review, July-August.
-
(1988)
Harard Business Review
-
-
Stalk, G.1
-
24
-
-
0009468997
-
-
(Cambridge, Massachusetts, U.S.A.: Productivity Press)
-
Suzue, T., and Kohdate, A., 1990, Variety Reduction Program (Cambridge, Massachusetts, U.S.A.: Productivity Press).
-
(1990)
Variety Reduction Program
-
-
Suzue, T.1
Kohdate, A.2
-
25
-
-
0002307066
-
Making it work calls for input from everyone, concurrent engineering: Special report
-
Turino, J., 1991, Making it work calls for input from everyone, concurrent engineering: Special report. IEEE Spectrum, 28, 22-37.
-
(1991)
IEEE Spectrum
, vol.28
, pp. 22-37
-
-
Turino, J.1
-
26
-
-
0027733474
-
A methodology for integrated process-production planning (1P3)
-
Edited by I. Pappas and I. Tat- siopoulos (Amsterdam: North-Holland
-
Villa, A., and Rossetto, S., 1993, A methodology for integrated process-production planning (1P3). In IFIP Transactions. Advances in Production management Systems. Edited by I. Pappas and I. Tat- siopoulos (Amsterdam: North-Holland).
-
(1993)
IFIP Transactions. Advances in Production Management Systems
-
-
Villa, A.1
Rossetto, S.2
-
27
-
-
0021898921
-
Effectiveness of alternate operations in a flexible manufacturing system
-
Wilhelm, W. E., and Shin, H., 1985, Effectiveness of alternate operations in a flexible manufacturing system. International Journal of Production Research, 23, 65-79.
-
(1985)
International Journal of Production Research
, vol.23
, pp. 65-79
-
-
Wilhelm, W.E.1
Shin, H.2
|