메뉴 건너뛰기




Volumn 44, Issue 3, 2003, Pages 325-338

Flexible 4-day workweek scheduling with weekend work frequency constraints

Author keywords

Integer programming; Labor scheduling; Optimization; Staffing

Indexed keywords

COMPUTATIONAL METHODS; INTEGER PROGRAMMING; OPTIMIZATION; PROBLEM SOLVING; SCHEDULING;

EID: 0037352880     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0360-8352(02)00192-4     Document Type: Article
Times cited : (18)

References (16)
  • 1
    • 0032210066 scopus 로고    scopus 로고
    • An efficient two-phase algorithm for cyclic days-off scheduling
    • Alfares H.K. An efficient two-phase algorithm for cyclic days-off scheduling. Computers and Operations Research. 25:1998;913-923.
    • (1998) Computers and Operations Research , vol.25 , pp. 913-923
    • Alfares, H.K.1
  • 3
    • 0031223441 scopus 로고    scopus 로고
    • Integrated project task and manpower scheduling
    • Alfares H.K., Bailey J.E. Integrated project task and manpower scheduling. IIE Transactions. 29:1997;711-718.
    • (1997) IIE Transactions , vol.29 , pp. 711-718
    • Alfares, H.K.1    Bailey, J.E.2
  • 4
    • 0016091890 scopus 로고
    • Scheduling a full-time workforce to meet cyclic staffing requirements
    • Baker K.R. Scheduling a full-time workforce to meet cyclic staffing requirements. Management Science. 20:1974;1561-1568.
    • (1974) Management Science , vol.20 , pp. 1561-1568
    • Baker, K.R.1
  • 5
    • 0017547182 scopus 로고
    • Workforce scheduling with cyclic demands and days-off constraints
    • Baker K.B., Magazine M.J. Workforce scheduling with cyclic demands and days-off constraints. Management Science. 24:1977;161-167.
    • (1977) Management Science , vol.24 , pp. 161-167
    • Baker, K.B.1    Magazine, M.J.2
  • 6
  • 7
    • 0033116330 scopus 로고    scopus 로고
    • Integer programming to schedule a hierarchical workforce with variable demands
    • Billionnet A. Integer programming to schedule a hierarchical workforce with variable demands. European Journal of Operational Research. 114:1999;105-114.
    • (1999) European Journal of Operational Research , vol.114 , pp. 105-114
    • Billionnet, A.1
  • 8
    • 0016872537 scopus 로고
    • Scheduling work forces required in continuous operations under alternative labor policies
    • Brownell W.S., Lowerre J.M. Scheduling work forces required in continuous operations under alternative labor policies. Management Science. 22:1976;597-605.
    • (1976) Management Science , vol.22 , pp. 597-605
    • Brownell, W.S.1    Lowerre, J.M.2
  • 9
    • 0000482113 scopus 로고
    • Manpower scheduling with variable demands and alternative weekends off
    • Burns R.N. Manpower scheduling with variable demands and alternative weekends off. INFOR. 16:1978;101-111.
    • (1978) INFOR , vol.16 , pp. 101-111
    • Burns, R.N.1
  • 10
    • 0032314345 scopus 로고    scopus 로고
    • A set processing algorithm for scheduling staff on 4-day or 3-day work weeks
    • Burns R.N., Narasimhan R., Smith L.D. A set processing algorithm for scheduling staff on 4-day or 3-day work weeks. Naval Research Logistics. 45:1998;839-853.
    • (1998) Naval Research Logistics , vol.45 , pp. 839-853
    • Burns, R.N.1    Narasimhan, R.2    Smith, L.D.3
  • 11
    • 0012655189 scopus 로고
    • Single-shift scheduling under a compressed workweek
    • Hung R. Single-shift scheduling under a compressed workweek. Omega. 19:1991;494-497.
    • (1991) Omega , vol.19 , pp. 494-497
    • Hung, R.1
  • 12
    • 0028516324 scopus 로고
    • Single-shift off-day scheduling of a hierarchical workforce with variable demands
    • Hung R. Single-shift off-day scheduling of a hierarchical workforce with variable demands. European Journal of Operational Research. 78:1994;49-57.
    • (1994) European Journal of Operational Research , vol.78 , pp. 49-57
    • Hung, R.1
  • 13
    • 84986156412 scopus 로고    scopus 로고
    • Changing schedules: A case for alternative work schedules
    • Lankford W.M. Changing schedules: A case for alternative work schedules. Career Development International. 3:1998;161-163.
    • (1998) Career Development International , vol.3 , pp. 161-163
    • Lankford, W.M.1
  • 15
    • 0030836092 scopus 로고    scopus 로고
    • Algorithm for a single shift scheduling of hierarchical workforce
    • Narasimhan R. Algorithm for a single shift scheduling of hierarchical workforce. European Journal of Operational Research. 96:1997;113-121.
    • (1997) European Journal of Operational Research , vol.96 , pp. 113-121
    • Narasimhan, R.1
  • 16
    • 0001381381 scopus 로고
    • The cost of consecutivity in the (5,7) cyclic staffing problem
    • Vohra R.V. The cost of consecutivity in the (5,7) cyclic staffing problem. IIE Transactions. 29:1987;942-950.
    • (1987) IIE Transactions , vol.29 , pp. 942-950
    • Vohra, R.V.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.