|
Volumn 40, Issue 15 SPEC., 2002, Pages 3945-3953
|
A study on setting standard time using work achievement quotient
|
Author keywords
[No Author keywords available]
|
Indexed keywords
INSPECTION;
JOB ANALYSIS;
JOB SATISFACTION;
PERSONNEL RATING;
PERSONNEL TRAINING;
SAMPLING;
STATISTICAL METHODS;
TIME MEASUREMENT;
TRUCKS;
FORK LIFT TRUCKS;
METHOD TIME MEASUREMENTS;
PREDETERMINED TIME SYSTEM;
STANDARD TIME;
STOPWATCH METHOD;
VEHICLE SAFETY INSPECTION;
WORK ACHIEVEMENT QUOTIENT;
WORK FACTOR;
TIME AND MOTION STUDY;
|
EID: 0037109659
PISSN: 00207543
EISSN: None
Source Type: Journal
DOI: 10.1080/00207540210159581 Document Type: Article |
Times cited : (14)
|
References (14)
|