메뉴 건너뛰기




Volumn 80, Issue 3, 2002, Pages 231-248

A two-stage model for the design of supply chain networks

Author keywords

Capacity; Optimization model; Supplier selection; Supply chain

Indexed keywords

CONSTRAINT THEORY; CUSTOMER SATISFACTION; DECISION MAKING; INTEGER PROGRAMMING; OPTIMIZATION;

EID: 0037065230     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0925-5273(02)00260-8     Document Type: Article
Times cited : (112)

References (27)
  • 3
    • 0030735410 scopus 로고    scopus 로고
    • Price-based planning and scheduling of multiproduct orders in symbiotic manufacturing networks
    • D'Amours S., Monreuil B., Soumis F. Price-based planning and scheduling of multiproduct orders in symbiotic manufacturing networks. European Journal of Operational Research. 96:1996;148-166.
    • (1996) European Journal of Operational Research , vol.96 , pp. 148-166
    • D'Amours, S.1    Monreuil, B.2    Soumis, F.3
  • 5
    • 0032777406 scopus 로고    scopus 로고
    • System design framework for the extended enterprise
    • Davis M., O'Sulivan D. System design framework for the extended enterprise. Production Planning and Control. 10(1):1999;3-18.
    • (1999) Production Planning and Control , vol.10 , Issue.1 , pp. 3-18
    • Davis, M.1    O'Sulivan, D.2
  • 6
    • 0034298366 scopus 로고    scopus 로고
    • A basis for modeling the costs of supplier selection: The economic tender quantity
    • De Boer L., Telgen J. A basis for modeling the costs of supplier selection. The economic tender quantity Journal of the Operational Research Society. 51:2000;1128-1135.
    • (2000) Journal of the Operational Research Society , vol.51 , pp. 1128-1135
    • De Boer, L.1    Telgen, J.2
  • 8
    • 0032628965 scopus 로고    scopus 로고
    • Pricing and lead time decisions for make-to-order firms with contingent orders
    • Easton F.F., Moodie D.R. Pricing and lead time decisions for make-to-order firms with contingent orders. European Journal of Operational Research. 116:1999;305-318.
    • (1999) European Journal of Operational Research , vol.116 , pp. 305-318
    • Easton, F.F.1    Moodie, D.R.2
  • 10
  • 11
    • 0000462230 scopus 로고
    • Antecedents of lead time competitiveness in make-to-order manufacturing firms
    • Handfield R.B., Panesh R.T. Antecedents of lead time competitiveness in make-to-order manufacturing firms. International Journal of Production Research. 33(2):1995;511-537.
    • (1995) International Journal of Production Research , vol.33 , Issue.2 , pp. 511-537
    • Handfield, R.B.1    Panesh, R.T.2
  • 12
    • 0027147723 scopus 로고
    • Customer enquiry management: Part of a hierarchical system to control lead times in make-to-order companies
    • Hendry L.C., Kingsman B.G. Customer enquiry management. Part of a hierarchical system to control lead times in make-to-order companies Journal of the Operational Research Society. 44(1):1994;61-70.
    • (1994) Journal of the Operational Research Society , vol.44 , Issue.1 , pp. 61-70
    • Hendry, L.C.1    Kingsman, B.G.2
  • 17
    • 0000006895 scopus 로고    scopus 로고
    • Demand management: The evaluation of price and due date negotiation strategies using simulation
    • Moodie D.R. Demand management. The evaluation of price and due date negotiation strategies using simulation Production and Operation Management. 8:1999;151-162.
    • (1999) Production and Operation Management , vol.8 , pp. 151-162
    • Moodie, D.R.1
  • 19
    • 0001610038 scopus 로고
    • The job shop scheduling problem: A concise survey and some recent developments
    • Wiley, London
    • Pinson E. The job shop scheduling problem. A concise survey and some recent developments Scheduling Theory and its Application. 1995;277-294 Wiley, London.
    • (1995) Scheduling Theory and its Application , pp. 277-294
    • Pinson, E.1
  • 23
    • 0011513731 scopus 로고    scopus 로고
    • Mulyowidodo simultaneous production planning and scheduling in job-shop fabrication system
    • in Indonesian
    • Toha I.S., Taroepratjeka H., Aroef M. Mulyowidodo simultaneous production planning and scheduling in job-shop fabrication system. Journal of Industrial Engineering and Management. 17:1997;1-8. (in Indonesian).
    • (1997) Journal of Industrial Engineering and Management , vol.17 , pp. 1-8
    • Toha, I.S.1    Taroepratjeka, H.2    Aroef, M.3
  • 27
    • 0032656380 scopus 로고    scopus 로고
    • Strategies for integrating lead time and customer-order decision
    • Weng K. Strategies for integrating lead time and customer-order decision. IIE Transactions. 31(2):1999;161-171.
    • (1999) IIE Transactions , vol.31 , Issue.2 , pp. 161-171
    • Weng, K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.