메뉴 건너뛰기




Volumn 109, Issue 1, 1998, Pages 122-136

Lead time selection and the behaviour of work flow in job shops

Author keywords

Forecasting; Production; Queues; Scheduling; Simulation

Indexed keywords


EID: 0000728790     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(97)00013-1     Document Type: Article
Times cited : (8)

References (43)
  • 1
    • 0021496929 scopus 로고
    • Sequencing and due-date assignments in a job shop
    • Baker, K.R. (1984), "Sequencing and due-date assignments in a job shop", Management Science 30, 1093-1104.
    • (1984) Management Science , vol.30 , pp. 1093-1104
    • Baker, K.R.1
  • 2
    • 0016962280 scopus 로고
    • Critical ratio scheduling with queue waiting time information: An experimental analysis
    • Berry, W.L., and Finlay, R.A. (1976), "Critical ratio scheduling with queue waiting time information: An experimental analysis", AIIE Transactions 8, 161-168.
    • (1976) AIIE Transactions , vol.8 , pp. 161-168
    • Berry, W.L.1    Finlay, R.A.2
  • 3
    • 0002098611 scopus 로고
    • The use of workload information to control job lateness in controlled and uncontrolled release production systems
    • Bertrand, J.W.M. (1983a), "The use of workload information to control job lateness in controlled and uncontrolled release production systems", Journal of Operations Management 3, 79-92.
    • (1983) Journal of Operations Management , vol.3 , pp. 79-92
    • Bertrand, J.W.M.1
  • 4
    • 0020783525 scopus 로고
    • The effect of workload dependent due-dates on job shop performance
    • Bertrand, J.W.M. (1983b), "The effect of workload dependent due-dates on job shop performance", Management Science 29, 799-816.
    • (1983) Management Science , vol.29 , pp. 799-816
    • Bertrand, J.W.M.1
  • 8
    • 0001173520 scopus 로고
    • Priority dispatching and work-in-process inventory in a job shop
    • Conway, R.W. (1965), "Priority dispatching and work-in-process inventory in a job shop", Journal of Industrial Engineering 16, 123-130.
    • (1965) Journal of Industrial Engineering , vol.16 , pp. 123-130
    • Conway, R.W.1
  • 10
    • 0015476399 scopus 로고
    • A dispatching methodology for balancing workload assignments in a job shop production facility
    • Deane, R.H., and Moodie, C.L. (1972), "A dispatching methodology for balancing workload assignments in a job shop production facility", AIIE Transactions 4, 277-283.
    • (1972) AIIE Transactions , vol.4 , pp. 277-283
    • Deane, R.H.1    Moodie, C.L.2
  • 11
    • 0002987480 scopus 로고
    • Quoting customer lead times
    • Duenyas, I., and Hopp, W.J. (1995), "Quoting customer lead times", Management Science 41, 43-57.
    • (1995) Management Science , vol.41 , pp. 43-57
    • Duenyas, I.1    Hopp, W.J.2
  • 13
    • 0027657253 scopus 로고
    • Job shop flowtime prediction and tardiness control using queuing analysis
    • Enns, S.T. (1993), "Job shop flowtime prediction and tardiness control using queuing analysis", International Journal of Production Research 31, 2045-2057.
    • (1993) International Journal of Production Research , vol.31 , pp. 2045-2057
    • Enns, S.T.1
  • 14
    • 0000538802 scopus 로고
    • Job shop leadtime requirements under conditions of controlled delivery performance
    • Enns, S.T. (1994), "Job shop leadtime requirements under conditions of controlled delivery performance", European Journal of Operational Research 11, 429-439.
    • (1994) European Journal of Operational Research , vol.11 , pp. 429-439
    • Enns, S.T.1
  • 15
    • 0001153814 scopus 로고
    • A dynamic forecasting model for job shop flowtime prediction and tardiness control
    • Enns, S.T. (1995a), "A dynamic forecasting model for job shop flowtime prediction and tardiness control", International Journal of Production Research 33, 1295-1312.
    • (1995) International Journal of Production Research , vol.33 , pp. 1295-1312
    • Enns, S.T.1
  • 16
    • 0002992336 scopus 로고
    • An economic approach to job shop performance analysis
    • Enns, S.T. (1995b), "An economic approach to job shop performance analysis", International Journal of Production Economics 38, 117-131.
    • (1995) International Journal of Production Economics , vol.38 , pp. 117-131
    • Enns, S.T.1
  • 17
    • 0024680497 scopus 로고
    • Due date assignment in a multistage job shop
    • Fry, T.D., Philipoom, P.R., and Markland, R.E. (1989), "Due date assignment in a multistage job shop", IEE Transactions 21, 153-161.
    • (1989) IEE Transactions , vol.21 , pp. 153-161
    • Fry, T.D.1    Philipoom, P.R.2    Markland, R.E.3
  • 18
    • 0017246996 scopus 로고
    • Due-dates and instantaneous load in the one-machine shop
    • Heard, E.L. (1976), "Due-dates and instantaneous load in the one-machine shop", Management Science 23, 444-450.
    • (1976) Management Science , vol.23 , pp. 444-450
    • Heard, E.L.1
  • 19
    • 0001930641 scopus 로고
    • Job shop-like queuing systems
    • Jackson, J.R. (1963), "Job shop-like queuing systems", Management Science 10, 131-142.
    • (1963) Management Science , vol.10 , pp. 131-142
    • Jackson, J.R.1
  • 20
    • 0015681904 scopus 로고
    • An economic evaluation of job shop dispatching rules
    • Jones, C.H. (1973), "An economic evaluation of job shop dispatching rules", Management Science 20, 293-307.
    • (1973) Management Science , vol.20 , pp. 293-307
    • Jones, C.H.1
  • 21
    • 0024656096 scopus 로고
    • Manufacturing systems with forbidden early shipment: Implications for setting manufacturing lead times
    • Kanet, J.J., and Christy, D.P. (1989), "Manufacturing systems with forbidden early shipment: Implications for setting manufacturing lead times", International Journal of Production Research 27, 783-792.
    • (1989) International Journal of Production Research , vol.27 , pp. 783-792
    • Kanet, J.J.1    Christy, D.P.2
  • 22
    • 0012298197 scopus 로고
    • Priority dispatch rules with operation due dates in a job shop
    • Kanet, J.J., and Hayya, J.C. (1982), "Priority dispatch rules with operation due dates in a job shop", Journal of Operations Management 2, 167-175.
    • (1982) Journal of Operations Management , vol.2 , pp. 167-175
    • Kanet, J.J.1    Hayya, J.C.2
  • 23
    • 0029393210 scopus 로고
    • Estimating flowtimes and setting due-dates in complex production systems
    • Lawrence, S.R. (1995), "Estimating flowtimes and setting due-dates in complex production systems", IIE Transactions 27, 657-668.
    • (1995) IIE Transactions , vol.27 , pp. 657-668
    • Lawrence, S.R.1
  • 24
    • 0000861722 scopus 로고
    • A proof of the queuing formula: L = λW
    • Little, J.D.C. (1961), "A proof of the queuing formula: L = λW", Operations Research 3, 383-387.
    • (1961) Operations Research , vol.3 , pp. 383-387
    • Little, J.D.C.1
  • 27
    • 0000809619 scopus 로고
    • Load smoothing by the planning and order review/release systems: A simulation experiment
    • Melnyk, S.A., Ragatz, G.L., and Fredendall, L. (1991), "Load smoothing by the planning and order review/release systems: A simulation experiment", Journal of Operations Management 10, 512-523.
    • (1991) Journal of Operations Management , vol.10 , pp. 512-523
    • Melnyk, S.A.1    Ragatz, G.L.2    Fredendall, L.3
  • 29
    • 0019540666 scopus 로고
    • Combined scheduling system for reducing job tardiness in a job shop
    • Miyazaki, S. (1981), "Combined scheduling system for reducing job tardiness in a job shop", International Journal of Production Research 19, 201-211.
    • (1981) International Journal of Production Research , vol.19 , pp. 201-211
    • Miyazaki, S.1
  • 31
  • 32
    • 84985757538 scopus 로고
    • An evaluation of order release mechanisms in a job-shop environment
    • Ragatz, G.L., and Mabert, V.A. (1988), "An evaluation of order release mechanisms in a job-shop environment", Decision Sciences 19, 167-189.
    • (1988) Decision Sciences , vol.19 , pp. 167-189
    • Ragatz, G.L.1    Mabert, V.A.2
  • 34
    • 0019560165 scopus 로고
    • Due-date assignment for production systems
    • Seidmann, A., and Smith, M.L. (1980), "Due-date assignment for production systems", Management Science 27, 571-581.
    • (1980) Management Science , vol.27 , pp. 571-581
    • Seidmann, A.1    Smith, M.L.2
  • 35
    • 0024064120 scopus 로고
    • Approximations for the time spent in a dynamic job shop with application to due-date assignment
    • Shanthikumar, J.G., and Sumita, U. (1988), "Approximations for the time spent in a dynamic job shop with application to due-date assignment", International Journal of Production Research 26, 1329-1352.
    • (1988) International Journal of Production Research , vol.26 , pp. 1329-1352
    • Shanthikumar, J.G.1    Sumita, U.2
  • 36
    • 21844517678 scopus 로고
    • From CAN-Q to MPX: Evolution of queuing software for manufacturing
    • Suri, R., Diehl, G., and de Treville, S. (1995), "From CAN-Q to MPX: Evolution of queuing software for manufacturing", Interfaces 25, 128-150.
    • (1995) Interfaces , vol.25 , pp. 128-150
    • Suri, R.1    Diehl, G.2    De Treville, S.3
  • 38
  • 39
    • 0018454859 scopus 로고
    • A simulation of predictable due-dates
    • Weeks, J.K., (1979), "A simulation of predictable due-dates", Management Science 25, 363-373.
    • (1979) Management Science , vol.25 , pp. 363-373
    • Weeks, J.K.1
  • 40
    • 0001200692 scopus 로고
    • Due-date setting and priority sequencing in a multiclass M/G/1 queue
    • Wein, L.M. (1991), "Due-date setting and priority sequencing in a multiclass M/G/1 queue", Management Science 37, 834-850.
    • (1991) Management Science , vol.37 , pp. 834-850
    • Wein, L.M.1
  • 41
    • 0026884810 scopus 로고
    • A broader view of the job-shop scheduling problem
    • Wein, L.W., and Chevalier, P.B. (1992), "A broader view of the job-shop scheduling problem", Management Science 38, 1018-1033.
    • (1992) Management Science , vol.38 , pp. 1018-1033
    • Wein, L.W.1    Chevalier, P.B.2
  • 43
    • 0020941581 scopus 로고
    • Modifying job sequencing rules for work-in-process inventory reduction
    • Wilson, H.G., and Mardis, B.J. (1983), "Modifying job sequencing rules for work-in-process inventory reduction", IIE Transactions 15, 320-323.
    • (1983) IIE Transactions , vol.15 , pp. 320-323
    • Wilson, H.G.1    Mardis, B.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.