-
1
-
-
0021496929
-
Sequencing and due-date assignments in a job shop
-
Baker, K.R. (1984), "Sequencing and due-date assignments in a job shop", Management Science 30, 1093-1104.
-
(1984)
Management Science
, vol.30
, pp. 1093-1104
-
-
Baker, K.R.1
-
2
-
-
0016962280
-
Critical ratio scheduling with queue waiting time information: An experimental analysis
-
Berry, W.L., and Finlay, R.A. (1976), "Critical ratio scheduling with queue waiting time information: An experimental analysis", AIIE Transactions 8, 161-168.
-
(1976)
AIIE Transactions
, vol.8
, pp. 161-168
-
-
Berry, W.L.1
Finlay, R.A.2
-
3
-
-
0002098611
-
The use of workload information to control job lateness in controlled and uncontrolled release production systems
-
Bertrand, J.W.M. (1983a), "The use of workload information to control job lateness in controlled and uncontrolled release production systems", Journal of Operations Management 3, 79-92.
-
(1983)
Journal of Operations Management
, vol.3
, pp. 79-92
-
-
Bertrand, J.W.M.1
-
4
-
-
0020783525
-
The effect of workload dependent due-dates on job shop performance
-
Bertrand, J.W.M. (1983b), "The effect of workload dependent due-dates on job shop performance", Management Science 29, 799-816.
-
(1983)
Management Science
, vol.29
, pp. 799-816
-
-
Bertrand, J.W.M.1
-
5
-
-
0022160975
-
Setting job-shop due-dates with service-level constraints
-
Bookbinder, J.H., and Noor, A.I. (1985), "Setting job-shop due-dates with service-level constraints", Journal of the Operational Research Society 36, 1017-1026.
-
(1985)
Journal of the Operational Research Society
, vol.36
, pp. 1017-1026
-
-
Bookbinder, J.H.1
Noor, A.I.2
-
7
-
-
0024303531
-
Survey of scheduling research involving due date decisions
-
Cheng, T.C.E., and Gupta, M.C. (1989), "Survey of scheduling research involving due date decisions", European Journal of Operational Research 38, 156-166.
-
(1989)
European Journal of Operational Research
, vol.38
, pp. 156-166
-
-
Cheng, T.C.E.1
Gupta, M.C.2
-
8
-
-
0001173520
-
Priority dispatching and work-in-process inventory in a job shop
-
Conway, R.W. (1965), "Priority dispatching and work-in-process inventory in a job shop", Journal of Industrial Engineering 16, 123-130.
-
(1965)
Journal of Industrial Engineering
, vol.16
, pp. 123-130
-
-
Conway, R.W.1
-
9
-
-
0004113622
-
-
Addison-Wesley, Reading, MA
-
Conway, R.W., Maxwell, W.L., and Miller, L.W. (1967), Theory of Scheduling, Addison-Wesley, Reading, MA.
-
(1967)
Theory of Scheduling
-
-
Conway, R.W.1
Maxwell, W.L.2
Miller, L.W.3
-
10
-
-
0015476399
-
A dispatching methodology for balancing workload assignments in a job shop production facility
-
Deane, R.H., and Moodie, C.L. (1972), "A dispatching methodology for balancing workload assignments in a job shop production facility", AIIE Transactions 4, 277-283.
-
(1972)
AIIE Transactions
, vol.4
, pp. 277-283
-
-
Deane, R.H.1
Moodie, C.L.2
-
11
-
-
0002987480
-
Quoting customer lead times
-
Duenyas, I., and Hopp, W.J. (1995), "Quoting customer lead times", Management Science 41, 43-57.
-
(1995)
Management Science
, vol.41
, pp. 43-57
-
-
Duenyas, I.1
Hopp, W.J.2
-
12
-
-
0016929914
-
Due dates in job shop scheduling
-
Eilon, S., and Chowdhury, I.G. (1976), "Due dates in job shop scheduling", International Journal of Production Research 14, 223-237.
-
(1976)
International Journal of Production Research
, vol.14
, pp. 223-237
-
-
Eilon, S.1
Chowdhury, I.G.2
-
13
-
-
0027657253
-
Job shop flowtime prediction and tardiness control using queuing analysis
-
Enns, S.T. (1993), "Job shop flowtime prediction and tardiness control using queuing analysis", International Journal of Production Research 31, 2045-2057.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 2045-2057
-
-
Enns, S.T.1
-
14
-
-
0000538802
-
Job shop leadtime requirements under conditions of controlled delivery performance
-
Enns, S.T. (1994), "Job shop leadtime requirements under conditions of controlled delivery performance", European Journal of Operational Research 11, 429-439.
-
(1994)
European Journal of Operational Research
, vol.11
, pp. 429-439
-
-
Enns, S.T.1
-
15
-
-
0001153814
-
A dynamic forecasting model for job shop flowtime prediction and tardiness control
-
Enns, S.T. (1995a), "A dynamic forecasting model for job shop flowtime prediction and tardiness control", International Journal of Production Research 33, 1295-1312.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 1295-1312
-
-
Enns, S.T.1
-
16
-
-
0002992336
-
An economic approach to job shop performance analysis
-
Enns, S.T. (1995b), "An economic approach to job shop performance analysis", International Journal of Production Economics 38, 117-131.
-
(1995)
International Journal of Production Economics
, vol.38
, pp. 117-131
-
-
Enns, S.T.1
-
17
-
-
0024680497
-
Due date assignment in a multistage job shop
-
Fry, T.D., Philipoom, P.R., and Markland, R.E. (1989), "Due date assignment in a multistage job shop", IEE Transactions 21, 153-161.
-
(1989)
IEE Transactions
, vol.21
, pp. 153-161
-
-
Fry, T.D.1
Philipoom, P.R.2
Markland, R.E.3
-
18
-
-
0017246996
-
Due-dates and instantaneous load in the one-machine shop
-
Heard, E.L. (1976), "Due-dates and instantaneous load in the one-machine shop", Management Science 23, 444-450.
-
(1976)
Management Science
, vol.23
, pp. 444-450
-
-
Heard, E.L.1
-
19
-
-
0001930641
-
Job shop-like queuing systems
-
Jackson, J.R. (1963), "Job shop-like queuing systems", Management Science 10, 131-142.
-
(1963)
Management Science
, vol.10
, pp. 131-142
-
-
Jackson, J.R.1
-
20
-
-
0015681904
-
An economic evaluation of job shop dispatching rules
-
Jones, C.H. (1973), "An economic evaluation of job shop dispatching rules", Management Science 20, 293-307.
-
(1973)
Management Science
, vol.20
, pp. 293-307
-
-
Jones, C.H.1
-
21
-
-
0024656096
-
Manufacturing systems with forbidden early shipment: Implications for setting manufacturing lead times
-
Kanet, J.J., and Christy, D.P. (1989), "Manufacturing systems with forbidden early shipment: Implications for setting manufacturing lead times", International Journal of Production Research 27, 783-792.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 783-792
-
-
Kanet, J.J.1
Christy, D.P.2
-
22
-
-
0012298197
-
Priority dispatch rules with operation due dates in a job shop
-
Kanet, J.J., and Hayya, J.C. (1982), "Priority dispatch rules with operation due dates in a job shop", Journal of Operations Management 2, 167-175.
-
(1982)
Journal of Operations Management
, vol.2
, pp. 167-175
-
-
Kanet, J.J.1
Hayya, J.C.2
-
23
-
-
0029393210
-
Estimating flowtimes and setting due-dates in complex production systems
-
Lawrence, S.R. (1995), "Estimating flowtimes and setting due-dates in complex production systems", IIE Transactions 27, 657-668.
-
(1995)
IIE Transactions
, vol.27
, pp. 657-668
-
-
Lawrence, S.R.1
-
24
-
-
0000861722
-
A proof of the queuing formula: L = λW
-
Little, J.D.C. (1961), "A proof of the queuing formula: L = λW", Operations Research 3, 383-387.
-
(1961)
Operations Research
, vol.3
, pp. 383-387
-
-
Little, J.D.C.1
-
25
-
-
0003973174
-
-
Richard D. Irwin, Inc., Homewood, IL
-
Neter, J., Wasserman, W., and Kutner, M.H. (1985), Applied Linear Statistical Models, 2nd Edition, Richard D. Irwin, Inc., Homewood, IL.
-
(1985)
Applied Linear Statistical Models, 2nd Edition
-
-
Neter, J.1
Wasserman, W.2
Kutner, M.H.3
-
27
-
-
0000809619
-
Load smoothing by the planning and order review/release systems: A simulation experiment
-
Melnyk, S.A., Ragatz, G.L., and Fredendall, L. (1991), "Load smoothing by the planning and order review/release systems: A simulation experiment", Journal of Operations Management 10, 512-523.
-
(1991)
Journal of Operations Management
, vol.10
, pp. 512-523
-
-
Melnyk, S.A.1
Ragatz, G.L.2
Fredendall, L.3
-
28
-
-
0012240170
-
Variance control vs. dispatching efficiency
-
Melnyk, S.A., Denzler, D.R., and Fredendall, D. (1992), "Variance control vs. dispatching efficiency", Production and Inventory Journal 33, 6-13.
-
(1992)
Production and Inventory Journal
, vol.33
, pp. 6-13
-
-
Melnyk, S.A.1
Denzler, D.R.2
Fredendall, D.3
-
29
-
-
0019540666
-
Combined scheduling system for reducing job tardiness in a job shop
-
Miyazaki, S. (1981), "Combined scheduling system for reducing job tardiness in a job shop", International Journal of Production Research 19, 201-211.
-
(1981)
International Journal of Production Research
, vol.19
, pp. 201-211
-
-
Miyazaki, S.1
-
30
-
-
0004009033
-
-
McGraw-Hill, Inc., New York, NY
-
Pegden, C.D., Shannon, R.E., and Sadowski, R.P. (1990), Introduction to Simulation using SIMAN, McGraw-Hill, Inc., New York, NY.
-
(1990)
Introduction to Simulation Using SIMAN
-
-
Pegden, C.D.1
Shannon, R.E.2
Sadowski, R.P.3
-
31
-
-
0001870328
-
A simulation analysis of due-date assignment rules
-
Ragatz, G.L., and Mabert, V.A. (1984), "A simulation analysis of due-date assignment rules", Journal of Operations Management 5, 27-39.
-
(1984)
Journal of Operations Management
, vol.5
, pp. 27-39
-
-
Ragatz, G.L.1
Mabert, V.A.2
-
32
-
-
84985757538
-
An evaluation of order release mechanisms in a job-shop environment
-
Ragatz, G.L., and Mabert, V.A. (1988), "An evaluation of order release mechanisms in a job-shop environment", Decision Sciences 19, 167-189.
-
(1988)
Decision Sciences
, vol.19
, pp. 167-189
-
-
Ragatz, G.L.1
Mabert, V.A.2
-
33
-
-
0024606224
-
The use of value-based priorities when early shipments are forbidden
-
Scudder, G.D., and Hoffmann, T.R. (1989), "The use of value-based priorities when early shipments are forbidden", International Journal of Production Research 27, 353-369.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 353-369
-
-
Scudder, G.D.1
Hoffmann, T.R.2
-
34
-
-
0019560165
-
Due-date assignment for production systems
-
Seidmann, A., and Smith, M.L. (1980), "Due-date assignment for production systems", Management Science 27, 571-581.
-
(1980)
Management Science
, vol.27
, pp. 571-581
-
-
Seidmann, A.1
Smith, M.L.2
-
35
-
-
0024064120
-
Approximations for the time spent in a dynamic job shop with application to due-date assignment
-
Shanthikumar, J.G., and Sumita, U. (1988), "Approximations for the time spent in a dynamic job shop with application to due-date assignment", International Journal of Production Research 26, 1329-1352.
-
(1988)
International Journal of Production Research
, vol.26
, pp. 1329-1352
-
-
Shanthikumar, J.G.1
Sumita, U.2
-
36
-
-
21844517678
-
From CAN-Q to MPX: Evolution of queuing software for manufacturing
-
Suri, R., Diehl, G., and de Treville, S. (1995), "From CAN-Q to MPX: Evolution of queuing software for manufacturing", Interfaces 25, 128-150.
-
(1995)
Interfaces
, vol.25
, pp. 128-150
-
-
Suri, R.1
Diehl, G.2
De Treville, S.3
-
37
-
-
0026186620
-
Dynamic rules for due-date assignment
-
Vig, M.M., and Dooley, K.J. (1991), "Dynamic rules for due-date assignment", International Journal of Production Research 29, 1361-1377.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 1361-1377
-
-
Vig, M.M.1
Dooley, K.J.2
-
38
-
-
0003007750
-
Optimizing planned lead times and delivery dates
-
Weeks, J.K. (1978), "Optimizing planned lead times and delivery dates", in: APICS 21st Annual Conference Proceedings, 177-188.
-
(1978)
APICS 21st Annual Conference Proceedings
, pp. 177-188
-
-
Weeks, J.K.1
-
39
-
-
0018454859
-
A simulation of predictable due-dates
-
Weeks, J.K., (1979), "A simulation of predictable due-dates", Management Science 25, 363-373.
-
(1979)
Management Science
, vol.25
, pp. 363-373
-
-
Weeks, J.K.1
-
40
-
-
0001200692
-
Due-date setting and priority sequencing in a multiclass M/G/1 queue
-
Wein, L.M. (1991), "Due-date setting and priority sequencing in a multiclass M/G/1 queue", Management Science 37, 834-850.
-
(1991)
Management Science
, vol.37
, pp. 834-850
-
-
Wein, L.M.1
-
41
-
-
0026884810
-
A broader view of the job-shop scheduling problem
-
Wein, L.W., and Chevalier, P.B. (1992), "A broader view of the job-shop scheduling problem", Management Science 38, 1018-1033.
-
(1992)
Management Science
, vol.38
, pp. 1018-1033
-
-
Wein, L.W.1
Chevalier, P.B.2
-
43
-
-
0020941581
-
Modifying job sequencing rules for work-in-process inventory reduction
-
Wilson, H.G., and Mardis, B.J. (1983), "Modifying job sequencing rules for work-in-process inventory reduction", IIE Transactions 15, 320-323.
-
(1983)
IIE Transactions
, vol.15
, pp. 320-323
-
-
Wilson, H.G.1
Mardis, B.J.2
|