메뉴 건너뛰기




Volumn 8, Issue 8, 2002, Pages 607-611

Research of control and scheduling on semiconductor manufacturing line

Author keywords

Control and scheduling; Modeling; Reentrant line; Semiconductor manufacturing line

Indexed keywords

COMPUTER AIDED MANUFACTURING; CONTROL; MODELS; SCHEDULING;

EID: 0036704731     PISSN: 10065911     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (13)

References (33)
  • 1
    • 0024055865 scopus 로고
    • Scheduling semiconductor wafer fabrication
    • WEIN L M. Scheduling semiconductor wafer fabrication[J]. IEEE Trans. Semiconductor Manufacturing, 1988, 1(3): 115-130.
    • (1988) IEEE Trans. Semiconductor Manufacturing , vol.1 , Issue.3 , pp. 115-130
    • Wein, L.M.1
  • 2
    • 21144477219 scopus 로고
    • Re-entrant lines
    • KUMAR P R. Re-entrant lines[J]. Queueing Systems, 1993, 13(1-2): 87-110.
    • (1993) Queueing Systems , vol.13 , Issue.1-2 , pp. 87-110
    • Kumar, P.R.1
  • 3
    • 0028744478 scopus 로고
    • Scheduling semiconductor manufacturing plants
    • KUMAR P R. Scheduling semiconductor manufacturing plants[J]. IEEE Control System, 1994, 14(6): 33-40.
    • (1994) IEEE Control System , vol.14 , Issue.6 , pp. 33-40
    • Kumar, P.R.1
  • 4
    • 0000861722 scopus 로고
    • A proof for the queueing formula: n=λW
    • LITTLE J D. A proof for the queueing formula: n=λW[J]. Operations Research, 1961, 9(3): 383-387.
    • (1961) Operations Research , vol.9 , Issue.3 , pp. 383-387
    • Little, J.D.1
  • 5
    • 0022102468 scopus 로고
    • Operation control of admission to a queueing system
    • STIDHAM S. Operation control of admission to a queueing system[J]. IEEE Trans. Automatic Control, 1985, 30(8): 707-713.
    • (1985) IEEE Trans. Automatic Control , vol.30 , Issue.8 , pp. 707-713
    • Stidham, S.1
  • 6
    • 0029392253 scopus 로고
    • Scheduling manufacturing system with work-in-process inventory control: Single-part-type systems
    • BAI S, GERSUHWIN S B. Scheduling manufacturing system with work-in-process inventory control: single-part-type systems[J]. IIE Trans., 1995, 27(5): 599-617.
    • (1995) IIE Trans. , vol.27 , Issue.5 , pp. 599-617
    • Bai, S.1    Gersuhwin, S.B.2
  • 7
    • 0025510925 scopus 로고
    • Scheduling networks of queues: Heavy traffic analysis of a two-station network with controllable inputs
    • WEIN L M. Scheduling networks of queues: heavy traffic analysis of a two-station network with controllable inputs[J]. Operations Research, 1990, 38(6): 1065-1078.
    • (1990) Operations Research , vol.38 , Issue.6 , pp. 1065-1078
    • Wein, L.M.1
  • 8
    • 0023964289 scopus 로고
    • Closed-loop job release control for VLSI circuit manufacturing
    • GLASSEY R C, et al. Closed-loop job release control for VLSI circuit manufacturing[J]. IEEE Trans. Semiconductor Manufacturing, 1988, 1(1): 36-46.
    • (1988) IEEE Trans. Semiconductor Manufacturing , vol.1 , Issue.1 , pp. 36-46
    • Glassey, R.C.1
  • 9
    • 0028429769 scopus 로고
    • A planning and scheduler for semiconductor manufacturing
    • FARGHER H E. A planning and scheduler for semiconductor manufacturing[J]. IEEE Trans. Semiconductor Manufacturing, 1994, 7(2): 117-126.
    • (1994) IEEE Trans. Semiconductor Manufacturing , vol.7 , Issue.2 , pp. 117-126
    • Fargher, H.E.1
  • 10
    • 0030084325 scopus 로고    scopus 로고
    • Minimum inventory variability schedule with applications in semiconductor fabrication
    • LI Shu, et al. Minimum inventory variability schedule with applications in semiconductor fabrication[J]. IEEE Trans. Semiconductor Manufacturing, 1996, 9(1): 145-149.
    • (1996) IEEE Trans. Semiconductor Manufacturing , vol.9 , Issue.1 , pp. 145-149
    • Li, S.1
  • 11
    • 0032002955 scopus 로고    scopus 로고
    • Due date based scheduling and control policies in a multi-product semiconductor wafer fabrication facility
    • YEONG-DAE K, JUNG-UG K. Due date based scheduling and control policies in a multi-product semiconductor wafer fabrication facility[J]. IEEE Trans. Semiconductor Manufacturing, 1998, 11(1): 155-164.
    • (1998) IEEE Trans. Semiconductor Manufacturing , vol.11 , Issue.1 , pp. 155-164
    • Yeong-Dae, K.1    Jung-Ug, K.2
  • 12
    • 0028481114 scopus 로고
    • Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants
    • LU STEVE C H, et al. Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants [J]. IEEE Trans. Semiconductor Manufacturing, 1994, 7(3): 373-388.
    • (1994) IEEE Trans. Semiconductor Manufacturing , vol.7 , Issue.3 , pp. 373-388
    • lu Steve, C.H.1
  • 13
    • 0030134958 scopus 로고    scopus 로고
    • A survey of machine scheduling problems with blocking and no-wait in process
    • HALL N G, SRISKANDAREJAH. A survey of machine scheduling problems with blocking and no-wait in process [J]. Operations Research, 1996, 44(3): 510-525.
    • (1996) Operations Research , vol.44 , Issue.3 , pp. 510-525
    • Hall, N.G.1    Sriskandarejah, S.2
  • 14
    • 0030232128 scopus 로고    scopus 로고
    • Mean flow time minimization in reentrant Job-shop with a hub
    • KUBIAK W, LOW SHOLDON X C, et al. Mean flow time minimization in reentrant Job-shop with a hub[J]. Operations Research, 1996, 44(5): 764-776.
    • (1996) Operations Research , vol.44 , Issue.5 , pp. 764-776
    • Kubiak, W.1    Low Sholdon, X.C.2
  • 15
    • 0032265966 scopus 로고    scopus 로고
    • On deadlock free scheduling in FMS
    • Sa Diego, CA: IEEE
    • ABDALLAH I B. On deadlock free scheduling in FMS[A]. IEEE Proceedings on SMC[C]. Sa Diego, CA: IEEE, 1998. 366-371.
    • (1998) IEEE Proceedings on SMC , pp. 366-371
    • Abdallah, I.B.1
  • 16
    • 0032131027 scopus 로고    scopus 로고
    • Hybrid genetic algorithms for a multiple-objective scheduling problem
    • CAVALIERI S, GAIARDELLI P. Hybrid genetic algorithms for a multiple-objective scheduling problem[J]. Jour. Intelligent Manufacturing, 1998, 9(4): 361-367.
    • (1998) Jour. Intelligent Manufacturing , vol.9 , Issue.4 , pp. 361-367
    • Cavalieri, S.1    Gaiardelli, P.2
  • 17
    • 0029534141 scopus 로고
    • Development of an intelligent scheduler for semiconductor manufacturing faciliyties
    • NJ, USA: IEEE 95CB35811
    • SCHORN-DISALVI E, LIQUIGAN R, PETERS B A, et al. Development of an intelligent scheduler for semiconductor manufacturing facilities[A]. Proceedings of the American Control Conference[C]. NJ, USA: IEEE 95CB35811, 1995. 159-165.
    • (1995) Proceedings of the American Control Conference , pp. 159-165
    • Schorn-Disalvi, E.1    Liquiagn, R.2    Peters, B.A.3
  • 18
    • 0030660964 scopus 로고    scopus 로고
    • Scheduling of reentrant manufacturing lines using a model predictive control (MPC) approach
    • NJ, USA: IEEE, 97CH36041
    • VARGAS-VILLAMIL F D, et al. Scheduling of reentrant manufacturing lines using a model predictive control (MPC) approach[A]. Proceedings of the American Control Conference[C]. NJ, USA: IEEE, 97CH36041. 1997. 1919-1923.
    • (1997) Proceedings of the American Control Conference , pp. 1919-1923
    • Vargas-Villamil, F.D.1
  • 20
    • 0025511612 scopus 로고
    • Scheduling networks of queues: Heavy traffic analysis of a two-station closed network
    • HARRISON J M, WEIN L M. Scheduling networks of queues: Heavy traffic analysis of a two-station closed network[J]. Operations Research, 1990, 38(6): 1052-1064.
    • (1990) Operations Research , vol.38 , Issue.6 , pp. 1052-1064
    • Harrison, J.M.1    Wein, L.M.2
  • 21
    • 0029324121 scopus 로고
    • Stability and performance of a simple distributed tracking policy for production control of manufacturing system
    • SHARIFNIA A. Stability and performance of a simple distributed tracking policy for production control of manufacturing system[J]. IEEE Trans. Automatic Control, 1995, 40(6): 1109-1113.
    • (1995) IEEE Trans. Automatic Control , vol.40 , Issue.6 , pp. 1109-1113
    • Sharifnia, A.1
  • 22
    • 0000688623 scopus 로고
    • A general class of bulk queues with poisson input
    • NUETS M F. A general class of bulk queues with poisson input[J]. Ann Math. Statist, 1967, 38(3): 759-770.
    • (1967) Ann. Math. Statist. , vol.38 , Issue.3 , pp. 759-770
    • Nuets, M.F.1
  • 23
    • 0026866908 scopus 로고
    • Real-time control of multi-product bulk-service semiconductor manufacturing processes
    • FOWLER J W, PHILLIPS D, HOGG G. Real-time control of multi-product bulk-service semiconductor manufacturing processes[J]. IEEE Trans. Semiconductor Manufacturing, 1992, 5(2): 158-163.
    • (1992) IEEE Trans. Semiconductor Manufacturing , vol.5 , Issue.2 , pp. 158-163
    • Fowler, J.W.1    Phillips, D.2    Hogg, G.3
  • 24
    • 0027632197 scopus 로고
    • Scheduling networks of queues: Heavy traffic analysis of a multistation closed network
    • CHEVALIER P B, WEIN L. Scheduling networks of queues: Heavy traffic analysis of a multistation closed network[J]. Operations Research, 1993, 41(4): 743-758.
    • (1993) Operations Research , vol.41 , Issue.4 , pp. 743-758
    • Chevalier, P.B.1    Wein, L.2
  • 25
    • 4243442178 scopus 로고    scopus 로고
    • Scheduling optimization and performance analysis of reentrant line
    • Beijing: Automation Research Institute of Chinese Academy of Sciences, Chinese source
    • ZHAO Lina. Scheduling optimization and performance analysis of reentrant line[D]. Beijing: Automation Research Institute of Chinese Academy of Sciences, 1999(in Chinese).
    • (1999)
    • Zhao, L.1
  • 26
    • 0012072393 scopus 로고    scopus 로고
    • Scheduling studies of semiconductor manufacturing line based on Petri nets
    • Shanghai: Tongji University, Chinese source
    • SHI Jinhui. Scheduling studies of semiconductor manufacturing line based on Petri nets[D]. Shanghai: Tongji University, 1999(in Chinese)
    • (1999)
    • Shi, J.1
  • 27
    • 0016495143 scopus 로고
    • Open, closed and mixed networks of queues with different classes of customers
    • BASLETT F, CHANDY K M, MUNTZ R R. Open, closed and mixed networks of queues with different classes of customers[J]. Jour. ACM, 1975, 22(2): 248-260.
    • (1975) Jour. ACM , vol.22 , Issue.2 , pp. 248-260
    • Baslett, F.1    Chandy, K.M.2    Muntz, R.R.3
  • 28
    • 0012042330 scopus 로고
    • Reduced simulation models of wafer fabrication facilities
    • HUNG Y F, LEACHMAN R C. Reduced simulation models of wafer fabrication facilities[J]. Jour. ACM, 1975, 22(2): 248-260.
    • (1975) Jour. ACM , vol.22 , Issue.2 , pp. 248-260
    • Hung, Y.E.1    Leachman, R.C.2
  • 29
    • 21144478130 scopus 로고
    • Brownian models of multi-class queueing networks: Current status and open problems
    • MICHAEL H, HARRISON J, VIEN N. Brownian models of multi-class queueing networks: Current status and open problems[J]. Queueing Systems, 1993, 13(1-2): 5-40.
    • (1993) Queueing Systems , vol.13 , Issue.1-2 , pp. 5-40
    • Michael, H.1    Harrison, J.2    Vien, N.3
  • 31
    • 0012042842 scopus 로고    scopus 로고
    • Modeling, analysis, simulation, scheduling, and control semiconductor manufacturing system: A Petri net approach
    • ZHOU M, JENG M.D. Modeling, analysis, simulation, scheduling, and control semiconductor manufacturing system: a Petri net approach[J]. IEEE Trans. Semiconductor Manufacturing, 1998, 12(1): 1-36.
    • (1998) IEEE Trans. Semiconductor Manufacturing , vol.12 , Issue.1 , pp. 1-36
    • Zhou, M.1    Jeng, M.D.2
  • 32
    • 0033245832 scopus 로고    scopus 로고
    • Value iteration and optimization of multi-class queueing networks
    • CHEN R R, MEYN S P. Value iteration and optimization of multi-class queueing networks[J]. Queueing Systems, 1999, 32(1-3): 65-97.
    • (1999) Queueing Systems , vol.32 , Issue.1-3 , pp. 65-97
    • Chen, R.R.1    Meyn, S.P.2
  • 33
    • 0003124563 scopus 로고
    • Nonexistence of Brownian model of certain multi-class queueing networks
    • DAI J G, WANG Y. Nonexistence of Brownian model of certain multi-class queueing networks[J]. Queueing Systems, 1993, 13(1-2): 41-46.
    • (1993) Queueing Systems , vol.13 , Issue.1-2 , pp. 41-46
    • Dai, J.G.1    Wang, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.