-
1
-
-
0020013653
-
A state-of-the-art survey of dispatching rules for manufacturing job shop operations
-
Blackstone, J. H., Jr, Phillips, D. T. and Hogg, G. L. 1982, A state-of-the-art survey of dispatching rules for manufacturing job shop operations. International Journal of Production Research, 20, 27-45.
-
(1982)
International Journal of Production Research
, vol.20
, pp. 27-45
-
-
Blackstone J.H., Jr.1
Phillips, D.T.2
Hogg, G.L.3
-
2
-
-
0030166927
-
Identifying attributes for knowledge-based development in dynamic scheduling environments
-
Chen, C. C. and Yih, Y., 1996, Identifying attributes for knowledge-based development in dynamic scheduling environments. International Journal of Production Research, 34, 1739-1755.
-
(1996)
International Journal of Production Research
, vol.34
, pp. 1739-1755
-
-
Chen, C.C.1
Yih, Y.2
-
3
-
-
0032635912
-
Auto-bias selection for developing learning-based scheduling systems
-
Chen, C. C., Yih, Y. and Wu, Y. C., 1999, Auto-bias selection for developing learning-based scheduling systems. International Journal of Production Research, 37, 1987-2002.
-
(1999)
International Journal of Production Research
, vol.37
, pp. 1987-2002
-
-
Chen, C.C.1
Yih, Y.2
Wu, Y.C.3
-
4
-
-
0032290684
-
Client-server model of integrated production facilities
-
Esfarjani, K. and Nof, S. Y., 1998, Client-server model of integrated production facilities. International Journal of Production Research, 36, 3295-3321.
-
(1998)
International Journal of Production Research
, vol.36
, pp. 3295-3321
-
-
Esfarjani, K.1
Nof, S.Y.2
-
5
-
-
0026414529
-
Matching heuristic scheduling rules for job shops to the business sales level
-
Gray, C. and Hoesada, M., 1991, Matching heuristic scheduling rules for job shops to the business sales level. Production and Inventory Management Journal, 32, 12-17.
-
(1991)
Production and Inventory Management Journal
, vol.32
, pp. 12-17
-
-
Gray, C.1
Hoesada, M.2
-
6
-
-
0025547227
-
Detail vs. Simplifying assumptions for simulating semiconductor manufacturing lines
-
Hood, S. J., 1990, Detail vs. Simplifying assumptions for simulating semiconductor manufacturing lines. IEEE/CHMT '90 IEMT Symposium, pp. 103-108.
-
(1990)
IEEE/CHMT '90 IEMT Symposium
, pp. 103-108
-
-
Hood, S.J.1
-
7
-
-
0032183805
-
A simulation study of dispatching rules for reducing flow times in semiconductor wafer fabrication
-
Hung, Y. F. and Chen, I. R., 1998, A simulation study of dispatching rules for reducing flow times in semiconductor wafer fabrication. Production Planning and Control, 9, 714-722.
-
(1998)
Production Planning and Control
, vol.9
, pp. 714-722
-
-
Hung, Y.F.1
Chen, I.R.2
-
8
-
-
0032642484
-
Reduced simulation models of wafer fabrication facilities
-
Hung, Y. F. and Leachman, R. C., 1999, Reduced simulation models of wafer fabrication facilities. International Journal of Production Research, 37, 2685-2701.
-
(1999)
International Journal of Production Research
, vol.37
, pp. 2685-2701
-
-
Hung, Y.F.1
Leachman, R.C.2
-
9
-
-
0034292123
-
A neural network approach for defect identification and classification of leather fabric
-
Kwak, C., Ventura, J. A. and Tofang-Sazi, K., 2000, A neural network approach for defect identification and classification of leather fabric. Journal of Intelligent Manufacturing, 11, 485-499.
-
(2000)
Journal of Intelligent Manufacturing
, vol.11
, pp. 485-499
-
-
Kwak, C.1
Ventura, J.A.2
Tofang-Sazi, K.3
-
11
-
-
0002891824
-
Tautologies, models, and theories: Can we find 'laws' of manufacturing?
-
Little, J. D. C., 1992, Tautologies, models, and theories: can we find 'laws' of manufacturing? IIE Transactions, 24, 7-13.
-
(1992)
IIE Transactions
, vol.24
, pp. 7-13
-
-
Little, J.D.C.1
-
13
-
-
0003837472
-
Evaluation of timeout protocols in manufacturing systems
-
MS thesis, School of Industrial Engineering, Purdue University
-
Peralta, J. I., 1996, Evaluation of timeout protocols in manufacturing systems. MS thesis, School of Industrial Engineering, Purdue University.
-
(1996)
-
-
Peralta, J.I.1
-
14
-
-
79953731315
-
Development of a computer simulator for dynamic scheduling of FMS to achieve optimal performance
-
Selladurai, V., Aravindan, P. and Satheesan, R., 1996, Development of a computer simulator for dynamic scheduling of FMS to achieve optimal performance. International Journal of Advanced Manufacturing Technology, 12, 145-152.
-
(1996)
International Journal of Advanced Manufacturing Technology
, vol.12
, pp. 145-152
-
-
Selladurai, V.1
Aravindan, P.2
Satheesan, R.3
-
15
-
-
84952240555
-
A review of production planning and scheduling models in the semiconductor industry. Part I: System characteristics, performance evaluation and production planning
-
Uzsoy, R., Lee, C. Y. and Martin-Vega, L. A., 1992, A review of production planning and scheduling models in the semiconductor industry. Part I: System characteristics, performance evaluation and production planning. IIE Transactions, 24, 47-60.
-
(1992)
IIE Transactions
, vol.24
, pp. 47-60
-
-
Uzsoy, R.1
Lee, C.Y.2
Martin-Vega, L.A.3
-
16
-
-
0028496979
-
A review of production planning and scheduling models in the semiconductor industry. Part II: Shop-floor control
-
Uzsoy, R., Lee, C. Y. and Martin-Vega, L. A., 1994, A review of production planning and scheduling models in the semiconductor industry. Part II: Shop-floor control. IIE Transactions, 26, 44-55.
-
(1994)
IIE Transactions
, vol.26
, pp. 44-55
-
-
Uzsoy, R.1
Lee, C.Y.2
Martin-Vega, L.A.3
-
17
-
-
0004250813
-
-
Research Memorandum, 95-7 (West Lafayette: School of Industrial Engineering, Purdue University)
-
Williams, N. P. and Nof, S. Y., 1995, TestLAN: An Approach to Integrated Testing Systems Design. Research Memorandum, 95-7 (West Lafayette: School of Industrial Engineering, Purdue University).
-
(1995)
TestLAN: An Approach to Integrated Testing Systems Design
-
-
Williams, N.P.1
Nof, S.Y.2
|