메뉴 건너뛰기




Volumn 39, Issue 13, 2001, Pages 2947-2956

Simulation comparison of collaboration protocol-based testing models

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; COMPUTER SUPPORTED COOPERATIVE WORK; HEURISTIC METHODS; PARAMETER ESTIMATION;

EID: 0035840754     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540110051842     Document Type: Article
Times cited : (7)

References (17)
  • 2
    • 0030166927 scopus 로고    scopus 로고
    • Identifying attributes for knowledge-based development in dynamic scheduling environments
    • Chen, C. C. and Yih, Y., 1996, Identifying attributes for knowledge-based development in dynamic scheduling environments. International Journal of Production Research, 34, 1739-1755.
    • (1996) International Journal of Production Research , vol.34 , pp. 1739-1755
    • Chen, C.C.1    Yih, Y.2
  • 3
    • 0032635912 scopus 로고    scopus 로고
    • Auto-bias selection for developing learning-based scheduling systems
    • Chen, C. C., Yih, Y. and Wu, Y. C., 1999, Auto-bias selection for developing learning-based scheduling systems. International Journal of Production Research, 37, 1987-2002.
    • (1999) International Journal of Production Research , vol.37 , pp. 1987-2002
    • Chen, C.C.1    Yih, Y.2    Wu, Y.C.3
  • 5
    • 0026414529 scopus 로고
    • Matching heuristic scheduling rules for job shops to the business sales level
    • Gray, C. and Hoesada, M., 1991, Matching heuristic scheduling rules for job shops to the business sales level. Production and Inventory Management Journal, 32, 12-17.
    • (1991) Production and Inventory Management Journal , vol.32 , pp. 12-17
    • Gray, C.1    Hoesada, M.2
  • 6
    • 0025547227 scopus 로고
    • Detail vs. Simplifying assumptions for simulating semiconductor manufacturing lines
    • Hood, S. J., 1990, Detail vs. Simplifying assumptions for simulating semiconductor manufacturing lines. IEEE/CHMT '90 IEMT Symposium, pp. 103-108.
    • (1990) IEEE/CHMT '90 IEMT Symposium , pp. 103-108
    • Hood, S.J.1
  • 7
    • 0032183805 scopus 로고    scopus 로고
    • A simulation study of dispatching rules for reducing flow times in semiconductor wafer fabrication
    • Hung, Y. F. and Chen, I. R., 1998, A simulation study of dispatching rules for reducing flow times in semiconductor wafer fabrication. Production Planning and Control, 9, 714-722.
    • (1998) Production Planning and Control , vol.9 , pp. 714-722
    • Hung, Y.F.1    Chen, I.R.2
  • 9
    • 0034292123 scopus 로고    scopus 로고
    • A neural network approach for defect identification and classification of leather fabric
    • Kwak, C., Ventura, J. A. and Tofang-Sazi, K., 2000, A neural network approach for defect identification and classification of leather fabric. Journal of Intelligent Manufacturing, 11, 485-499.
    • (2000) Journal of Intelligent Manufacturing , vol.11 , pp. 485-499
    • Kwak, C.1    Ventura, J.A.2    Tofang-Sazi, K.3
  • 11
    • 0002891824 scopus 로고
    • Tautologies, models, and theories: Can we find 'laws' of manufacturing?
    • Little, J. D. C., 1992, Tautologies, models, and theories: can we find 'laws' of manufacturing? IIE Transactions, 24, 7-13.
    • (1992) IIE Transactions , vol.24 , pp. 7-13
    • Little, J.D.C.1
  • 13
    • 0003837472 scopus 로고    scopus 로고
    • Evaluation of timeout protocols in manufacturing systems
    • MS thesis, School of Industrial Engineering, Purdue University
    • Peralta, J. I., 1996, Evaluation of timeout protocols in manufacturing systems. MS thesis, School of Industrial Engineering, Purdue University.
    • (1996)
    • Peralta, J.I.1
  • 15
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry. Part I: System characteristics, performance evaluation and production planning
    • Uzsoy, R., Lee, C. Y. and Martin-Vega, L. A., 1992, A review of production planning and scheduling models in the semiconductor industry. Part I: System characteristics, performance evaluation and production planning. IIE Transactions, 24, 47-60.
    • (1992) IIE Transactions , vol.24 , pp. 47-60
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 16
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry. Part II: Shop-floor control
    • Uzsoy, R., Lee, C. Y. and Martin-Vega, L. A., 1994, A review of production planning and scheduling models in the semiconductor industry. Part II: Shop-floor control. IIE Transactions, 26, 44-55.
    • (1994) IIE Transactions , vol.26 , pp. 44-55
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.