-
1
-
-
0027627910
-
Due date assignment procedures with dynamically updated coefficients for multi-level assembly job shops
-
Adam, N. R., Bertrand, J. W. M, Morehead, D. C., and Surkis, J., 1993, Due date assignment procedures with dynamically updated coefficients for multi-level assembly job shops. European Journal of Operational Research, 68, 212-227.
-
(1993)
European Journal of Operational Research
, vol.68
, pp. 212-227
-
-
Adam, N.R.1
Bertrand, J.2
Morehead, D.C.3
Surkis, J.4
-
2
-
-
0021496929
-
Sequencing rules and due-date assignments in a job shop
-
Baker, K. R., 1984, Sequencing rules and due-date assignments in a job shop. Management Science, 30, 1093-1104.
-
(1984)
Management Science
, vol.30
, pp. 1093-1104
-
-
Baker, K.R.1
-
3
-
-
0020013653
-
A state-of-the art survey of dispatching rules for manufacturing job shop operations
-
Blackstone, J. H., Phillips, D. T., and Hogg, G. L., 1982, A state-of-the art survey of dispatching rules for manufacturing job shop operations. International Journal of Production Research.
-
(1982)
International Journal of Production Research.
-
-
Blackstone, J.H.1
Phillips, D.T.2
Hogg, G.L.3
-
4
-
-
0023981636
-
Empirical evaluation of a queueing network model for semiconductor wafer fabrication
-
Chen, H, Harrison, J. M, Mandelbaum, A, Achere, A V., and Wein, L. M, 1988, Empirical evaluation of a queueing network model for semiconductor wafer fabrication. Operations Research, 36, 202-215.
-
(1988)
Operations Research
, vol.36
, pp. 202-215
-
-
Chen, H.1
Harrison, J.M.2
Mandelbaum, A.3
Achere, A.V.4
Wein, L.M.5
-
5
-
-
0028419353
-
-
Connors, D. Feigin, G., and Yao D., 1994, Scheduling semiconductor lines using a fluid network model. IEEE Transactions on Robotics and A utomation, 10, 88-98.
-
(1994)
Scheduling Semiconductor Lines Using a Fluid Network Model. IEEE Transactions on Robotics and a Utomation
, vol.10
, pp. 88-98
-
-
Connors Feigin, D.G.1
Yao, D.2
-
6
-
-
0001173515
-
Priority dispatching and job lateness in a job shop
-
Conway, R. W, 1965, Priority dispatching and job lateness in a job shop. Journal of Industrial Engineering, 16, 228-237.
-
(1965)
Journal of Industrial Engineering
, vol.16
, pp. 228-237
-
-
Conway, R.W.1
-
7
-
-
0011788714
-
Network dispatching by the shortest-operation discipline
-
Conway, R. W., and Maxwell, W. L., 1962, Network dispatching by the shortest-operation discipline. Operations Research, 10, 51-73.
-
(1962)
Operations Research
, vol.10
, pp. 51-73
-
-
Conway, R.W.1
Maxwell, W.L.2
-
8
-
-
85008847557
-
-
Theory of Scheduling (Massachusetts, USA: Addison-Wesley)
-
Conway, R. W, Maxwell, W. L., and Miller, L.W, 1967, Theory of Scheduling (Massachusetts, USA: Addison-Wesley).
-
(1967)
-
-
Conway, R.W.1
Maxwell, W.L.2
Miller, L.W.3
-
9
-
-
0020393745
-
Job shop scheduling-a systematic approach
-
Dar-El, E. M., and Wysk, R. A, 1982, Job shop scheduling-a systematic approach. Journal of Manufacturing System, 1, 77-88.
-
(1982)
Journal of Manufacturing System
, vol.1
, pp. 77-88
-
-
Dar-El, E.M.1
Wysk, R.A.2
-
10
-
-
0016929914
-
Due dates in job shop scheduling
-
Eilon, S., and Chowdhury, I. G, 1976, Due dates in job shop scheduling. International Journal of Production Research, 14, 223-237.
-
(1976)
International Journal of Production Research
, vol.14
, pp. 223-237
-
-
Eilon, S.1
Chowdhury, I.G.2
-
11
-
-
38249027249
-
A simulation study of processing time dispatching rules
-
Fry, T., Philipoom, R., and Blackstone, J., 1988, A simulation study of processing time dispatching rules. Journal of Operations Management, 7, 77-92.
-
(1988)
Journal of Operations Management
, vol.7
, pp. 77-92
-
-
Fry, T.1
Philipoom, R.2
Blackstone, J.3
-
12
-
-
0041005286
-
-
Ph.D. Dissertation, College of Engineering, University of California, Berkeley, CA
-
Hung, Y.-F., 1991, Corporate-level production planning with simulation feedback of parameters. Ph.D. Dissertation, College of Engineering, University of California, Berkeley, CA.
-
(1991)
Corporate-level production planning with simulation feedback of parameters
-
-
Hung, Y.-F.1
-
13
-
-
11544299844
-
The development of object-oriented simulation library for semiconductor manufacturing
-
Hung, Y.-F., 1994, The development of object-oriented simulation library for semiconductor manufacturing. NSC project report.
-
(1994)
NSC Project Report
-
-
Hung, Y.-F.1
-
14
-
-
0030150549
-
A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations
-
Hung, Y.-F., and Leachman, R. C., 1996, A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations, IEEE Transactions on S emiconductor M anufacturing, 9, 257-269.
-
(1996)
IEEE Transactions on S Emiconductor M Anufacturing
, vol.9
, pp. 257-269
-
-
Hung, Y.-F.1
Leachman, R.C.2
-
15
-
-
0028594405
-
-
Kim, M H., and Kim, Y.-D., 1992, Simulation-based real-time Scheduling in a flexible manufacturing system. Journal of Manufacturing Systems, 13, 85-93.
-
(1992)
Simulation-Based Real-Time Scheduling in a Flexible Manufacturing System. Journal of Manufacturing Systems
, vol.13
, pp. 85-93
-
-
Kim, M.H.1
Kim, Y.-D.2
-
16
-
-
21144477219
-
Re-entrant lines
-
Kumar, P. R., 1993, Re-entrant lines. Queueing Systems, 13, 87110.
-
(1993)
Queueing Systems
, vol.13
, pp. 87110
-
-
Kumar, P.R.1
-
18
-
-
0001829813
-
Modeling technique for automated production planning in the semiconductor industry
-
T. A. Ciriani and R. C. Leachman (eds), England: John Wiley
-
Leachman, R. C., 1993, Modeling technique for automated production planning in the semiconductor industry. In T. A. Ciriani and R. C. Leachman (eds), Optimization in Industry (England: John Wiley), pp. 1-30.
-
(1993)
Optimization in Industry
, pp. 1-30
-
-
Leachman, R.C.1
-
19
-
-
0008197170
-
Production planning and scheduling practices across the semiconductor industry
-
University of California at Berkeley
-
Leachman, R. C., 1994, Production planning and scheduling practices across the semiconductor industry. ESRC report 94- 29/CSM-18, University of California at Berkeley.
-
(1994)
ESRC Report 94- 29/CSM-18
-
-
Leachman, R.C.1
-
20
-
-
0011854403
-
Queue management policy for the release of factory work orders. ESRC 88-19, Engineering systems Research Center, University of California at Berkeley, 1988
-
Texas AandM University, College Station, TX (Research Triangle Park, N.C.: Semiconductor Research Corporation
-
Leachman, R. C., Solorzano, M, and Glassey, C. R., 1990, Queue management policy for the release of factory work orders. ESRC 88-19, Engineering systems Research Center, University of California at Berkeley, 1988. In proceedings of the First Symposium on Semiconductor Factory Management Systems, No. 16-17, 1990, Texas AandM University, College Station, TX (Research Triangle Park, N.C.: Semiconductor Research Corporation).
-
(1990)
Proceedings of the First Symposium on Semiconductor Factory Management Systems, No. 16-17
-
-
Leachman, R.C.1
Solorzano, M.2
Glassey, C.R.3
-
21
-
-
0003560266
-
Shop floor scheduling of semiconductor wafer fabrication using real-time feedback control and prediction
-
University of California at Berkeley. Lippman, S. B., C++Primer, second edition (Massachusetts, USA: Addison-Wesley
-
Lin, C.-Y., 1996, Shop floor scheduling of semiconductor wafer fabrication using real-time feedback control and prediction. Ph.D. Dissertation, Engineering-Industrial Engineering and Operations Research, University of California at Berkeley. Lippman, S. B., 1991, C++Primer, second edition (Massachusetts, USA: Addison-Wesley).
-
(1996)
Ph.D. Dissertation, Engineering-Industrial Engineering and Operations Research
-
-
Lin, C.-Y.1
-
22
-
-
0000861722
-
A proof of the queueing formula L = AW
-
Little, J. D. C., 1961, A proof of the queueing formula L = AW. Operation Research, 9, 383-387.
-
(1961)
Operation Research
, vol.9
, pp. 383-387
-
-
Little, J.D.C.1
-
23
-
-
0028481114
-
Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants
-
Lu, S. C. H., Ramaswamy, D., and Kumar, P. R., 1994, Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants. IEEE Transactions on Semiconductor M anufacturing, 7, 374-388.
-
(1994)
IEEE Transactions on Semiconductor M Anufacturing
, vol.7
, pp. 374-388
-
-
Lu, S.C.H.1
Ramaswamy, D.2
Kumar, P.R.3
-
24
-
-
0026369803
-
Distributed scheduling based on due dates and buffer priorities
-
Lu, S. H., and Kumar, P. R., 1991, Distributed scheduling based on due dates and buffer priorities. IEEE Transactions on Automatic Control, 36, 1406-1416.
-
(1991)
IEEE Transactions on Automatic Control
, vol.36
, pp. 1406-1416
-
-
Lu, S.H.1
Kumar, P.R.2
-
25
-
-
84976808911
-
Simulation of a semiconductor manufacturing line
-
Miller, D. J., 1990, Simulation of a semiconductor manufacturing line, Communication of the ACM, 33, 98-108.
-
(1990)
Communication of the ACM
, vol.33
, pp. 98-108
-
-
Miller, D.J.1
-
26
-
-
84985757538
-
An evaluation of order release mechanisms in a job-shop environment
-
Ragatz, G L., and Mabert, V. A, 1988, An evaluation of order release mechanisms in a job-shop environment. Decision Sciences, 19, 167-189.
-
(1988)
Decision Sciences
, vol.19
, pp. 167-189
-
-
Ragatz, G.L.1
Mabert, V.A.2
-
29
-
-
11544278722
-
-
Los Altos, California, USA
-
TyECIN Systems Inc., 1995, ManSim Users Manual (Los Altos, California, USA).
-
(1995)
Mansim Users Manual
-
-
-
30
-
-
84952240555
-
A review of production planning and scheduling models in the semiconductor industry-part I
-
Uzsoy, R., Lee, C. Y., and Martin-Vega, L. A, 1992, A review of production planning and scheduling models in the semiconductor industry-part I: system characteristics, performance evaluation and production planning. iie Transactions, 24, 47-60.
-
(1992)
System Characteristics, Performance Evaluation and Production Planning. Iie Transactions
, vol.24
, pp. 47-60
-
-
Uzsoy, R.1
Lee, C.Y.2
Martin-Vega, L.A.3
-
31
-
-
0028496979
-
A review of production planning and scheduling models in the semiconductor industry-part II: Shop-floor control
-
Uzsoy, R., Lee, C. Y., and Martin-Vega, L. A, 1994, A review of production planning and scheduling models in the semiconductor industry-part II: shop-floor control. IIE Transactions, 26, 44-55.
-
(1994)
IIE Transactions
, vol.26
, pp. 44-55
-
-
Uzsoy, R.1
Lee, C.Y.2
Martin-Vega, L.A.3
-
32
-
-
0029344295
-
A comparative study of some priority dispatching rules under different shop loads
-
Waikar, A. M., Sarker, B. R., and Lal, A M., 1995, A comparative study of some priority dispatching rules under different shop loads. Production Planning and Control, 6, 301-310.
-
(1995)
Production Planning and Control
, vol.6
, pp. 301-310
-
-
Waikar, A.M.1
Sarker, B.R.2
Lal, A.M.3
|