메뉴 건너뛰기




Volumn 4, Issue 1-2, 2001, Pages 57-78

Planning and Resource Allocation for Hard Real-time, Fault-Tolerant Plan Execution

Author keywords

AI architectures; Fault tolerance; Planning; Real time scheduling

Indexed keywords


EID: 0035587711     PISSN: 13872532     EISSN: None     Source Type: Journal    
DOI: 10.1023/A:1010066729351     Document Type: Article
Times cited : (29)

References (24)
  • 2
    • 0029489058 scopus 로고
    • Optimal combined task and message scheduling in distributed real-time systems
    • Pisa, Italy
    • T. F. Abdelzaher, and K. G. Shin, "Optimal combined task and message scheduling in distributed real-time systems," in IEEE Real-Time Syst. Symp., Pisa, Italy, 1995.
    • (1995) IEEE Real-Time Syst. Symp.
    • Abdelzaher, T.F.1    Shin, K.G.2
  • 3
    • 0033220904 scopus 로고    scopus 로고
    • Combined task and message scheduling in distributed real-time systems
    • T. F. Abdelzaher, and K. G. Shin, "Combined task and message scheduling in distributed real-time systems," IEEE Trans. Parallel Distrib. Syst., vol. 10, no. 11, 1999, pp. 1179-1191.
    • (1999) IEEE Trans. Parallel Distrib. Syst. , vol.10 , Issue.11 , pp. 1179-1191
    • Abdelzaher, T.F.1    Shin, K.G.2
  • 9
    • 0028572333 scopus 로고
    • Using abstractions for decision-theoretic planning with time constraints
    • C. Boutilier, and R. Dearden, "Using abstractions for decision-theoretic planning with time constraints," in Proc. Twelfth Nat. Conf. Artif. Intell., 1994, pp. 1016-1022.
    • (1994) Proc. Twelfth Nat. Conf. Artif. Intell. , pp. 1016-1022
    • Boutilier, C.1    Dearden, R.2
  • 11
    • 0002887360 scopus 로고
    • An investigation into reactive planning in complex domains
    • R. J. Firby, "An investigation into reactive planning in complex domains," in Proc. Natl. Conf. Artif. Intell., 1987, pp. 202-206.
    • (1987) Proc. Natl. Conf. Artif. Intell. , pp. 202-206
    • Firby, R.J.1
  • 12
    • 0027701502 scopus 로고
    • Design-to-time real-time scheduling
    • A. J. Garvey and V. R. Lesser, "Design-to-time real-time scheduling," IEEE Trans. Syst. Man Cybernet. vol. 23, no. 6, pp. 1491-1502, 1993.
    • (1993) IEEE Trans. Syst. Man Cybernet. , vol.23 , Issue.6 , pp. 1491-1502
    • Garvey, A.J.1    Lesser, V.R.2
  • 13
  • 14
    • 0043116823 scopus 로고
    • Solving time-critical decision-making problems with predictable computational demands
    • L. Greenwald, and T. Dean, "Solving time-critical decision-making problems with predictable computational demands," in Proc. Second Int. Conf. AI Planning Syst., 1994.
    • (1994) Proc. Second Int. Conf. AI Planning Syst.
    • Greenwald, L.1    Dean, T.2
  • 16
    • 0023422739 scopus 로고
    • SOAR: An architecture for general intelligence
    • J. E. Laird, A. Newell, and P. S. Rosenbloom, "SOAR: an architecture for general intelligence," Artif. Intell., vol. 33, pp. 1-64, 1987.
    • (1987) Artif. Intell. , vol.33 , pp. 1-64
    • Laird, J.E.1    Newell, A.2    Rosenbloom, P.S.3
  • 19
    • 0029274963 scopus 로고
    • World modeling for the dynamic construction of real-time control plans
    • D. J. Musliner, E. H. Durfee, and K. G. Shin, "World modeling for the dynamic construction of real-time control plans," Artif. Intell. vol. 74, pp. 83-127, 1995.
    • (1995) Artif. Intell. , vol.74 , pp. 83-127
    • Musliner, D.J.1    Durfee, E.H.2    Shin, K.G.3
  • 21
    • 0000204466 scopus 로고    scopus 로고
    • Assignment and scheduling of communicating periodic tasks in distributed real-time systems
    • D.-T. Peng, and K. G. Shin, and T. F. Abdelzaher, "Assignment and scheduling of communicating periodic tasks in distributed real-time systems," IEEE Trans. Parallel Distrib. Syst. vol. 8, no. 12, 1997.
    • (1997) IEEE Trans. Parallel Distrib. Syst. , vol.8 , Issue.12
    • Peng, D.-T.1    Shin, K.G.2    Abdelzaher, T.F.3
  • 22
    • 84951582474 scopus 로고
    • Planning and reacting in uncertain and dynamic environments
    • D. E. Wilkins, K. L. Myers, and J. D. Lowrance, "Planning and reacting in uncertain and dynamic environments," J. Exp. Theor. AI vol. 7, no. 1, pp. 197-227, 1995.
    • (1995) J. Exp. Theor. AI , vol.7 , Issue.1 , pp. 197-227
    • Wilkins, D.E.1    Myers, K.L.2    Lowrance, J.D.3
  • 23
    • 0027544352 scopus 로고
    • Multiprocessor scheduling of processes with release times, deadlines, precedence, and exclusion relations
    • J. Xu, "Multiprocessor scheduling of processes with release times, deadlines, precedence, and exclusion relations," IEEE Trans. Software Eng. vol. 19, no. 2, pp. 139-154, 1993.
    • (1993) IEEE Trans. Software Eng. , vol.19 , Issue.2 , pp. 139-154
    • Xu, J.1
  • 24
    • 0025403192 scopus 로고
    • Scheduling processes with release times, deadlines, precedence, and exclusion relations
    • J. Xu and D. L. Parnas, "Scheduling processes with release times, deadlines, precedence, and exclusion relations," IEEE Trans. Software Eng. SE-vol. 16, no. 3, pp. 360-369, 1990.
    • (1990) IEEE Trans. Software Eng. , vol.16 SE , Issue.3 , pp. 360-369
    • Xu, J.1    Parnas, D.L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.