-
3
-
-
38149147773
-
Vehicle scheduling in two-cycle flexible manufacturing systems
-
J. Blazewicz, R.E. Burkard, G. Finke and G.J. Woeginger, Vehicle scheduling in two-cycle flexible manufacturing systems, Mathematical and Computer Modeling 20 (1994) 19-31.
-
(1994)
Mathematical and Computer Modeling
, vol.20
, pp. 19-31
-
-
Blazewicz, J.1
Burkard, R.E.2
Finke, G.3
Woeginger, G.J.4
-
4
-
-
34249921014
-
Scheduling tasks and vehicles in a flexible manufacturing system
-
J. Blazewicz, H.A. Eiselt, G. Finke, G. Laporte and J. Weglarz, Scheduling tasks and vehicles in a flexible manufacturing system, International Journal of Flexible Manufacturing Systems 4 (1991) 5-16.
-
(1991)
International Journal of Flexible Manufacturing Systems
, vol.4
, pp. 5-16
-
-
Blazewicz, J.1
Eiselt, H.A.2
Finke, G.3
Laporte, G.4
Weglarz, J.5
-
5
-
-
0026117415
-
Tandem configurations for automated guided vehicle systems and the analysis of single vehicle loops
-
Y.A. Bozer and M.M. Srinivasan, Tandem configurations for automated guided vehicle systems and the analysis of single vehicle loops, IIE Transactions 23 (1991) 72-82.
-
(1991)
IIE Transactions
, vol.23
, pp. 72-82
-
-
Bozer, Y.A.1
Srinivasan, M.M.2
-
6
-
-
0026966782
-
Tandem AGV systems: A partitioning algorithm and performance comparison with conventional AGV systems
-
Y.A. Bozer and M.M. Srinivasan, Tandem AGV systems: A partitioning algorithm and performance comparison with conventional AGV systems, European Journal of Operational Research 63 (1992) 173-191.
-
(1992)
European Journal of Operational Research
, vol.63
, pp. 173-191
-
-
Bozer, Y.A.1
Srinivasan, M.M.2
-
12
-
-
0001068310
-
Sequencing a one state-variable machine: A solvable case of the traveling salesman problem
-
P.C. Gilmore and R.E. Gomory, Sequencing a one state-variable machine: A solvable case of the traveling salesman problem, Operations Research 12 (1964) 665-679.
-
(1964)
Operations Research
, vol.12
, pp. 665-679
-
-
Gilmore, P.C.1
Gomory, R.E.2
-
14
-
-
0023381816
-
Largest AGVS in North America transforms truck assembly
-
L. Gould, Largest AGVS in North America transforms truck assembly, Modern Materials Handling 42 (1987) 58-63.
-
(1987)
Modern Materials Handling
, vol.42
, pp. 58-63
-
-
Gould, L.1
-
15
-
-
74849101820
-
Optimization and approximation in deterministic sequencing and scheduling: A survey
-
R.L. Graham, E.L. Lawler, J.K. Lenstra and A.H.G. Rinnooy Kan, Optimization and approximation in deterministic sequencing and scheduling: A survey, Annals of Discrete Mathematics 5 (1979) 287-326.
-
(1979)
Annals of Discrete Mathematics
, vol.5
, pp. 287-326
-
-
Graham, R.L.1
Lawler, E.L.2
Lenstra, J.K.3
Rinnooy Kan, A.H.G.4
-
16
-
-
0025465093
-
AGV-served assembly lines: Influence of sequencing and launch policies on system performances
-
V. Grasso, AGV-served assembly lines: Influence of sequencing and launch policies on system performances, International Journal of Production Research 28 (1990) 1385-1399.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 1385-1399
-
-
Grasso, V.1
-
17
-
-
0042612417
-
An expert system for design of automated material handling systems (INSIMAS)
-
W. Grosseschallau and A. Kusiak, An expert system for design of automated material handling systems (INSIMAS), Material Flow 2 (1985) 157-166.
-
(1985)
Material Flow
, vol.2
, pp. 157-166
-
-
Grosseschallau, W.1
Kusiak, A.2
-
18
-
-
0031142587
-
Scheduling in robotic cells: Classification, two and three machine cells
-
N.G. Hall, H. Kamoun and C. Sriskandarajah, Scheduling in robotic cells: Classification, two and three machine cells, Operations Research 45 (1997) 421-439.
-
(1997)
Operations Research
, vol.45
, pp. 421-439
-
-
Hall, N.G.1
Kamoun, H.2
Sriskandarajah, C.3
-
19
-
-
0043142194
-
Operational decisions in AGV-served flowshop loops: Fleet sizing and decomposition
-
N.G. Hall, C. Sriskandarajah and T. Ganesharajah, Operational decisions in AGV-served flowshop loops: Fleet sizing and decomposition, Annals of Operations Research 107 (2001) 189-209.
-
(2001)
Annals of Operations Research
, vol.107
, pp. 189-209
-
-
Hall, N.G.1
Sriskandarajah, C.2
Ganesharajah, T.3
-
21
-
-
0024680284
-
Control of material handling transporter in automated manufacturing
-
M.-H. Han and L.F. McGinnis, Control of material handling transporter in automated manufacturing, IIE Transactions 21 (1989) 184-190.
-
(1989)
IIE Transactions
, vol.21
, pp. 184-190
-
-
Han, M.-H.1
McGinnis, L.F.2
-
23
-
-
0026124166
-
Automated two-machine flowshop scheduling: A solvable case
-
H. Kise, T. Shioyama and T. Ibaraki, Automated two-machine flowshop scheduling: A solvable case, IIE Transactions 23 (1991) 10-16.
-
(1991)
IIE Transactions
, vol.23
, pp. 10-16
-
-
Kise, H.1
Shioyama, T.2
Ibaraki, T.3
-
24
-
-
0002201608
-
Automated guided vehicle systems: Applications, controls and planning
-
G.A. Koff, Automated guided vehicle systems: Applications, controls and planning, Material Flow 4 (1987) 3-16.
-
(1987)
Material Flow
, vol.4
, pp. 3-16
-
-
Koff, G.A.1
-
25
-
-
0043113319
-
Material handling in flexible manufacturing systems
-
A. Kusiak, Material handling in flexible manufacturing systems, Material Flow 2 (1985) 79-95.
-
(1985)
Material Flow
, vol.2
, pp. 79-95
-
-
Kusiak, A.1
-
26
-
-
0003408279
-
-
Wiley, Chichester, UK
-
E.L. Lawler, J.K. Lenstra, A.H.G. Rinnooy Kan and D.B. Shmoys, The Traveling Salesman Problem: A Guided Tour of Combinatorial Optimization (Wiley, Chichester, UK, 1985).
-
(1985)
The Traveling Salesman Problem: A Guided Tour of Combinatorial Optimization
-
-
Lawler, E.L.1
Lenstra, J.K.2
Rinnooy Kan, A.H.G.3
Shmoys, D.B.4
-
27
-
-
0020140765
-
Design of automatic guided vehicle systems
-
W.L. Maxwell and J.A. Muckstadt, Design of automatic guided vehicle systems, IIE Transactions 14 (1982) 114-124.
-
(1982)
IIE Transactions
, vol.14
, pp. 114-124
-
-
Maxwell, W.L.1
Muckstadt, J.A.2
-
28
-
-
0003449926
-
-
Institute of Industrial Engineers Press, Norcross, GA
-
Y. Monden, Toyota Production System (Institute of Industrial Engineers Press, Norcross, GA, 1983).
-
(1983)
Toyota Production System
-
-
Monden, Y.1
-
30
-
-
0027554501
-
A faster strongly polynomial minimum cost flow algorithm
-
J.B. Orlin, A faster strongly polynomial minimum cost flow algorithm, Operations Research 41 (1993) 338-350.
-
(1993)
Operations Research
, vol.41
, pp. 338-350
-
-
Orlin, J.B.1
-
31
-
-
0026188481
-
Scheduling of a two-machine flowshop with travel time between machines
-
S. Panwalkar, Scheduling of a two-machine flowshop with travel time between machines, Journal of the Operational Research Society 42 (1991) 609-613.
-
(1991)
Journal of the Operational Research Society
, vol.42
, pp. 609-613
-
-
Panwalkar, S.1
-
32
-
-
84974857090
-
Scheduling parts in a combined production-transportation work cell
-
H.I. Stern and G. Vitner, Scheduling parts in a combined production-transportation work cell, Journal of the Operational Research Society 41 (1990) 625-632.
-
(1990)
Journal of the Operational Research Society
, vol.41
, pp. 625-632
-
-
Stern, H.I.1
Vitner, G.2
-
34
-
-
0022904292
-
Guided vehicles set manufacturing in motion
-
December
-
J. Zygmont, Guided vehicles set manufacturing in motion, High Technology 16 (December 1986).
-
(1986)
High Technology
, vol.16
-
-
Zygmont, J.1
|