메뉴 건너뛰기




Volumn 107, Issue 1-4, 2001, Pages 161-188

Operational Decisions in AGV-Served Flowshop Loops: Scheduling

Author keywords

Automated guided vehicles; Heuristics; Manufacturing; Scheduling

Indexed keywords


EID: 0035565234     PISSN: 02545330     EISSN: 15729338     Source Type: Journal    
DOI: 10.1023/A:1014903232563     Document Type: Article
Times cited : (13)

References (34)
  • 2
    • 0019059991 scopus 로고
    • Cyclic scheduling via integer programs with circular ones
    • J.J. Bartholdi, III, J.B. Orlin and H.D. Ratliff, Cyclic scheduling via integer programs with circular ones, Operations Research 28 (1980) 1074-1085.
    • (1980) Operations Research , vol.28 , pp. 1074-1085
    • Bartholdi J.J. III1    Orlin, J.B.2    Ratliff, H.D.3
  • 5
    • 0026117415 scopus 로고
    • Tandem configurations for automated guided vehicle systems and the analysis of single vehicle loops
    • Y.A. Bozer and M.M. Srinivasan, Tandem configurations for automated guided vehicle systems and the analysis of single vehicle loops, IIE Transactions 23 (1991) 72-82.
    • (1991) IIE Transactions , vol.23 , pp. 72-82
    • Bozer, Y.A.1    Srinivasan, M.M.2
  • 6
    • 0026966782 scopus 로고
    • Tandem AGV systems: A partitioning algorithm and performance comparison with conventional AGV systems
    • Y.A. Bozer and M.M. Srinivasan, Tandem AGV systems: A partitioning algorithm and performance comparison with conventional AGV systems, European Journal of Operational Research 63 (1992) 173-191.
    • (1992) European Journal of Operational Research , vol.63 , pp. 173-191
    • Bozer, Y.A.1    Srinivasan, M.M.2
  • 12
    • 0001068310 scopus 로고
    • Sequencing a one state-variable machine: A solvable case of the traveling salesman problem
    • P.C. Gilmore and R.E. Gomory, Sequencing a one state-variable machine: A solvable case of the traveling salesman problem, Operations Research 12 (1964) 665-679.
    • (1964) Operations Research , vol.12 , pp. 665-679
    • Gilmore, P.C.1    Gomory, R.E.2
  • 14
    • 0023381816 scopus 로고
    • Largest AGVS in North America transforms truck assembly
    • L. Gould, Largest AGVS in North America transforms truck assembly, Modern Materials Handling 42 (1987) 58-63.
    • (1987) Modern Materials Handling , vol.42 , pp. 58-63
    • Gould, L.1
  • 16
    • 0025465093 scopus 로고
    • AGV-served assembly lines: Influence of sequencing and launch policies on system performances
    • V. Grasso, AGV-served assembly lines: Influence of sequencing and launch policies on system performances, International Journal of Production Research 28 (1990) 1385-1399.
    • (1990) International Journal of Production Research , vol.28 , pp. 1385-1399
    • Grasso, V.1
  • 17
    • 0042612417 scopus 로고
    • An expert system for design of automated material handling systems (INSIMAS)
    • W. Grosseschallau and A. Kusiak, An expert system for design of automated material handling systems (INSIMAS), Material Flow 2 (1985) 157-166.
    • (1985) Material Flow , vol.2 , pp. 157-166
    • Grosseschallau, W.1    Kusiak, A.2
  • 18
    • 0031142587 scopus 로고    scopus 로고
    • Scheduling in robotic cells: Classification, two and three machine cells
    • N.G. Hall, H. Kamoun and C. Sriskandarajah, Scheduling in robotic cells: Classification, two and three machine cells, Operations Research 45 (1997) 421-439.
    • (1997) Operations Research , vol.45 , pp. 421-439
    • Hall, N.G.1    Kamoun, H.2    Sriskandarajah, C.3
  • 19
    • 0043142194 scopus 로고    scopus 로고
    • Operational decisions in AGV-served flowshop loops: Fleet sizing and decomposition
    • N.G. Hall, C. Sriskandarajah and T. Ganesharajah, Operational decisions in AGV-served flowshop loops: Fleet sizing and decomposition, Annals of Operations Research 107 (2001) 189-209.
    • (2001) Annals of Operations Research , vol.107 , pp. 189-209
    • Hall, N.G.1    Sriskandarajah, C.2    Ganesharajah, T.3
  • 21
    • 0024680284 scopus 로고
    • Control of material handling transporter in automated manufacturing
    • M.-H. Han and L.F. McGinnis, Control of material handling transporter in automated manufacturing, IIE Transactions 21 (1989) 184-190.
    • (1989) IIE Transactions , vol.21 , pp. 184-190
    • Han, M.-H.1    McGinnis, L.F.2
  • 23
    • 0026124166 scopus 로고
    • Automated two-machine flowshop scheduling: A solvable case
    • H. Kise, T. Shioyama and T. Ibaraki, Automated two-machine flowshop scheduling: A solvable case, IIE Transactions 23 (1991) 10-16.
    • (1991) IIE Transactions , vol.23 , pp. 10-16
    • Kise, H.1    Shioyama, T.2    Ibaraki, T.3
  • 24
    • 0002201608 scopus 로고
    • Automated guided vehicle systems: Applications, controls and planning
    • G.A. Koff, Automated guided vehicle systems: Applications, controls and planning, Material Flow 4 (1987) 3-16.
    • (1987) Material Flow , vol.4 , pp. 3-16
    • Koff, G.A.1
  • 25
    • 0043113319 scopus 로고
    • Material handling in flexible manufacturing systems
    • A. Kusiak, Material handling in flexible manufacturing systems, Material Flow 2 (1985) 79-95.
    • (1985) Material Flow , vol.2 , pp. 79-95
    • Kusiak, A.1
  • 27
    • 0020140765 scopus 로고
    • Design of automatic guided vehicle systems
    • W.L. Maxwell and J.A. Muckstadt, Design of automatic guided vehicle systems, IIE Transactions 14 (1982) 114-124.
    • (1982) IIE Transactions , vol.14 , pp. 114-124
    • Maxwell, W.L.1    Muckstadt, J.A.2
  • 28
    • 0003449926 scopus 로고
    • Institute of Industrial Engineers Press, Norcross, GA
    • Y. Monden, Toyota Production System (Institute of Industrial Engineers Press, Norcross, GA, 1983).
    • (1983) Toyota Production System
    • Monden, Y.1
  • 30
    • 0027554501 scopus 로고
    • A faster strongly polynomial minimum cost flow algorithm
    • J.B. Orlin, A faster strongly polynomial minimum cost flow algorithm, Operations Research 41 (1993) 338-350.
    • (1993) Operations Research , vol.41 , pp. 338-350
    • Orlin, J.B.1
  • 31
    • 0026188481 scopus 로고
    • Scheduling of a two-machine flowshop with travel time between machines
    • S. Panwalkar, Scheduling of a two-machine flowshop with travel time between machines, Journal of the Operational Research Society 42 (1991) 609-613.
    • (1991) Journal of the Operational Research Society , vol.42 , pp. 609-613
    • Panwalkar, S.1
  • 32
    • 84974857090 scopus 로고
    • Scheduling parts in a combined production-transportation work cell
    • H.I. Stern and G. Vitner, Scheduling parts in a combined production-transportation work cell, Journal of the Operational Research Society 41 (1990) 625-632.
    • (1990) Journal of the Operational Research Society , vol.41 , pp. 625-632
    • Stern, H.I.1    Vitner, G.2
  • 34
    • 0022904292 scopus 로고
    • Guided vehicles set manufacturing in motion
    • December
    • J. Zygmont, Guided vehicles set manufacturing in motion, High Technology 16 (December 1986).
    • (1986) High Technology , vol.16
    • Zygmont, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.