-
1
-
-
0019577249
-
The design and analysis of heuristics
-
BALI. M., and MAGAZINE, M., 1981, The design and analysis of heuristics, Networks, 11, 215-219.
-
(1981)
Networks
, vol.11
, pp. 215-219
-
-
Bali, M.1
Magazine, M.2
-
2
-
-
0020013653
-
A STATE-OF-THE-ART SURVEY OF DISPATCHING RULES FOR MANUFACTURING JOB SHOP OPERATIONS
-
BIACKSTONE, J. H., PHILLIPS, D. T., AND HOGG, G. L., 1982, A STATE-OF-THE-ART SURVEY OF DISPATCHING RULES FOR MANUFACTURING JOB SHOP OPERATIONS. International Journal of Production Research, 20, 27-45. ’
-
(1982)
International Journal of Production Research
, vol.20
, pp. 27-45
-
-
Biackstone, J.H.1
Phillips, D.T.2
Hogg, G.L.3
-
3
-
-
0026253933
-
Intelligent dispatching for flexible manufacturing
-
CHANDRA, J., and TALAVAGE.J., 1991, Intelligent dispatching for flexible manufacturing. InternationalJournal of Production Research, 29, 2259-2278.
-
(1991)
Internationaljournal of Production Research
, vol.29
, pp. 2259-2278
-
-
Chandra, J.1
Talavage, J.2
-
4
-
-
0023817926
-
Adynamic programming solution to the dynamic, multi-item, single-machine scheduling problem
-
GASCON, A., and LEACHMAN, R. C., 1988, Adynamic programming solution to the dynamic, multi-item, single-machine scheduling problem. Operations Research, 36, 50-56.
-
(1988)
Operations Research
, vol.36
, pp. 50-56
-
-
Gascon, A.1
Leachman, R.C.2
-
5
-
-
85008816273
-
(North River Press, Croton-on-Hudson, New York)
-
GOLDRATI. E. M., 1990, The Haystack Syndrome (North River Press, Croton-on-Hudson, New York).
-
(1990)
The Haystack Syndrome
-
-
Goldrati, E.M.1
-
6
-
-
6144272832
-
Scheduling in random job shop type flexible manufacturing systems. PhD Dissertation, College of Business
-
HUTCHISON, J., 1989, Scheduling in random job shop type flexible manufacturing systems. PhD Dissertation, College of Business, University of Houston.
-
(1989)
-
-
Hutchison, J.1
-
7
-
-
0026155862
-
Scheduling approaches for random job shop flexible manufacturing systems
-
HUTCHISON, J., LEONG, K., SNYDER, D., and WARD, P., 1991, Scheduling approaches for random job shop flexible manufacturing systems. International Journal of Production Research, 29, 1053-1067.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 1053-1067
-
-
Hutchison, J.1
Leong, K.2
Snyder, D.3
Ward, P.4
-
8
-
-
0025493442
-
Optimal dispatching in a periodic review cellular manufacturing system
-
LIU, J. J., 1990, Optimal dispatching in a periodic review cellular manufacturing system. Operation Research, 38, 893-901.
-
(1990)
Operation Research
, vol.38
, pp. 893-901
-
-
Liu, J.J.1
-
10
-
-
0026172827
-
Knowledge-based approaches for scheduling problems: A survey
-
NORONHA, S. J., and SARMA, V. V. S., 1991, Knowledge-based approaches for scheduling problems: a survey. IEEE Transactions on Knowledge and Data Engineering, 3, 160-171.
-
(1991)
IEEE Transactions on Knowledge and Data Engineering
, vol.3
, pp. 160-171
-
-
Noronha, S.J.1
Sarma, V.V.S.2
-
11
-
-
0003961852
-
Heuristics: Intelligent Search Strategies for Computer Problem solving (Addision-Wesley, Cambridge
-
PEARL, J., 1984, Heuristics: Intelligent Search Strategies for Computer Problem solving (Addision-Wesley, Cambridge, MA).
-
(1984)
-
-
Pearl, J.1
-
12
-
-
0026117836
-
Flowshop scheduling with setup, processing andremoval times separated
-
PROUST, C., Gurr A, J. N. D., and DESCHAMPS, V., 1991, Flowshop scheduling with setup, processing andremoval times separated. International Journal of Production Research, 29, 479-493.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 479-493
-
-
Proust, C.1
Gurr, A.J.2
-
13
-
-
0025699540
-
Drum-buffer-ropeshop floor control
-
SCHRAGENHEIM, E., and RONEN, B., 1990, Drum-buffer-ropeshop floor control. Production and Inventory Management Journal, 31, 18-22.
-
(1990)
Production and Inventory Management Journal
, vol.31
, pp. 18-22
-
-
Schragenheim, E.1
Ronen, B.2
-
14
-
-
0026414517
-
Buffer management: A diagnostic tool Tor production control
-
SCHRAGENHEIM, E., and Ronen, B., 1991, Buffer management: a diagnostic tool Tor production control. Production and Inventory Management Journal, 32, 74-79.
-
(1991)
Production and Inventory Management Journal
, vol.32
, pp. 74-79
-
-
Schragenheim, E.1
Ronen, B.2
-
15
-
-
6144236296
-
A pattern-directed approach to FMS scheduling
-
SHAW, M. J., 1988, A pattern-directed approach to FMS scheduling.Annals of Operations Research, 15, 353-376.
-
(1988)
Annals of Operations Research
, vol.15
, pp. 353-376
-
-
Shaw, M.J.1
-
16
-
-
0000903496
-
Minimizing the sum of the job completion times in the two-machine flow shopby Lagrangian relaxation
-
VANDE VELDE, S. L., 1990, Minimizing the sum of the job completion times in the two-machine flow shopby Lagrangian relaxation. Annals of Operations Research, 26, 257-268.
-
(1990)
Annals of Operations Research
, vol.26
, pp. 257-268
-
-
Vande Velde, S.L.1
|